Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
G2P-SOL is a research alliance bringing together the major European and International repositories of germplasm with public and private institutions active in genomics, phenotyping and breeding in the four major Solanaceous crops: potato, tomato, pepper and eggplant. These four crops constitute 66% of the value of European horticultural production, and over 65,000 accessions are available within t ...
Read Project

 20

 FINISHED 
The overall objective of FISSAC project is to develop and demonstrate a new paradigm built on an innovative industrial symbiosis model towards a zero waste approach in the resource intensive industries of the construction value chain, tackling harmonized technological and non technological requirements, leading to material closed-loop processes and moving to a circular economy.A methodology and a ...
Read Project

 26

 FINISHED 
The main goal of VULKANO is the retrofitting of two types of industrial furnaces, namely preheating and melting, applied on three energy–intensive sectors (steel, ceramic and aluminium) with a huge number of potential users in Europe. Thus, this project aims to design, implement and validate an advanced retrofitting integrated solution to increase the energy and environmental efficiency in existin ...
Read Project

 12

 FINISHED 

Organic Rankine Cycle - Prototype Link to Unit Storage (ORC-PLUS)

Start date: May 1, 2015, End date: Apr 30, 2019,

In line with the call H2020- LCE-03-2014, ORC-PLUS focuses on increasing the technological performance of renewable energy systems, reducing costs and improving dispatchability. The aim is to develop an optimized combination of innovative Thermal Energy Storage-TES (specialized for CSP scale 1-5 MWe) and engineering solutions to improve the number of production hours of an existing small CSP plant ...
Read Project

 7

 FINISHED 
"The Strategic Research Agenda of the EU Sustainable Nuclear Energy Technical platform requires new large infrastructures for its successful deployment. MYRRHA has been identified as a long term supporting research facility for all ESNII systems and as such put in the high-priority list of ESFRI. The goal of MAXSIMA is to contribute to the ""safety in MYRRHA"" assessment.MAXSIMA has five technical ...
Read Project

 14

 FINISHED 
The main objective of the project is to develop solutions to recover the waste heat produced in energetic intensive processes of industrial sectors such as cement, glass, steelmaking and petrochemical and transform it into useful energy. These solutions will be designed after an evaluation of the energetic situation of these four industries and will deal with the development of Waste Heat Recovery ...
Read Project

 9

 FINISHED 

DEVELOPING SKILLS AND COMPETENCIES IN VOCATIONAL TRAINING

Start date: Sep 1, 2016, End date: Dec 31, 2017,

This project is designed and developed by IKASLAN, Association of public vocational training centres public of the country Basque, to enable students of average degree of vocational training cycles and from virtually all professional families that are taught in the CAV can make a stay in different European countries. It is a continuation of the projects that we perform as response wing demand of p ...
Read Project

 38

 FINISHED 

solving CHAllenges in Nuclear DAta (CHANDA)

Start date: Dec 1, 2013, End date: Nov 30, 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Read Project

 35

 FINISHED 
The European Energy Research Alliance, set-up under the European Strategic Energy Technology Plan, has launched an initiative for a Joint Programme on Nuclear Materials (JPNM). The JPNM aims at establishing key priorities in the area of advanced nuclear materials, identifying funding opportunities and harmonizing this scientific & technical domain at the European level by maximizing complementarit ...
Read Project

 32

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 
"With this proposal, a qualified and assorted representative group of the European Materials community, intend to propose an activity for further boosting and reinforcing a concept launched by Alliance for Materials (A4M): the creation of a strong, sustainable, inclusive network where any European Materials players (from Industry, Research, University) could feel comfortable and can gain real val ...
Read Project

 20

 FINISHED 
Micro & nanofluidics is characterized by a broad number of research groups and enterprises developing knowledge and technology for many diverse application fields. The creation of a European network with the main research groups working on these lines will allow researchers to analyze better the main challenges for micro & nanofluidics applications (system integration, manufacturability and afford ...
Read Project

 9

 FINISHED 

enhancing Innovation and Key Account Management by sme2EU (I-KAM2EU)

Start date: Jan 1, 2015, End date: Dec 31, 2016,

The proposal aims at providing the two new Enterprise Europe Network services:1) Enhancing SME’s Innovation Management Capacity (EIMC) for innovating SMEs, and2) Key Account Management (KAM) for SME Instrument beneficiaries in the three Italian regions covered by the EEN consortium “SME2EU”: Tuscany, Marche and Umbria.These new services will be provided in an additional but integrated way to the u ...
Read Project

 7

 FINISHED 

Fast Reactor Experiments for hYbrid Applications (FREYA)

Start date: Mar 1, 2011, End date: Feb 29, 2016,

"Building up on the former activities accomplished in the previous FPs, namely MUSE in FP5 and EUROTRANS in FP6, it is proposed in the FREYA project to extend the investigations of the subcritical configurations for validation of the methodology for on-line reactivity monitoring of ADS systems. The investigations will be related to the different subcriticality levels for the nominal operation mode ...
Read Project

