Search for European Projects

21 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Integrated Research Programme on Wind Energy (IRPWIND)

Start date: Mar 1, 2014, End date: Feb 28, 2018,

IRPWIND is an integrated research programme that combines strategic research projects and support activities within the field of Wind Energy, with the aim of leveraging the long term European research potential. The concept behind this programme is built on the success of existing initiatives supporting the SET Plan Agenda such as the European Energy Research Alliance Joint Programme on Wind Ener ...
Read Project

 26

 FINISHED 
Concentrating Solar Thermal Energy encompasses Solar Thermal Electricity (STE), Solar Fuels, Solar Process Heat and Solar Desalination that are called to play a major role in attaining energy sustainability in our modern societies due to their unique features: 1) Solar energy offers the highest renewable energy potential to our planet; 2) STE can provide dispatchable power in a technically and eco ...
Read Project

 42

 FINISHED 
The overall objective of the ETFE-MFM Proposal is the development, evaluation and demonstration of a flexible multifunctional ETFE module for architectural façade lighting. The aim of this proposal is to provide a PV module with embedded additional functionalities designed to be used in ETFE textile architecture for BIPV applications.ETFE-MFM concept is based on the integration of different techno ...
Read Project

 6

 FINISHED 

AdVanced Aerodynamic Tools for lArge Rotors (AVATAR)

Start date: Nov 1, 2013, End date: Oct 31, 2017,

The motivation for the AVATAR project lies in the fact that upscaling wind turbine designs towards 10-20 MW requires radical innovations to make this feasible. Many of these innovationshave a strong aerodynamic component and can be considered as unconventional from an aerodynamic point of view. As such the analysis of the resulting rotor designs falls outside the validated range of applicability o ...
Read Project

 14

 FINISHED 
The overall objectives of the INNWIND.EU project are the high performance innovative design of a beyond-state-of-the-art 10-20MW offshore wind turbine and hardware demonstrators of some of the critical components. These ambitious primary objectives lead to a set of secondary objectives, which are the specific innovations, new concepts, new technologies and proof of concepts at the sub system and t ...
Read Project

 29

 FINISHED 
Concentrating solar technologies (CST) have proven to be very efficient sources of “clean” power for the electrical grid. The efficient operation of concentrating solar technologies requires reliable forecasts of the incident irradiance for two main reasons. First, such forecasts yield a better management of the thermodynamic cycle because it becomes possible to dynamically fine tune some of its p ...
Read Project

 13

 FINISHED 
The scientific targets of the EUROSUNMED project are the development of new technologies in three energy field areas, namely photovoltaics (PV), concentrated solar power (CSP) and grid integration (GI), in strong collaboration with research institutes, universities and SMEs from Europe in the north side of the Mediterranean sea and from Morocco and Egypt from the south of the sea. The focus in PV ...
Read Project

 18

 FINISHED 
The objective of MESOWAKE is is to contribute to the development of an open-source model chain that can bridge the gap between mesoscale meteorological processes and microscale wind farm models. Special focus will be given to the interfacing between mesoscale and microscale CFD models both based on large-eddy simulation treatment of the atmospheric boundary layer. Case studies will be based on the ...
Read Project

 1

 FINISHED 
The objective of the WINDTRUST project is to demonstrate the technical and economic feasibility of innovative and more reliable solutions for multi MW wind turbines in order to improve the competitiveness of wind energy technologies. The selected components of the wind turbine are the rotor (specifically the blade), power electronics (specifically the converter) and Control and communication syste ...
Read Project

 9

 FINISHED 
The overall aim of this program is to improve technologies and biological tools for conversion of wastes that are abundantly discharged in EU, by eco-friendly and eco-efficient production of high added values bioproducts such as ligno-cellulolytic enzymes, fuel ethanol (EtOH), polylactic acid (PLA) and polyhydroxyalkanoates (PHAs). One of the main objectives is enlarging the patrimony of microbes ...
Read Project

 4

 FINISHED 

Small Wind Turbine for Urban Environments (WINDUR)

