Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Despite process heat is recognized as the application with highest potential among solar heating and cooling applications, Solar Heat for Industrial Processes (SHIP) still presents a modest share of about 0.3% of total installed solar thermal capacity. As of today’s technology development stage – economic competitiveness restricted to low temperature applications; technology implementation requiri ...
Read Project

 32

 FINISHED 
...rts the technology development as well as the roll out of Smart Grid solutions and concepts in Europe. It tackles a holistic, cyber-physical systems based approach by integrating 18 European research centres and institutions with outstanding research infrastructures and jointly develops common methods, concepts, and procedures. ERIGrid also integrates and enhances the necessary research services f ...
Read Project

 19

 FINISHED 
The transition to a low carbon economy needs to achieve multiple aims: competitiveness, protection of the environment, creation of quality jobs, and social welfare. Thus policy-makers and other key stakeholders require tools that need to focus beyond the energy sector by including these other domains of economy, society and the environment. Currently, most available tools lack integration of these ...
Read Project

 12

 FINISHED 

Building up green Skills for Trainers from the construction industry

Start date: Dec 1, 2016, End date: Nov 30, 2019,

BuS.Trainers goal is to overcome skills mismatch and boost competitiveness in the construction sector. Vocational teachers hold a crucial role for the transfer of knowledge to current and future workforce at the sector. Based on existing evidences, building up VET trainers’ skills in Energy Efficiency and Renewable energies is the required breakthrough to address the weak link between education an ...
Read Project

 11

 FINISHED 
The Concerted Action will support the implementation of the renewable energy directive 2009/28/EC. As with the first and second phase, the objectives of CA-RES3 are directly linked to the transposition and implementation of the RES Directive. The third phase of the CA-RES will also provide further opportunities to explore possibilities for common approaches in specific areas of implementation of t ...
Read Project

 29

 FINISHED 
The GEMex project is a complementary effort of a European consortium with a corresponding consortium from Mexico, who submitted an equivalent proposal for cooperation. The joint effort is based on three pillars: 1 – Resource assessment at two unconventional geothermal sites, for EGS development at Acoculco and for a super-hot resource near Los Humeros. This part will focus on understanding the tec ...
Read Project

 26

 FINISHED 
There is a compelling need of encouraging energy efficiency in buildings, enhance green technologies and promote advance thermal energy storage solutions. TESSe2b will enable the optimal use of renewable energy and provide one of the most advantageous solutions for correcting the mismatch that often occurs between the supply and demand of energy in residential buildings. The target of TESSe2b is t ...
Read Project

 10

 FINISHED 
The COSMOS proposal aims to reduce Europe’s dependence on imported coconut and palm kernel oils and fatty acids and castor oil as sources for medium-chain fatty acids (MCFA, C10–C14) and medium-chain polymer building blocks. These are needed by the oleochemical industry for the production of plastics, surfactants, detergents, lubricants, plasticisers and other products. In COSMOS, camelina and cra ...
Read Project

 21

 FINISHED 
To reduce the total cost of low enthalpy geothermal systems by 20-30 % the project will improve actual drilling/installation technologies and designs of Ground Source Heat Exchangers (GSHE’s). This will be combined with an holistic approach for optimum selection, design and implementation of complete systems across different underground and climate conditions. The proposal will focus on one hand ...
Read Project

 17

 FINISHED 
5TOI_4EWAS project will focus on Targeted Open Innovation in energy, water and agriculture societal challenges through a balanced innovation-friendly ecosystem in the Southern Mediterranean Neighborhood (SMN) based on quintuple helix and NEXUS approach. The project will enhance and support regional smart specialization and development by increasing research capacity, effective mobility of young in ...
Read Project

 25

 FINISHED 
EMPOWERING proposal contributes to the shift of 6 EU regions toward low-carbon society by enhancing the capacities of municipalities and regional representatives to shape integrated energy strategies and plans. The project contributes to bridge the gap of skills needed to plan energy measures in the new 2030 framework for Climate and Energy Policy in terms of GHG emission reduction, renewable ener ...
Read Project