 17

 FINISHED 
The project aims at developing new technology routes to integrate waste materials in the production cycle of concrete, for both ready-mixed and pre-cast applications, resulting in an innovative light-weight, eco-compatible and cost-effective construction material, made by all-waste raw materials and characterized by low embodied energy and CO2 and by improved ductility and thermal insulation perfo ...
Read Project

 16

 FINISHED 
"IMPACTS - The impact of the quality of CO2 on transport and storage behaviour will underpin the realisation of the EU CCS European Industrial Initiative implementation plan by developing knowledge and technology needed for Carbon Dioxide Capture, Transport and Storage (CCS) pilots and large-scale demonstrations. IMPACTS is linked to demonstration projects, and will therefore benefit from realisti ...
Read Project

 12

 FINISHED 

Optimization of Oxygen-based CFBC Technology with CO2 capture (O2GEN)

Start date: Oct 18, 2012, End date: Oct 17, 2015,

The project objective is to demonstrate the concept of the second generation oxyfuel combustion that reduce significantly (50%) the overall efficiency penalty of CO2 capture into power plants, from approximately 12 to 6 efficiency points.One of the main drawbacks of CCS is the additional energy used for operation. This energetic penalty reduces the power plant efficiency, and increases the cost of ...
Read Project

 12

 FINISHED 
The deployment of a large hydrogen infrastructure with societal acceptance relies on the development of appropriate codes and standards to ensure safety. While hydrogen infrastructures are gradually being built all over the world, there exist no international standard to properly ensure fitness for service of pressure vessels subject to hydrogen enhanced fatigue. For example, high pressure compres ...
Read Project

 9

 FINISHED 
The intelligent and cost effective use of CCS technologies requires new strategies to increase the net efficiency of coal fired power plants. Among them, the most promising are summarised as below:- Increase working steam temperature and pressure in new USC power plants (350-370 bar, 700/720°C minimum), and hence increase the severity of fireside operating conditions,- Promote clean coal technolog ...
Read Project

 26

 FINISHED 

Thermal-hydraulics of Innovative Nuclear Systems (THINS)

Start date: Feb 1, 2010, End date: Jan 31, 2015,

For the long-term development of nuclear power, innovative nuclear systems such as Gen-IV reactors and transmutation systems need to be developed for meeting future energy challenges. Thermal-hydraulics is recognized as a key scientific subject in the development of innovative reactor systems. This project is devoted to important crosscutting thermal-hydraulic issues encountered in various innovat ...
Read Project

 24

 FINISHED 

Services provided by Cinema foR ImPlementing new acTion (SCRIpT)

Start date: Jun 1, 2014, End date: Dec 31, 2014,

"The action “Establishing services enhancing the innovation management capacity of SME's in the Enterprise Europe Network" represents an important breakthrough in delivering the EEN services. Until now the EEN consortia partners’ role was mainly catalyzing the SMEs innovation needs with the innovative product, services and processes provided by other companies or research centres, with the aim of ...
Read Project

 11

 FINISHED 

MATerials TEsting and Rules (MATTER)

Start date: Jan 1, 2011, End date: Dec 31, 2014,

The 2010-2012 implementation plan of the European Sustainable NuclearIndustrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SF ...
Read Project

 30

 FINISHED 
OPTS project aims at developing a new Thermal Energy Storage (TES) system based on single tank configuration using stratifying Molten Salts (MS, Sodium/Potassium Nitrates 60/40 w/w) as heat storage medium at 550°C maximum temperature, integrated with a Steam Generator (SG), to provide efficient, reliable and economic energy storage for the next generation of trough and tower plants.The three-year ...
Read Project

 11

 FINISHED 
The ambition of this project is to enable the utilisation of the full potential of renewable energy (up to covering 100% of the energy demand on district level). In order to reach this goal, the E-hub concept is developed, which is crucial for the implementation of such a large share of renewables. An E-Hub is a physical cross point, similar to an energy station, in which energy and information st ...
Read Project

 19

 FINISHED 
Currently, there is a lack of consistent coordination between the activities of the various ETPs, which has led to a diverse range of ideas as to what is important to European materials developments, and consequently a somewhat fragmented support for these developments. In 2010, a group of ETPs (EuMaT, Suschem, Manufuture, FTC, ESTEP and SMR) with most significant material agenda, came together to ...
Read Project

 12

 FINISHED 

Hybrid Commercial Vehicle (HCV)

Start date: Jan 1, 2010, End date: Jun 30, 2014,

The HCV project aims to develop urban buses and delivery vehicles with advanced second generation of energy efficient hybrid electric powertrains in line with objectives in topic SST 2008.3.1.5. The final result will be the demonstration of a passenger bus and a distribution truck with this advanced technology. In addition early second generation buses and distribution trucks will be demonstrated ...
Read Project

 22

 FINISHED 
Background Intensive livestock farming contributes to excessive levels of nutrients such as nitrogen (N) and phosphorous (P) in the environment. This can deteriorate groundwater quality, especially through increased nitrate concentrations. An increase in livestock numbers over the past 50 years has generated an increased amount of manure, which in turn ha ...
Read Project

