Search for European Projects

8 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The key objective of PowerBase “Enhanced substrates and GaN pilot lines enabling compact power applications” is to ensure the availability of Electronic Components and Systems (ECS) for key markets and for addressing societal challenges, aiming at keeping Europe at the forefront of the technology development, bridging the gap between research and exploitation, creating economic and employment grow ...
Read Project

 40

 FINISHED 
Europe’s strengths are based on the deep knowledge and market position in automotive industry, industrial electronics industry and leading know how for More-than-Moore based embedded system. It is of vital interest for the electronics manufacturers in Europe to have fast access to reliable prototypes of electronic devices as well as competitive advanced manufacturing of such devices made in Europe ...
Read Project

 26

 FINISHED 

People Centric easy to implement e-mobility (FREE-MOBY)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The FREE-MOBY project is focused to the implementation of easy to deploy micro fully electrical vehicles (450-650kg and speeds up to 90+ km/h)) and city EVs (650-1000kg).By an extra cost of only 15% solar installations in roof houses can be integrated with robust battery packs that can smooth peak powers up to 30%. Solar parking and integrated photovoltaic-battery installations are becoming more a ...
Read Project

 14

 FINISHED 

Energy Efficient Converters using GaN Power Devices (E2COGAN)

Start date: Apr 1, 2013, End date: Mar 31, 2016,

The E2COGaN project will target the demonstration of GaN-on-Si as a disruptive power device technology platform through the whole value chain up to demonstrators with high industrial, societal and environmental relevance. Its innovative character will be proven through a well-balanced and application specific trade-off between the “corner” benefits given by higher efficiency, higher switching freq ...
Read Project

 25

 FINISHED 
AVTR addresses the development of the complete Electrical powertrain optimised as a whole of systems:- Energy saving in pure urban drive up to 20% with respect to state of-the-art fixed transmission ratio,- Avoid the use of Permanent Magnet Motors because non optimal elements when integrated in a multi ratios transmission PWT. When designing for energy savings, the maximum efficiency is calculate ...
Read Project

 8

 FINISHED 

Internet of Energy for Electric Mobility (IoE)

Start date: May 1, 2011, End date: Oct 31, 2014,

The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circu ...
Read Project

 43

 FINISHED 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Read Project

 37

 FINISHED 
The objective of the project is the development of nanoelectronics technologies, devices, circuits architectures and modules for electrical cars/vehicles and demonstration of these modules in a final systems.Emissions from road vehicles have to be reduced substantially in the future. The ultimate goal of most car manufacturers is to get to a completely electric vehicle, protecting the environment ...
Read Project

 32