 8

 FINISHED 
PUBLENEF’s overarching goal is to assist Member States in implementing effective and efficient sustainable energy policies (with the focus on energy efficiency ) and empower them to make use of the best practices and policy processes implemented in other MS at the national, regional and/or local level. The specific objectives of the project are to a) Assess and learn from existing Energy Efficienc ...
Read Project

 13

 FINISHED 

An ENErgy Retrofit FUNDing rating tool (ENERFUND)

Start date: Feb 1, 2016, End date: Jan 31, 2019,

ENERFUND is a tool that will rate and score deep renovation opportunities – like a credit score used by banks to rate clients. The tool will be based on a methodology to be developed and on a set of parameters such as EPC data, number of certified installers, governmental schemes running, etc. By providing a rating for deep renovation opportunities – whether for private establishments or for publi ...
Read Project

 16

 FINISHED 
While the VET system has already been fully developed in some eco-efficient technologies, such as wind or photovoltaic power,Concentrated Solar Power (CSP) is an emerging technology where “Solar Field” operation present deep skill gaps ofVET tools.Spain is the first European country in installed CSP power, with a fully developed labour market, while Italy and Greece, starting plants construction i ...
Read Project

 16

 FINISHED 
The 2012 Energy Efficiency Directive (EED) establishes a set of binding measures to help the EU reach its 20% energy efficiency target by 2020. Countries have also set their own indicative national energy efficiency targets. To reach these targets, EU countries have to implement energy efficiency policies and monitor their impact. The Commission has also the task of monitoring the impacts of the m ...
Read Project

 33

 FINISHED 

Concerted Action EPBD IV (CAIV_EPBD)

Start date: Oct 1, 2015, End date: Mar 31, 2018,

The 'Concerted Action EPBD IV', supporting transposition and implementation of Directive 2010/31/EC of the European Parliament and of the Council of 19 May 2010 on the energy performance of buildings, is an activity which aims to foster exchange of information and experience among Member States and participating countries with regards to the implementation of the specific Community legislation and ...
Read Project

 29

 FINISHED 

STEam And Management Under Pressure (STEAM-UP)

Start date: Mar 1, 2015, End date: Feb 28, 2018,

The industrial sector could reduce its energy use by at least 13%. 75% of the potential savings can be found in steam and electric motor systems. Actions to tap the full potential in steam systems have been taken in the past but without success since findings from energy audits were not, or partly, implemented. The following barriers have been identified:- There is no business case for steam savin ...
Read Project

 10

 FINISHED 

Energy Performance Contracting Plus (EPC_PLUS)

Start date: Mar 1, 2015, End date: Feb 28, 2018,

Energy Performance Contracting (EPC) is generally looked upon favourably, but its implementation can be complicated and lengthy. The reason lies mainly in the procurement law provisions and the long-term and complex contracts, which impede a real breakthrough in the spread of the EPC methodology. The other main barriers for the implementation of EPC in SMEs are:• The transaction costs for procurin ...
Read Project

 13

 FINISHED 

Integrated Research Programme on Wind Energy (IRPWIND)

Start date: Mar 1, 2014, End date: Feb 28, 2018,

IRPWIND is an integrated research programme that combines strategic research projects and support activities within the field of Wind Energy, with the aim of leveraging the long term European research potential. The concept behind this programme is built on the success of existing initiatives supporting the SET Plan Agenda such as the European Energy Research Alliance Joint Programme on Wind Ener ...
Read Project

 26

 FINISHED 
The overarching objective of EU-MERCI is to support, in a coordinated way, the growth of energy efficiency in industry processes. It will develop methods and tools for assisting EU industry in the effective implementation of energy efficiency improvements and in the monitoring of the energy savings, in application of the 2012/27/EU Directive.The methodology will be based on the analysis of thousan ...
Read Project

