Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The GREENDC proposal contribute to greener data centres by developing a decision support tool that help data centre managers predict energy demands better and evaluate strategies to minimize energy waste and minimize CO2 emissions. GREENDC adopt non-linear energy forecasting model and provide a simulation tool based on dynamic simulation model to allow data centre managers conduct what-if analysis ...
Read Project

 5

 FINISHED 
SMART-Plant will scale-up in real environment eco-innovative and energy-efficient solutions to renovate existing wastewater treatment plants and close the circular value chain by applying low-carbon techniques to recover materials that are otherwise lost. 7+2 pilot systems will be optimized fore > 2 years in real environment in 5 municipal water treatment plants, inclunding also 2 post-processing ...
Read Project

 27

 FINISHED 
Manufacturing represents approximately 21 % of the EU’s GDP and 20 % of its employment, providing more than 30 million jobs in 230 000 enterprises, mostly SMEs. Moreover, each job in industry is considered to be linked to two more in related services. European manufacturing is also a dominant element in international trade, leading the world in areas such as automotive, machinery and agricultural ...
Read Project

 13

 FINISHED 
The Green INSTRUCT project will develop a prefabricated modular structural building block that is superior to conventional precast reinforced concrete panels by virtue of its reduced weight, improved acoustic and thermal performance and multiple functionalities. The Green INSTRUCT block consists of over 70% of CDW in weight. The Green INSTRUCT project will: (i) achieve sustainability and cost sav ...
Read Project

 15

 FINISHED 
INTCATCH will instigate a paradigm shift in the monitoring and management of surface water quality that is fit for global waters in the period 2020-2050. INTCATCH will do this by developing efficient, user-friendly water monitoring strategies and systems based on innovative technologies that will provide real time data for important parameters, moving towards SMART Rivers. The business model will ...
Read Project

 23

 FINISHED 

Design for Resource and Energy efficiency in cerAMic kilns (DREAM)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

The DREAM project aims to design, develop and demonstrate a radically improved architecture for ceramic industrial furnaces, characterised by optimised energy consumption, reduced emissions, and lower operating costs compared to currently available technological solutions. This will be obtained by substantially enhancing specific furnace parts (control system, refractories, emissions abatement sys ...
Read Project

 11

 FINISHED 
The GELCLAD project aims at creating a novel cost-effective, durable, industrialised and easy to install composite insulation cladding system, based on a single multi-meso-structured panel with excellent insulation properties, made from functional bio-polymer composite (ecoWPC) as skin coupling with unique advanced foamable extrudable aerogel (FEA) as insulation core/layer. The GELCLAD is produced ...
Read Project

 12

 FINISHED 
The European industry is currently a world leader in aviation and to maintain its leading position and competitiveness in the dynamic global market, Europe’s industry must develop quickly and efficiently high quality products by meeting time-critical market demands and customers’ needs. Industrial competition is becoming fiercer not only from established regions, such as the USA, but from new eme ...
Read Project

 14

 FINISHED 

Smart Grids Energy management Staff (SMART GEMS)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

Smart grid is a dynamically interactive real-time infrastructure concept that encompasses the many visions of diverse energy system stakeholders. The Smart Grid is integrating the electrical and information technologies in between any point of generation and any point of consumption. The main objective of the project is to fully analyze all aspects of smart grids targeting in the improvement of re ...
Read Project

 12

 FINISHED 

Cloud Orchestration at the Level of Application (COLA)

Start date: Jan 1, 2017, End date: Jun 30, 2019,

SMEs and public sector organizations increasingly investigate the possibilities to use cloud computing services in their everyday business conduct. Accessing services and resources in the cloud on-demand and in a flexible and elastic way could result in significant cost savings due to more efficient and convenient resource utilization that also replaces large investment costs with long term operat ...
Read Project

 14

 FINISHED 
C-FOOT-CTRL aims to develop, test and validate a new software tool for the online monitoring, control and mitigation of the carbon footprint of wastewater treatment plants (WWTPs). Gaseous emissions are emitted from various stages of treatment in a WWTP. Currently, in developed countries the energy required for wastewater treatment accounts for approximately 3% of the total electrical load. Also, ...
Read Project

