Search for European Projects

26 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The overall aim of the SOTERIA project is to improve the understanding of the ageing phenomena occurring in reactor pressure vessel (RPV) steels and in the internal steels (internals) in order to provide crucial information to regulators and operators to ensure safe long-term operation (LTO) of existing European nuclear power plants (NPPs). SOTERIA has set up a collaborative research consortium wh ...
Read Project

 25

 FINISHED 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Read Project

 25

 FINISHED 
The multidisciplinary project will address key technical issues that must be tackled to support the implementation of planned geological disposal projects for higher-level radioactive wastes across the EU. Our current understanding of the impact of microbial metabolism on the safety of geological repositories remains tenuous, even though microorganisms may have controlling influences on wasteform ...
Read Project

 15

 FINISHED 
The thermal-hydraulics Simulations and Experiments for the Safety Assessment of Metal cooled reactor (SESAME) project supports the development of European liquid metal cooled reactors (ASTRID, ALFRED, MYRRHA, SEALER). The project focusses on pre-normative, fundamental, safety-related, challenges for these reactors with the following objectives:• Development and validation of advanced numerical app ...
Read Project

 24

 FINISHED 

The supercritical CO2 Heat Removal System (sCO2-HeRo)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

"Raising nuclear reactor safety to a higher level - The supercritical CO2 heat removal system - "sCO2-HeRo"The “supercritical CO2 heat removal system”, sCO2-HeRo, safely, reliably and efficiently removes residual heat from nuclear fuel without the requirement of external power sources. This system therefore can be considered as an excellent backup cooling system for the reactor core or the spent f ...
Read Project

 6

 FINISHED 

Visegrad Initiative for Nuclear Cooperation (VINCO)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

After a common expression of willingness to cooperate and legal establishment of V4G4 Centre of Excellence Association, VINCO project represents the next stage of capacity building in nuclear technologies in Central European countries. Participating countries defined already their specializations: helium technology in Czech Republic, design and safety analyses in Slovakia, fuel studies in Hungary ...
Read Project

 6

 FINISHED 
The main objective of the proposed CORONA II project is to enhance the safety of nuclear installations through further improvement of the training capabilities aimed at building up the necessary personnel competencies.Specific objective of the proposed CORONA II project is to proceed with the development of state-of-the-art regional training center for VVER competence (which will be called CORONA ...
Read Project

 9

 FINISHED 
The coordination action SITEX-II aims at implementing in practice the activities along with the interaction modes issued by the FP7 program SITEX project (2012-2013), in view of developing an Expertise function network. This network is expected to ensure a sustainable capability of developing and coordinating joint and harmonized activities related to the independent technical expertise in the fie ...
Read Project

 18

 FINISHED 

Towards a Joint Programming on Radioactive Waste Disposal (JOPRAD)

Start date: Jun 1, 2015, End date: Nov 30, 2017,

The goal of this project is to prepare the setting up of a “Joint Programming on Radioactive Waste Disposal” that would be established to coordinate at the European level, national research programmes and the associated research and development (R&D) activities on geological disposal for high activity long lived radioactive waste. This action includes reviewing of all strategic aspects linked to a ...
Read Project

 10

 FINISHED 
The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Read Project

 32

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 
"The entire project of cooperation with Russia titled “Strengthening of Cooperation and Exchange for Nuclear Education and Training between the European Union and the Russian Federation” consist of two parallel projects on the EU side and the Russian side. The objectives of the entire project are:- based on the achievements of the FP7 ENEN-RU project, to further define a common basis for effective ...
Read Project

 11

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 
"The ARCADIA project has been conceived so as to provide a twofold support to the further development of nuclear research programs in the NMS, targeting two major areas included in the Strategic Research and Innovation Agenda of SNETP: ESNII, through the support of the ALFRED project towards its realization in Romania, and NUGENIA, approaching remaining safety aspects of Gen III/III+ that could be ...
Read Project

 28

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 

Access to Large Infrastructures in China and Europa (ALICE)

Start date: Jun 1, 2012, End date: May 31, 2016,

"The ALICE project is a co-ordination action between European and Chinese partners with the objective to develop transnational access to large material test infrastructures, with the emphasis on irradiation facilities. By collaboration and exchange between this European project and its Chinese counterpart, both technical as well as administrative and organizational issues, linked to transnational ...
Read Project

 5

 FINISHED 

NUCLEAR REACTOR SAFETY SIMULATION PLATFORM (NURESAFE)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

After the 2011 disaster that occurred in Japan, improvement of nuclear safety appears more clearly as a paramount condition for further development of nuclear industry. The NURESAFE project addresses engineering aspects of nuclear safety, especially those relative to design basis accidents (DBA). Although the Japanese event was a severe accident, in a process of defense-in-depth, prevention and c ...
Read Project

 25

 FINISHED 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Read Project

 22

 FINISHED 
The ALLIANCE project focuses on the preparatory phase for developing the ALLEGRO demonstrator. This is based on the Gas Fast Reactor (GFR) concept, one of the 2 alternative systems under the SET-Plan’s European Sustainable Nuclear Industrial Initiative (ESNII), expected to be built in Central Europe. ALLIANCE covers a number of preliminary studies on fuel management, R&D roadmap & infrastructures ...
Read Project

 9

 FINISHED 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Read Project

 34

 FINISHED 

MATerials TEsting and Rules (MATTER)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Read Project

 30

 FINISHED 

Supercritical Water Reactor - Fuel Qualification Test (SCWR-FQT)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

"The SCWR-FQT project is related to the HPLWR Phase 2 European project, executed between 2006 and 2010, focused on the design of the European supercritical water cooled reactor, HPLWR. The scope of the SCWR-FQT Euratom-China parallel project is to design an experimental facility for qualification of fuel for the supercritical water-cooled reactor. The facility is destined to be operated in the LVR ...
Read Project

 10

 FINISHED 
The essence of the project is to provide a special purpose structure for training and qualification of personnel for serving VVER technology as one of nuclear power options used in EU. Such approach should allow unifying existing VVER related training schemes according to IAEA standards and commonly accepted criteria recognized in EU. The structure is based on three general pillars: 1) Training sc ...
Read Project

 12

 FINISHED 
"Nuclear power in general requires highly qualified, skilled and well trained professionals in order to assure the supply of energy and to secure safe operation and the development of reliable technology. The recent Fukushima nuclear accident in March 2011 firmly underscores such requirements.At the same time, the IAEA and OECD/NEA has observed a shortage of high level graduates educated in the nu ...
Read Project

 7

 FINISHED 

European Gas Cooled Fast Reactor (GoFastR)

Start date: Mar 1, 2010, End date: Feb 28, 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Read Project

 22

 FINISHED 

ADvanced Reactor Initiative And Network Arrangement (ADRIANA)

Start date: Feb 1, 2010, End date: Jul 31, 2011,

"The coordinating action ADRIANA (ADvanced Reactor Initiative And Network Arrangement) is proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The project as the base for the current long-term taking place coordination activities of Euroatom under ...
Read Project

 15