 11

 FINISHED 
BigDataEurope will provide support mechanisms for all the major aspects of a data value chain, in terms of the employed data and technology assets, the participating roles and the established or evolving processes. The effectiveness of the provided support mechanisms will be assessed in different domains pertaining to Europe’s major societal challenges with respect to the needs and requirements of ...
Read Project

 15

 FINISHED 
Europe has invoked the SET-Plan to design and implement an energy technology policy for Europe to accelerate the development and deployment of cost-effective renewable energy systems, including photovoltaics. With lower cost of solar electricity, PV could significantly contribute to the achievements of the 20-20-20 objectives.The Joint Program on PV of the European Energy Research Alliance (EERA-P ...
Read Project

 37

 FINISHED 
The ELECTRA Integrated Research Programme on Smart Grids (ELECTRA) brings together the partners of the EERA Joint Programme on Smart Grids (JP SG) to reinforce and accelerate Europe’s medium to long term research cooperation in this area and to drive a closer integration of the research programmes of the participating organisations and of the related national programmes. ELECTRA’s joint research a ...
Read Project

 23

 FINISHED 
The overall objectives of the INNWIND.EU project are the high performance innovative design of a beyond-state-of-the-art 10-20MW offshore wind turbine and hardware demonstrators of some of the critical components. These ambitious primary objectives lead to a set of secondary objectives, which are the specific innovations, new concepts, new technologies and proof of concepts at the sub system and t ...
Read Project

 29

 FINISHED 

AdVanced Aerodynamic Tools for lArge Rotors (AVATAR)

Start date: Nov 1, 2013, End date: Oct 31, 2017,

The motivation for the AVATAR project lies in the fact that upscaling wind turbine designs towards 10-20 MW requires radical innovations to make this feasible. Many of these innovationshave a strong aerodynamic component and can be considered as unconventional from an aerodynamic point of view. As such the analysis of the resulting rotor designs falls outside the validated range of applicability o ...
Read Project

 14

 FINISHED 
The project Educational Laboratories Platform for Complex Engineering Processes with Remote Access (EduLabFrame) addresses the development of sense-making skills through e-learning concerning the design, configuration and administration of complex technological settings, with a focus on security issues. European Union crosses a period of changing policies to reduce dependence on imported primary e ...
Read Project

 4

 FINISHED 
"A consortium led by the Austrian Energy Agency (AEA) developed the project "Uptake of Solid Bioenergy in European Commercial Sectors (Industry, Trade, Agricultural and Service Sectors) – Bioenergy for Business" for the EU-Programme Horizon 2020’s Call 2014 (LCE14). The project partners include a combination of energy agencies, national biomass associations and research-oriented partners with spec ...
Read Project

 13

 FINISHED 
...ject proposed by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in cooperation with the Climate Protection and Energy Agency of Baden-Württemberg/Germany and European competence centres on Energy Performance Contracting (EnPC) in Croatia, Greece and Slovenia, a competence centre for e-learning in Slovakia, and key actors for the promotion of EnPC at the local level in Latvia, S ...
Read Project

 10

 FINISHED 

Integrative Smart City Planning (INSMART)

Start date: Dec 1, 2013, End date: Nov 30, 2016,

The InSMART concept brings together cities, scientific and industrial organizations in order to establish and implement a comprehensive methodology for enhancing sustainable planning addressing the current and future city energy needs through an integrative and multidisciplinary planning approach. This approach will identify the optimum mix of short, medium and long term measures for a sustainable ...
Read Project

 10

 FINISHED 
The goal of SOLAR-ERA.NET is to undertake joint strategic planning, programming and activities for RTD and innovation in the area of solar electricity generation, i.e. photovoltaics (PV) and concentrating solar power (CSP). Joint activities, namely joint calls, are defined for key topics and priorities in accordance with the Solar Europe Industrial Initiative (SEII) based on the Strategic Energy T ...
Read Project

