Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Sharing Cities (SHAR-LLM)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Read Project

 36

 FINISHED 
Approximately one third of all food produced globally is wasted every year throughout the whole value chain-from farmers to consumers. To extract the significant amounts of valuable compounds contained in these wastes, AgriMax will combine affordable and flexible processing technologies (ultrasound assisted and solvent extraction, filtration, thermal and enzymatic treatments) for the valorization ...
Read Project

 30

 FINISHED 
About 2/3 of the rice consumed by European citizens is produced in EU, and its productivity is affected by abiotic and biotic stresses. Of particular concern, global temperature has increased over the last century, especially during the last 50 years (0.13° C / decade). One consequence has been a clear tendency toward salinization, which affects rice as one of the most salt sensitive crop in the r ...
Read Project

 14

 FINISHED 
Background In Europe, there is a general lack of knowledge about the diverse functions of soils, and in particular about the best available measures for their improvement and conservation. In the specific case of vineyards, which have both economic and landscape value in Europe, there are several soil management problems that are often not adequately addr ...
Read Project

 8

 FINISHED 

Muon campus in US and Europe contribution (MUSE)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

The Muon Campus at FNAL, USA, will host in the next few years two world class experiments dedicated to the search for signals of new physics. Muon g-2 will determine with unprecedented precision the anomalous magnetic moment of the muon while Mu2e will improve by four orders of magnitude the sensitivity on the search for the as-yet unobserved Charged Lepton Flavour Violating process of a neutrinol ...
Read Project

 7

 FINISHED 
Pervasive and on-line water quality monitoring data is critical for detecting environmental pollution. However, it’s not easy to gather such data, at least not for all contaminants. Currently, water utilities rely heavily on frequent sampling and laboratory analysis in order to acquire this information.For this situation to be improved, portable and high-performance devices for pervasive water qua ...
Read Project

 9

 FINISHED 
"In ZERO-PLUS, a comprehensive, cost-effective system for Net Zero Energy (NZE) settlements will be developed and implemented. The system will be composed of innovative solutions for the building envelope, for building energy generation and management, and for energy management at the settlement level. A reduction of operational energy usage to an average of 0-20 kWh/m2 per year (compared with the ...
Read Project

 18

 FINISHED 

NanoMaterials Enhanced Membranes for Carbon Capture (NanoMEMC2)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

Membrane separation processes can be applied to many capture processes from Pre-Combustion ( CO2-H2 / CO2-CH4 separation) to Post-Combustion (CO2-N2) and Oxyfuel (O2-N2) and are generally endowed with high flexibility and potentially low operative costs with respect to other capture methods. However the current materials are still lacking of separation performance and durability suitable for an ef ...
Read Project

 11

 FINISHED 
Specific raw materials become increasingly important to manufacture high level industrial products. Especially electronic equipment contains precious metals and a series of strategic raw materials. To date the material specific recycling is focused on mass stream concepts such as shredder processes and metallurgy to extract the high-value metallic constituents, i.e. copper, gold, silver. However, ...
Read Project

 10

 FINISHED 
SELIS is aimed at delivering a ‘platform for pan-European logistics applications’ by:- Embracing a wide spectrum of logistics perspectives and creating a unifying operational and strategic business innovation agenda for pan European Green Logistics.- Establishing an exceptionally strong consortium of logistics stakeholders and ICT providers, that can leverage EU IP from over 40 projects so as to c ...
Read Project

 38

 FINISHED 

Earth Observation for Maritime Navigation (EONav)

Start date: May 1, 2016, End date: Apr 30, 2019,

EONav presents an entirely new concept of combining space-based remote sensing observations which are offered by Copernicus with local maritime ship observations to aid maritime sail planning for fuel, emission and fatigue optimization. High fuel costs, consequences of delays in ship passages, reduction of SO2/CO2/NOx and similar emissions and other constraints are now putting more pressure on the ...
Read Project

 8

 FINISHED 
Over recent years, Industrial and Automation Control Systems (IACS) adopted in Critical Infrastructures (CIs) have become more complex due to the increasing number of interconnected devices, and to the large amount of information exchanged among system components. With the emergence of such an “Internet of Things” generation of IACS, the boundaries to be protected have grown well beyond that of th ...
Read Project

 13

 FINISHED 
European particle physics groups interested in searching signals of new physics both with neutrinos, at T2K experiment, and at the intensity frontier, with the Belle-II experiment at the SUPERKEKB machine, want to share between them and with KEK laboratory their knowledge in data analysis and detector technologies. Such knowledge sharing will enhance skills and competences of all participants, wil ...
Read Project

 14

 FINISHED 

TrustwOrthy model-awaRE Analytics Data platfORm (TOREADOR)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

The TOREADOR project is aimed at overcoming some major hurdles that until now have prevented many European companies from reaping the full benefits of Big Data analytics (BDA). Companies and organisations in Europe have become aware of the potential competitive advantage they could get by timely and accurate Big Data analytics, but lack the IT expertise and budget to fully exploit BDA. To overcom ...
Read Project