 7

 FINISHED 
Background Reducing greenhouse gas (GHG) emissions is a major aim for mitigating the impacts of climate change. Italy has already seen innovative actions to define models and tools for GHG-emission accounting. In general, these initiatives have been aimed at raising stakeholders’ awareness of the need to reduce emissions at local level. Strategies have ...
Read Project

 5

 FINISHED 

GEn IV and Transmutation MATerials (GETMAT)

Start date: Feb 1, 2008, End date: Oct 31, 2013,

In FP5 and FP6, a number of significant projects have been launched, aimed at investigating innovative strategies for safe and optimised radioactive waste management. In particular P/T strategies based on the use of Accelerator Driven Systems are being addressed within the integrated project EUROTRANS. Moreover, during FP6, projects were also initiated to study advanced systems, as defined in the ...
Read Project

 24

 FINISHED 
"APOLLON proposal concerns the optimisation and development of Point focus and Mirror Based Spectra Splitting photovoltaic concentrating (CPV) systems (multi-approach). The different technology paths will be followed with due focalisation on the recognised critical issues related to each system component in order to increase CPV efficiency, assure reliability, reduce cost and environmental impact. ...
Read Project

 18

 FINISHED 

Severe Accident Research Network of Excellence 2 (SARNET2)

Start date: Apr 1, 2009, End date: Mar 31, 2013,

Most of the actors involved in severe accident research in Europe, plus Canada, Korea and the United States (41 partners), will network in SARNET2 (Severe Accident Research NETwork of Excellence - Phase 2) their capacities of research in order to resolve important pending issues on postulated severe accidents of existing and future Nuclear Power Plants (NPPs). The project has been defined in order ...
Read Project

 45

 FINISHED 
Natural fibres offer a route to the production of sustainable composites, replacing inorganic and petrochemical based fibres with high-embodied energy. One of the main obstacles to the exploitation of natural fibres is the limited consistency of supply, with batch-to-batch variations in quality. Retting – a process whereby plant stems are left to weather in the fields – has been identified as bein ...
Read Project

 14

 FINISHED 
"Besides the European Global Energy Policy, the European Council adopted an action plan that covers nuclear technologies and supports research in order to ""further improve nuclear safety and the management of radioactive waste"". To obtain a more efficient and sustainable management of radioactive waste and hence reduce the burden on geological storage, one can apply partitioning and transmutatio ...
Read Project

 20

 FINISHED 
"Sustainable water use in industry is the goal of AquaFit4Use, by a cross-sectorial, integrated approach. The overall objectives are: the development and implementation of new, reliable, cost-effective technologies, tools and methods for sustainable water supply, use and discharge in the main water consuming industries in order to significantly reduce water use, mitigate environmental impact and ...
Read Project

 36

 FINISHED 

The Virtual City (V-City)

Start date: Dec 1, 2008, End date: Dec 31, 2011,

Description The V-City system integrates computer vision, 3D-modelling and virtual reality research for rapid and cost-effective reconstruction, visualisation and exploitation of interactive urban environments.The three-year project researched, developed and validated an innovative system integrating the latest advances in Computer Vision ...
Read Project

 8

 FINISHED 
The proposed new EraSME ERA-NET, dubbed EraSME² will build on the successful work of the original EraSME project. The experimental phase of EraSME is now closed. The coming two years will be the consolidation phase, devoted to ensuring the long-term sustainability of EraSME by setting up an integrated transnational programme to support SMEs. During this phase the project will implement a formal ma ...
Read Project

 18

 FINISHED 
The project RegioMarket aims at developing and implementing a corporate sustainable branding and marketing strategy for the Alpine Space (AS) focussed on three core economic sectors, namely, food, services (tourism and gastronomy) and renewable energies. The strategy will consider existing experiences within AS in order to develop a best-practice approach. The latter will contribute to the promoti ...
Read Project

 18

 FINISHED 

Network for Regional SME Finance (FinNetSME)

Start date: Jun 30, 2004, End date: Jun 29, 2007,

The Network for Regional SME Finance, FinNetSME, is a network project designed to encourage an intensive exchange between regional public financiers on how to improve access to finance for Small and Medium Size Enterprises (SMEs). To this end, 20 partners from nine EU Member States will discuss current problems of SME finance, compare the situation in their respective regions and will suggest prac ...
Read Project

 22

 FINISHED 
VET has a unique position between more theoretical higher education and practice. It is typically an operator, who could have the skills both to understand the research information and implement it to the practice. Especially in rural areas the VET’s role has also changed from the traditional educator to important regional expert organization and developer. VET is an important link to the experti ...
Read Project

 13

 FINISHED 
DearsNet is a transnational network which will primarily seek to enhance the skills and competences of teachers and trainers in the sectors of agriculture and rural development within the context of lifelong learning. Through already existing networks and in this new extended partnership, the project will promote new and more innovative approaches and best practice in these sectors. Best practice ...
Read Project

 22