 20

 FINISHED 
...ining all necessary arrangements for hosting the new legal entity; developing the collaborative model between public and private entities and fostering the collaboration between industry and research centres; establishing one access point and clear rules for users; preparing all the necessary mechanisms to secure sustainable financial resources; defining appropriate systems for knowledge and IPR m ...
Read Project

 15

 FINISHED 
...uch objectives, the project will join a 9 partnership European consortium, led by key industrial stakeholders of the wind turbine industry, GAMESA, LM and SEMIKRON, in cooperation with a group of R&D centres and SMEs with complementary skills and expertise to support design, testing and dissemination activities. The project partners are strongly committed to work together and to include all the ne ...
Read Project

 9

 FINISHED 
"ETRERA 2020 - Empowering Trans-mediterranean Renewable Energy Research Alliance for 2020 energy targets – is a project aimed at face front the future energy needs in the Euro –Mediterranean area by reinforcing creating a collaborative research/innovation network for supporting renewable energy sources (RES) technologies development and application, in accordance with EU policy addresses.The ETRER ...
Read Project

 12

 FINISHED 

Building-integrated fibre-reinforced solar technology (BFIRST)

Start date: May 1, 2012, End date: Apr 30, 2016,

...n some of the characteristics of these products is clearly detected.The consortium is composed by architects, construction companies, photovoltaic manufacturers, universities and private research centres.
Read Project

 9

 FINISHED 

Demonstration of high EFFiciency Stirling HEAT pump (EFFIHEAT-DEMO)

Start date: Apr 1, 2014, End date: Mar 31, 2016,

The need of innovative solutions for buildings heating and air-conditioning systems is driven by economical and environmental concerns, which are strongly supported by EU Directives. Buildings account for 40% of total energy consumption in the European Union . The sector is expanding, which is bound to increase its energy consumption. Therefore, reduction of energy consumption and the use of energ ...
Read Project

 7

 FINISHED 
Research & Innovation cooperation between the EU and MPC areas is a critical factor for the development of a ‘Common Knowledge and Innovation Space’, in order to jointly tackle important global challenges. The ‘Secure, Clean and Efficient Energy’ Societal Challenge is not only an EU’s critical priority towards H2020 for making the transition to a reliable, sustainable and competitive energy system ...
Read Project

 9

 FINISHED 
The FIBRA network has as main target to link the research and development activities for fibre crop innovations carried out by universities and institutions in both EU and China. This proposal is set up to promote the communication between experts about the key issues of fibre crop production, processing and application, while attention towards quality and efficiency improvement, and product diver ...
Read Project

 18

 FINISHED 

Energy Forecasting (NRG4CAST)

Start date: Dec 1, 2012, End date: Nov 30, 2015,

NRG4Cast is developing real-time management, analytics and forecasting services for energy distribution networks in urban/rural communities. We are analysing information regarding network topology and devices, energy demand and consumption, environmental data and energy prices data.The services that will be integrated in a software module pipeline providing prediction and the decision support syst ...
Read Project

 8

 FINISHED 

Optimization of Perennial Grasses for Biomass Production (OPTIMA)

Start date: Oct 1, 2011, End date: Sep 30, 2015,

OPTIMA will integrate an ambitious biology system approach for perennial grasses such as switchgrass, miscanthus and giant reed in the Mediterranean environment. Moreover the perennial species cardoon, which has been proven to be particularly adapted to the Mediterranean climate, will be used as a control species.The main objective of the OPTIMA project is to identify high-yielding perennial grass ...
Read Project

 21

 FINISHED 

WindScanner.eu - The European WindScanner Facility (WINDSCANNER)

Start date: Oct 1, 2012, End date: Sep 30, 2015,

The future high rate of deployment of renewable energy will require a substantial increase in the installed wind power capacity towards 2020 and beyond, in fact this demand corresponds approximately to the installation of one large turbine every hour for the next decade. This is a substantial “grand challenge” as outlined in the Strategic Energy Technology Plan (SET-Plan) from 2009, which is the t ...
Read Project

 10