 5

 FINISHED 

Industrial Thermal Energy Recovery Conversion and Management (I-ThERM)

Start date: Oct 1, 2015, End date: Mar 31, 2019,

Waste heat recovery systems can offer significant energy savings and substantial greenhouse gas emission reductions. The waste heat recovery market is projected to exceed €45,0 billion by 2018, but for this projection to materialise and for the European manufacturing and user industry to benefit from these developments, technological improvements and innovations should take place aimed at improvin ...
Read Project

 13

 FINISHED 
The EU Agency for Safety & Health is currently amending wind turbine standards (such as EN 50308) to ensure safer O&M tasks and increase the Probability Of Detection (POD) for wind turbine defects. ISO have also identified such issues, and in fact initiated the development of QA standards specifically tailored for the Condition Monitoring (CM) of wind turbines. Current CM systems are intrusive, an ...
Read Project

 5

 FINISHED 
NEWTON is a large scale initiative to develop, integrate and disseminate innovative technology-enhanced learning (TEL) methods and tools, to create new or inter-connect existing state-of-the art teaching labs and to build a pan-European learning network platform that supports fast dissemination of learning content to a wide audience in a ubiquitous manner. NEWTON focuses on employing novel technol ...
Read Project

 14

 FINISHED 

Drivers of Pontocaspian biodiversity RIse and DEmise (PRIDE)

Start date: Mar 1, 2015, End date: Feb 28, 2019,

Since the 1930s, the unique endemic aquatic biota of the Caspian-Black Sea region is facing a biodiversity crisis as it is severely affected by anthropogenic activities such as habitat destruction, invasive species and pollution. Understanding long-term natural biotic and abiotic drivers of lake system change and biotic response to perturbations in the past 2 Ma – i.e. gradual, rapid and/or thresh ...
Read Project

 10

 FINISHED 
"The Politics of Cultural Exchange: Anna of Denmark and the Uses of European Identity" investigates how cultural exchange operates across the confessional and geographic divides of pre-modern Europe through a transnational case study of Anna of Denmark (1574-1619), Queen of Scotland and England. This synoptic study combines her vernacular patronage with new evidence of her European connections man ...
Read Project

 1

 FINISHED 
The construction sector, currently in crises in some countries due to the economic development model adopted during last decades, can again play an important role for the European economy to be more innovative by using fewer resources (raw materials and energy) and reducing environmental impact (emission of greenhouse gases and dust pollution). Access to raw materials and resource efficiency are a ...
Read Project

 10

 FINISHED 

the international Learning Network of networks on Sustainability

Start date: Oct 15, 2015, End date: Oct 14, 2018,

The LeNSin project aims at the internationalization, intercultural cross-fertilization and accessibility of higher education by consolidating and empowering a global network called the Learning Network on Sustainability. This network is composed of 6 existing, functioning regional networks (14 HEIs in 5 partner countries and 4 European HEIs): LeNS_Brasil, LeNS_Mexico; LeNS_South Africa, LeNS_China ...
Read Project

 14

 FINISHED 
"SOLUTIONS will deliver a conceptual framework for the evidence-based development of environmental and water policies. This will integrate innovative chemical and effect-based monitoring tools with a full set of exposure, effect and risk models and assessment options. Uniquely, SOLUTIONS taps (i) expertise of leading European scientists of major FP6/FP7 projects on chemicals in the water cycle, (i ...
Read Project

 41

 FINISHED 

Computing Patterns for High Performance Multiscale Computing (ComPat)

Start date: Oct 1, 2015, End date: Sep 30, 2018,

Multiscale phenomena are ubiquitous and they are the key to understanding the complexity of our world. Despite the significant progress achieved through computer simulations over the last decades, we are still limited in our capability to accurately and reliably simulate hierarchies of interacting multiscale physical processes that span a wide range of time and length scales, thus quickly reaching ...
Read Project

