Search for European Projects

28 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The problem: finding the right patient for the right treatmentDespite a large and growing disease burden in osteoarthritis (OA), many pharmaceutical companies have de-emphasized or even abandoned OA drug development due to perceived hurdles. Crucial in this is the lack of appropriate outcome measures that can robustly identify patient benefit from a specific therapy. The lack of specific and sensi ...
Read Project

 25

 FINISHED 

Combatting Bacterial Resistance in Europe (COMBACTE-NET)

Start date: Jan 1, 2013, End date: Dec 31, 2019,

The emergence of Antibiotic-resistant bacteria (ARB) is a global problem, having recently been elevated to the top three threats identified by the World Health Organisation (WHO), and subject of numerous national and international government activities, including the Trans-Atlantic Task Force on Antimicrobial Resistance established by the US and EU presidencies. The estimated costs of ARB are aro ...
Read Project

 38

 FINISHED 
ECRIN is a distributed ESFRI-roadmap pan-European infrastructure designed to support multinational clinical research, making Europe a single area for clinical studies, taking advantage of its population size to access patients. Servicing multinational trials started during its preparatory phase, and it now applies for an ERIC status by 2011. The ERIC budget will be restricted to core activities re ...
Read Project

 48

 FINISHED 
LASHARE will develop a robust assessment framework for innovative laser equipment paving the way for new manufacturing applications. It will carry out a large number of assessment experiments for a variety of laser equipment targeting strategic manufacturing areas for Europe.The Laser Equipment Assessment (LEA) will be carried out by a trio of research/supplier/user partners. Each LEA will define ...
Read Project

 40

 FINISHED 
European manufacturing industry faces increasing product variances resulting as a consequence of frequent innovation, short product lifecycles, small series production, and shrinking production cycles. At the same time, production cost must be continuously reduced.Agile, transformable and re-usable automation and robotics is be a key enabler to manage those trends. However, few robotic components ...
Read Project

 34

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Novel Methods in Computational Finance (STRIKE)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

"In recent years the computational complexity of mathematical models employed in financial mathematics has witnessed a tremendous growth. Advanced numerical techniques are imperative for the most present-day applications in financial industry.The motivation for this training network is the need for a network of highly educated European scientists in the field of financial mathematics and computati ...
Read Project

 11

 FINISHED 
PhoxTrot is a large-scale research effort focusing on high-performance, low-energy and cost and small-size optical interconnects across the different hierarchy levels in Data Center and High-Performance Computing Systems: on-board, board-to-board and rack-to-rack. PhoxTrot will tackle optical interconnects in a holistic way, synergizing the different fabrication platforms (CMOS electronics, Si-pho ...
Read Project

 22

 FINISHED 

Future Internet - Core (FI-Core)

Start date: Sep 1, 2014, End date: Sep 30, 2016,

FI-WARE has started to materialize as a powerful foundation for the Future Internet. FI-WARE is an innovative, open cloud-based infrastructure for cost-effective creation and delivery of services, at a scale not seen before. FI-WARE is now well under way to successfully achieve its goals of boosting the effectiveness of creating new services of high economic and societal value, reinforcing EU comp ...
Read Project

 33

 FINISHED 

Fabrication and Functionalization of BioMedical Microdevices (FaBiMed)

Start date: Sep 2, 2013, End date: Sep 1, 2016,

The aim of FaBiMed proposal is to improve and develop new manufacturing techniques, based on micromoulding, specific for biomedical microdevices. The project will be to reducing the cost of mass production of diagnosis and therapeutic micro devices which have a common problematic: medium sized batches, customization needs, micron-scale geometrical features. These include optofluidic sensors (MIR t ...
Read Project

 12

 FINISHED 
For the first time, more than 50% of the world's population live in urban areas. By 2050, c. 70% of people are likely to be city dwellers, compared with less than 30% in 1950. This trend brings with it increased security and safety threats in urban areas, not least to urban built infrastructure. The central aim of HARMONISE (A Holistic Approach to Resilience and Systematic ActiOns to Make Large Sc ...
Read Project

 15

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
The overall scope of the DAPhNE project is to develop and demonstrate a package of integrated solutions for energy intensive processes (ceramics, cement and glass), based on tuning micro-wave technologies to the material characteristics and on intelligent control systems, to provide real time information about the energy consumption as well as the product quality.Microwave heating is now a well e ...
Read Project

 18

 FINISHED 

Highly Efficient Tubular Membranes for Oxy-Combustion (HETMOC)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

This project will develop and demonstrate Highly Efficient Tubular Membranes for OxyCombustion. Oxycombustion is a promising option for implementing cost-efficient carbon capture and sequestration (CCS) in future coal fired power plants. The use of oxygen membranes in the process has the potential to significantly reduce the efficiency losses associated with the capture and to improve the overall ...
Read Project

 8

 FINISHED 

Transitions to the Urban Water Services of Tomorrow (TRUST)

Start date: May 1, 2011, End date: Apr 30, 2015,

The European project initiative TRUST will produce knowledge and guidance to support TRansitions to Urban Water Services of Tomorrow, enabling communities to achieve sustainable, low-carbon water futures without compromising service quality. We deliver this ambition through close collaboration with problem owners in ten participating pilot city regions under changing and challenging conditions in ...
Read Project