 10

 FINISHED 

Future Sky Safety

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Read Project

 32

 FINISHED 
Structural Health Monitoring (SHM) is expected to play a predominant role in the management of the transport infrastructure. Yet, SHM techniques continue to rely on point-based, as opposed to spatial, sensing requiring a dense network of these point-sensors increasing considerably the monitoring cost. Additionally, commercially available, strain sensors cannot measure strains beyond 1% to 2% and, ...
Read Project

 13

 FINISHED 

effective Container inspection at BORDer control points (C-BORD)

Start date: Jun 1, 2015, End date: Nov 30, 2018,

Efficient NII (non-intrusive inspection) of containerised freight is critical to trade and society. Freight containers are potential means for smuggling (e.g. tobacco), illegal immigration, trafficking of drugs, mis-declared goods and dangerous illicit substances, including explosives, nuclear material, chemical and biological warfare agents and radioactively contaminated goods. One inspection NII ...
Read Project

 19

 FINISHED 
The latest developments in low flying unmanned robots with arms and the associated fields of intelligent control, computer vision and sensors open the floor for robotic solutions, exploitable in the near term, in the field of inspection of difficult-toaccess areas of the civil infrastructure in general and bridges in particular. The latter infrastructure is ageing requiring inspection and assessme ...
Read Project

 11

 FINISHED 
Fortissimo 2 will drive the uptake of advanced modelling, simulation and data analytics by European engineering and manufacturing SMEs and mid-caps. Such an uptake will deliver improved design processes, better products and services, and improved competitiveness. For the European Union as a whole this means improved employment opportunities and economic growth.The importance of advanced ICT to the ...
Read Project

 38

 FINISHED 

CO2 capture from cement production (CEMCAP)

Start date: May 1, 2015, End date: Oct 31, 2018,

The European cement industry has committed itself to contributing to climate protection measures and therefore to curbing its CO2 emissions. CO2 capture technologies, although an essential part of all CO2 reduction scenarios, are not yet ready for large-scale deployment in the cement industry. Hence, the primary objective of CEMCAP isTo prepare the ground for large-scale implementation of CO2 capt ...
Read Project

 15

 FINISHED 
Productive land resources in Egypt are under multiple natural and human pressure that are leading to soil degradation and desertification. Agriculture land conservation is a high priority for Egypt. Several efforts have been undertaken by the government authorities of Egypt to reduce desertification processes and preserve land productivity but they have faced a wide range of obstacles, mostly rela ...
Read Project

 9

 FINISHED 
Description ECHORD++ will create new opportunities for European robotics researchers to work directly with SME/start-ups and new users/customers to create innovative products. ECHORD++ will continue ECHORD’s two pillars, “experiments” and “structured dialogue”, taking advantage of experience and investment in the infrastructure. In addition, ...
Read Project

 68

 FINISHED 
The EVER-EST project will enhance Research and Capacity Building in the Earth Science (ES) domain, by providing a generic Service Oriented-based Architecture Virtual Research Environment (VRE) tailored to the needs of the ES community. The full range of both generic and ES data management specific services provided by EVER-EST will facilitate the dynamic approach to collaborative working and rese ...
Read Project

 13

 FINISHED 

Food for Growth

Start date: Dec 1, 2015, End date: May 31, 2018,

Despite the heightened consumer consciousness, information surrounding food is engendered and shaped by consumers, food firms, health authorities, academia and the media. This produces communicative divergences and often leads to the criminalization of particular products. In this context the general public receives contradictory messages, while companies, consumers and public bodies risk confront ...
Read Project

 8

 FINISHED 
PASSME aims to deliver industry-driven, passenger-centric novel solutions (up to TRL6) for passengers, airports and airlines to address the anticipated increase in demand for commercial flights in Europe by 2050. The goal is to reduce travel time by at least 60 minutes by integrating information between all stakeholders and transforming airport and aircraft operations and interiors to make the pas ...
Read Project

 12

 FINISHED 

Biomethane Emilia-Romagna Regional system (BioMethER LIFE+)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

Background The transport sector accounts for 19.5% of total European Union greenhouse gas (GHG) emissions (22.9% in Italy). Counter to the general EU trend, GHG emissions from transport have increased by 24% compared to 1990 levels, with road transport responsible for most of the rise. The replacement of fossil fuels with biofuels could be one way of chan ...
Read Project

 5

 FINISHED 

Floor Washing Robot for Professional Users (FLOBOT)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

Industrial, commercial, civil and service premises, such as supermarkets and airports have huge floor surfaces to be cleaned daily and infra-daily.These activities are time demanding in terms of human repetitive activities and take place at sundry times, not necessarily covering a work-shift duration; this depends on the kind of premise and available time slots as well as on the type of organisati ...
Read Project

 9

 FINISHED 
systEmic Standardisation apPRoach to Empower Smart citieS and cOmmunities (ESPRESSO) focuses on the development of a conceptual Smart Cities Information Framework, which consists of a Smart City platform (the so-called Smart City enterprise application) and a number of data provision and processing services to integrate data, workflows, and processes in applications relevant for Smart Cities withi ...
Read Project