 11

 FINISHED 
Our prime objective is to generate in excess of €22million profits for the participating companies by addressing a European need for the safe maintenance and inspection of power lines. Intel-Line is an intelligent automatic, inspection system using advanced ultrasonics and incorporating wireless transmission and energy harvesting to provide a ‘fit and forget’ condition monitoring and failure alarm ...
Read Project

 4

 FINISHED 

iPerm: Guided wave monitoring tool (iPerm)

Start date: Oct 1, 2016, End date: Sep 30, 2018,

Today, there are more than 40 major transnational oil and gas pipelines traversing Europe, accounting for over 34,565 km of strategically critical pipeline infrastructure, 40% of which are over 40 years old and subject to corrosion induced catastrophic failures impacting negatively upon European society and its economy. With such an extensive and growing network of pipelines, and a corollary incre ...
Read Project

 5

 FINISHED 
I - Over forty million workers in the EU are affected by work-place related musculoskeletal disorders, as a result of working in painful or tiring positions and handling heavy loads with repetitive hand or arm movements.II - The aging population is growing fast and approaching the mean age where loss of function and hence loss of mobility is to begin. In addition to diabetic and obesity, in 5 year ...
Read Project

 13

 FINISHED 
...ds on complementary and internationally highly recognised expertise of the researcher and his PhD supervisor at the University of Rijeka (on geometrically nonlinear beam models) and the supervisor at Brunel University (on CZMs and nonlinear finite-element analysis). The researcher will have the opportunity to (a) develop world-leading knowledge and expertise in a research topic of significant impo ...
Read Project

 1

 FINISHED 

Enabling Multichannel PArticipation Through ICT Adaptations (EMPATIA)

Start date: Jan 1, 2016, End date: Dec 31, 2017,

Participatory budgeting (PB) represents one of the most successful civic innovations of the last quarter-century. At a time when voter turnout in Europe is lagging and public institutions struggle to maintain trust and legitimacy within a framework of growing budgetary cuts, PB has proved itself to be a powerful tool for citizens to join in the essential tasks of governing, not only as voters but ...
Read Project

 7

 FINISHED 

Social Innovation: Driving Force of Social Change (SI-DRIVE)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

SI-DRIVE extends knowledge about social innovation (SI) in three major directions:- Integrating theories and research methodologies to advance understanding of SI leading to a comprehensive new paradigm of innovation.- Undertaking European and global mapping of SI, thereby addressing different social, economic, cultural, historical and religious contexts in eight major world regions.- Ensuring rel ...
Read Project

 28

 FINISHED 
“Adapting Dickens” approaches the work of Charles Dickens from a fresh, dynamic, globally engaged perspective. The project considers adaptations—particularly dramatizations—of Dickens's novels as key sites for international cultural interaction in the nineteenth and early twentieth centuries. Adaptation to the stage transformed Dickens--Britain's emblematic national writer--into an international c ...
Read Project

 1

 FINISHED 

Evaluating the impact and outcomes of European SSH research (IMPACT-EV)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"The main objective of IMPACT-EV is to develop a permanent system of selection, monitoring, evaluation and comparison of the impact and outcomes from European SSH research, taking into account the latest quantitative and qualitative evaluation tools, identifying new ways of implementing them and exploring new standards and indicators that complement existing impact assessment processes. IMPACT-EV ...
Read Project

 9

 FINISHED 

FLEXOLIGHTING

Start date: Jan 1, 2015, End date: Dec 31, 2017,

The flexolighting programme is focussed on research and innovations on materials, processes and device technology for OLED lighting with the intention of building a supply chain within Europe. The aim is to realise OLED devices over a large area/surface with high brightness, high uniformity and long life time. A demonstrator will be built and delivered at the end of the project. The main targets a ...
Read Project