 33

 FINISHED 
The COMBIOSERVE consortium aims to identify the conditions and principles of successful community-based conservation in selected locations in Mexico, Brazil and Bolivia, working in partnership with local Civil Society Organisations (CSOs) and indigenous communities. Many Latin American and Caribbean rural and indigenous communities have historically developed strategies to regulate land use and co ...
Read Project

 11

 FINISHED 
ICE is focused on the development of a new air conditioning and heat pump system based on the Magneto Caloric heat pump and a on the redesign of the cabin air conditioning and microclimate control to use is the most efficient way the cooling and heating power.The Consortium includes a SME having a relevant and unique KH on Magneto Caloric heat pump, a OEM supported by an acknowledged automotive re ...
Read Project

 6

 FINISHED 
While ambient air pollution is being successfully monitored throughout the EU, the situation for indoor air pollution is not nearly as positive. This is of particular concern, as a much wider range of air pollutants are found at high levels indoors than outdoors. Indoor air quality is a major concern to businesses, building managers, tenants, and employees because it can impact the health, comfort ...
Read Project

 11

 FINISHED 
Groundwater resources are facing increasing pressure from consumptive uses (irrigation, water supply, industry) and contamination by diffuse loading (e.g. agriculture) and point sources (e.g. industry). This cause major threat and risks to our most valuable water resource and on ecosystems dependent on groundwater. New information is need on how to better protect groundwaters and groundwater depen ...
Read Project

 28

 FINISHED 
ETB-PRO will reduce the fragmentation of ERA and support high quality R&D&I project cooperation of European biotech SMEs by building on success factors of the predecessor project and establish a sustainable joint program with high funding impact. This will be done in two steps thereby using four calls with a funding volume of € 35 Mio each as an implementation tool. First step: Integration ETB-PRO ...
Read Project

 16

 FINISHED 
The objective of this proposal is the creation of a leading edge network supporting a much enhanced range of both network and added value services targeted at end-users across the GÉANT service area. A principal goal will be to create a portfolio of seamless multi-domain services. In contrast to its predecessor, GN2, much more emphasis is placed on service development and service introduction.Init ...
Read Project

 35

 FINISHED 
A major challenge facing European industry involves the development of more specific, energy saving processes with less environmental impact. The recent development of Metal Organic Frameworks (MOFs) may prove a major milestone in achieving these goals. MACADEMIA project is an extension to an FP6 STREP (DeSANNS) which highlighted some MOF materials for CO2 capture and storage. It will expand and c ...
Read Project

 17

 FINISHED 
FIEMSER (Friendly Intelligent Energy Management System for Residential Building) addresses the need of achieving energy positive buildings through solutions based on a rational consumption of energy, local generation and an increase in the consciousness of the building owners towards their energy consumption habits.The main goal of FIEMSER matches with the challenges of the Call by aiming to build ...
Read Project

 8

 FINISHED 

Immersion in the Science Worlds through Arts (ISWA)

Start date: Mar 1, 2011, End date: Feb 28, 2013,

The objective of the project is to use art to communicate emotions related to the understanding of nature and to stimulate students create artistic initiatives able to demonstrate commonalities of artistic and scientific fascination. The objective will be pursued according to two strictly related aspects:1)produce artistic works based on scientific phenomena at a professional level;2)stimulate stu ...
Read Project

 16

 FINISHED 
The TranCoSME project intends to support the European network of National Contact Points for the SME-specific measures of the 7th Framework Programme (NCP SME) in their support to proposers in their respective countries. Objectives are to deliver a better quality of service, to increase the efficiency of the work and to enhance networking between the NCPs in Europe. These goals will be achieved by ...
Read Project

 42

 FINISHED 
Future networks became a central topic with a large debate whether moving towards the new networked society will be evolutionary or disruptive. In the future networked society the physical and the digital worlds will merge based on the massive usage of wireless sensor networks. Objects will be able to identify and locate themselves and to communicate through radio interfaces. Self-organized edge n ...
Read Project

 37

 FINISHED 

Critical Response in Security and Safety Emergencies (CRISYS)

Start date: Feb 1, 2011, End date: May 31, 2012,

"The EU regularly suffers from natural and man-made disaster, the social and economical consequences of which may adversely affect its growth and competitiveness. There is a growing vulnerability to disasters and subsequently an urgent need to improve operational capacities and capabilities of Member States. Furthermore, the Lisbon Treaty will enlarge the role of the EU and allow for stronger coor ...
Read Project

 16

 FINISHED 

Recovered Paper Sorting with Innovative Technologies (SORT IT)

Start date: May 1, 2008, End date: Oct 31, 2011,

SORT IT aims at developing new technologies for a more efficient and profitable sorting of recovered paper and board from various collection systems. These include: * New sensors based on near infrared spectrometry, image analysis and colour measurement (WP 2) * New physical separation devices like robots (WP 3) * New sorting concepts (WP 4) The new sorting devices will be implemented into an indu ...
Read Project

 14