 16

 FINISHED 

EUROEMPLÉATE III

Start date: Dec 31, 2016, End date: Dec 30, 2017,

Oviedo City Council and the Consortium schools promote this project with the aim of providing young VET students with qualifications required by the productive system, increasing the chance of employment when their qualification is insufficient or inadequate. The unemployment rate in the city is around 20% this year, and it is essential to support young people of these profiles so that they can a ...
Read Project

 21

 FINISHED 

Coordinating Air transport Time Efficiency Research (CATER)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

Europe, through the High Level Group on Aviation Research, ACARE and the Commission, has a vision for air transport in meeting societal & market needs over the coming 30 years. Central to this is time efficiency, meaning reduced door-to-door journey times, seamless inter-modal connections and reliability. For this Europe will engage in large scale, intensive and coordinated research & innovati ...
Read Project

 10

 FINISHED 

Formación Profesional en el Espacio Laboral Europeo. Segunda Edición

Start date: Sep 1, 2016, End date: Aug 31, 2017,

This second edition of the Vocational Training in the European workplace project, continues with the consortium model. The consortium is still coordinated by the Regional Centre for Innovation and Training “Las Acacias”, hereinafter CRIF Las Acacias, and there are nine officially credited Vocational Training Schools of the Autonomous Community of Madrid taking part . The realization of the plann ...
Read Project

 17

 FINISHED 

Skúsenosť - najlepšia škola

Start date: Jul 1, 2016, End date: Jun 30, 2017,

According to the School Educational Programme of our school, our aims in the field of education and training is to prepare students, so they can swiftly react to the changes in the requirements of their field. The dual education is emphasized more and more, which requires the connection between the theoretical and practical training.By studying the work in international firms, the students of the ...
Read Project

 5

 FINISHED 
The management of crisis is one of the great challenges of the 21st century. The ever growing human, economic and environmental losses due to natural and man-made disasters evidence the need for a systematic approach to the management of crisis. A multi-disciplinary understanding and disaster risk management is required. In such situations, Collaborative Crisis Management (CCM) is usually coordina ...
Read Project

 18

 FINISHED 

LEACHE – Europa más cerca

Start date: Jun 1, 2015, End date: May 31, 2017,

The Department for Education of the Government of Navarra is responsible for establishing the general conditions and developing general aspects of education in this Spanish autonomous region. In this context, a new structure has been created in the Vocational Training Service in order to provide assistance for the internationalization of VET institutions. These measures try to reach the following ...
Read Project

 91

 FINISHED 

Improving Skills

Start date: Jun 1, 2015, End date: May 31, 2017,

The project will be promoted by pela EFTA - Escola de Formação Profissional em Turismo de Aveiro, Lda., founded in the year2006 and currently the only school in the region dedicated exclusively to the areas of Tourism and Leisure and Hospitality and Food&Beverage. With this new project EFTA wants to pursue its goals included in the educational project and strategic plan of internationalization and ...
Read Project

 25

 FINISHED 

Iniciativas de Mobilidade Transnacional para Impulsionar a Região

Start date: Jun 1, 2015, End date: May 31, 2017,

The general objective of this project , in line with the ET2020 strategy is pursued through a mobility experience that consists of a 4-week / 8-week internship abroad for students of and 3 months for graduates . The program provides for the young participants , placements in enterprises , deepening linguistic , cultural and territorial and sectoral comparison between the various professional tec ...
Read Project

 32

 FINISHED 
"This work will provide a monitoring system for constructed facilities that will provide a near real time, reliable, and continuously updated assessment of the structural condition of the monitored facilities after a disaster, with enough detail to be useful for early and full recovery planning. The above assessment will be seamlessly integrated with automated, near real-time and continuously upda ...
Read Project

 10

 FINISHED 

Multipurpose hemp for industrial bioproducts and biomass (MULTIHEMP)

Start date: Sep 1, 2012, End date: Feb 28, 2017,

Hemp is a sustainable high yielding crop well adapted to most European conditions, with advantageous environmental and agronomical characteristics. Traditionally cultivated for the fibres, seeds and psychoactive substances, it is now considered an ideal crop to produce innovative biomaterials. Once a key industrial crop for fibre, hemp production declined in the last century and was displaced by c ...
Read Project

 25

 FINISHED 

Fast Tracker for Hadron Collider Experiments (FTK)

Start date: Feb 1, 2013, End date: Jan 31, 2017,

"This project aims to develop an extremely fast but compact processor, with supercomputer performances, for pattern recognition, data reduction, and information extraction in high quality image processing.The proposed hardware prototype features flexibility for potential applications in a wide range of fields, from triggering in high energy physics to simulating human brain functions in experiment ...
Read Project

 6

 FINISHED 

High Altitude Ice Crystals (HAIC)

Start date: Aug 1, 2012, End date: Jan 31, 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Read Project

 40