 9

 FINISHED 
BIO-GO-For-Production is a Large Scale Collaborative Research Project that aims to achieve a step change in the application of nanocatalysis to sustainable energy production through an integrated, coherent and holistic approach utilizing novel heterogeneous nanoparticulate catalysts in fuel syntheses. BIO-GO researches and develops advanced nanocatalysts, which are allied with advanced reactor con ...
Read Project

 16

 FINISHED 
The purpose of this action is to assist the €2.8bn European and global liquid storage and distribution industry in reducing the costs involved in ensuring that leaks do not occur from 500,000 above ground storage tanks (ASTs), thus avoiding avoid damage to the environment and the loss of revenue from the unscheduled outages of leaking tanks, currently estimated at €132m. At its core is the explo ...
Read Project

 5

 FINISHED 
The Valor-Plus supports the realisation of sustainable, economically viable closed loop integrated biorefineries through the development of new knowledge, (bio-)technologies and products that enable valorisation of key biorefinery by-products. The project comprises five key areas:• Pre-treatment and fractionation: development of a novel methodology for the controlled and selective breakdown, relea ...
Read Project

 14

 FINISHED 

Serious game: SKILLS IN THE WIND ENERGY SECTOR

Start date: Nov 2, 2015, End date: Nov 1, 2017,

BACKGROUND: The NEEDS identified in the wind energy sector in the staff´s professionalization matter are: - Current skills established for wind energy sector´s staff in Spain established by INCUAL (National Institute of Qualifications) refer only to operational training in the installation and operation of the wind farms (ENAE 193_3 "Management Installation and Maintenance of Wind Parks" ) Howeve ...
Read Project

 4

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 
This project suggests the development of an open access remote PV laboratory for educational purposes. The remote PV laboratory will be installed outdoors at the facilities of the TEI of Athens - Greece, which is in a geographical region characterized by a large number of annual sunshine hours, allowing the users to perform real-world tests and experiments with photovoltaic panels over the interne ...
Read Project

 6

 FINISHED 

Social & Sustainable Fashion Entrepreneurs

Start date: Sep 1, 2015, End date: Aug 31, 2017,

‘SoFE’ stands for ‘Social and Sustainable Fashion Entrepreneurs’ it is a pedagogical training programme in the fashion industry addressing the biggest challenges of the sector and some of the most burning issues of societies today. These being the protection of the environment, the work integration of young unemployed people and the return of the production of the fashion industry back to Europe. ...
Read Project

 7

 FINISHED 

Meeting of Energy Professional Skills (MEnS)

Start date: Mar 1, 2015, End date: Aug 31, 2017,

MENS is a project conceived in order to provide an enhance the NZEB skills of building managers such as engineers and architect through a series of accredited training activities developed by 9 universities and 3 market players. MENS aims: - To increase the knowledre and skills of at least 1800 building managers (engineers, architects) in NZEB design and construction, out of which 50% would be wom ...
Read Project

 13

 FINISHED 

MINImising Carbon footprint in maritime sHIPping (MINI-CHIP)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

"Sea transport is a vital component of the world’s economy as the largest carrier of freight around the globe. Marine shipping is responsible for about 3.3% of the global greenhouse gas (GHG) emissions. International Maritime Organization in 2009 has set the target for 15% reduction in the maritime emissions by 2018. This requirement calls for further research into minimising carbon footprint of m ...
Read Project

 3

 FINISHED 
Aluminium (Al) alloys are extensively used in transport (28%), construction (35%) and engineering (27%) sectors. The total Al in use is expected to increase from 600 million tonnes in 2013 to one billion tonnes by 2020, thus creating a large metal bank for future recycling use. Currently primary Al production from bauxite ore is the primary source of Al metal supply to industry. Since primary alu ...
Read Project

 1

 FINISHED 
In African Communities of Practice (CoPs), international collaboration and the pursuit of scientific endeavour has faced a major barrier with the lack of access to e-Infrastructures and high performance network infrastructure enjoyed by European counterparts. With AfricaConnect, the proposed AfricaConnect2 and regional developments, this situation is changing rapidly. In the project Teaming-up fo ...
Read Project

 10