Start date: Nov 1, 2013, End date: May 31, 2016,

As SMEs in the supply chain of small Wind Turbines (WTs), we have identified an excellent opportunity in the urban submarket. The Small Wind market mainly corresponds to turbines installed in rural and isolated areas. Nevertheless, Urban is by far the largest potential market, as 80% of European population lives in cities and the EU Directive 2010/31/EU on Energy Performance of Buildings requires ...
Read Project

 12

 FINISHED 

Logistics for Energy Crops' Biomass (LOGISTEC)

Start date: Sep 1, 2012, End date: Feb 29, 2016,

Cost-efficient, environmental-friendly and socially sustainable biomass supply chains are urgently needed to achieve the 2020 targets of the Strategic Energy Technologies-Plan of the European Union, which are likely to be impeded by the potential scarcity of lignocellulosic biomass from agriculture. Innovative techniques for crop management, biomass harvesting and pre-treatment, storage and transp ...
Read Project

 24

 FINISHED 
The overall objective of SOLARROK is to deepen the transnational cooperation between leading European research-driven clusters in the Photovoltaic (PV) sector. To gain a competitive position and to foster industrial innovation, EU research infrastructures require more and more resources: multidisciplinary competencies, investments for technical equipments, skilled human resources, and strong links ...
Read Project

 16

 FINISHED 

WindScanner.eu - The European WindScanner Facility (WINDSCANNER)

Start date: Oct 1, 2012, End date: Sep 30, 2015,

The future high rate of deployment of renewable energy will require a substantial increase in the installed wind power capacity towards 2020 and beyond, in fact this demand corresponds approximately to the installation of one large turbine every hour for the next decade. This is a substantial “grand challenge” as outlined in the Strategic Energy Technology Plan (SET-Plan) from 2009, which is the t ...
Read Project

 10

 FINISHED 
Torrefaction is considered worldwide as a promising key technology for boosting large-scale implementation of bioenergy. It involves heating biomass in the absence of oxygen to a temperature of 200 to 320 °C. As a result, the biomass looses all its moisture and becomes easy to grind and water resistant, which reduces the risk of spontaneous ignition and biological degradation and permits outdoor s ...
Read Project

 23

 FINISHED 

EERA Design Tools for Offshore Wind Farm Cluster (EERA-DTOC)

Start date: Jan 1, 2012, End date: Jun 30, 2015,

The European Energy Research Alliance (EERA) together with some high-impact industry partners addresses the call proposing an integrated and validated design tool combining the state-of-the-art wake, yield and electrical models available in the consortium, as a plug-in architecture with possibility for third party models. To decrease uncertainties around wind farm wake predictions, a small measur ...
Read Project

 23

 FINISHED 
El objetivo del proyecto es identificar, experimentar, validar y difundir tecnologías de tratamiento y valorización de residuos en PYMES de actividades productivas de transformación de vegetales del SUDOE. El proyecto pretende, mediante la transferencia de tecnologías y metodologías de valorización de residuos, la obtención y aplicación de compuestos de interés para la mejora tecnológica de alimen ...
Read Project

 7

 FINISHED 
To develop a production method for manufacturing of optical lenses with micro structured surface and extreme high precision of details in large format. The Developed Product shall be utilized to improve the efficiency of Solar collectors. The primary target is the Concentrated Photovoltaic (CPV) market. Today the CPV manufacturer use concentrating optics made from PMMA (Acrylic) or silicon on glas ...
Read Project

 7

 FINISHED 
The integration of wind generation into power systems is affected by uncertainties in the forecasting of expected power output. Misestimating of meteorological conditions or large forecasting errors (phase errors, near cut-off speeds etc), are very costly for infrastructures (i.e. unexpected loads on turbines) and reduce the value of wind energy for end-users. The state of the art in wind power fo ...
Read Project

 21

 FINISHED 
The project will demonstrate a 200.000 t/year capacity flexible FAME production plant, starting from different kinds of raw material oils, with the aim of reducing 40% of the CO2 balance compared to the well to wheel emissions of a conventional fossil diesel plant, through the following measures: to develop an integrated transesterification process, linked to the neighbouring crushing process thro ...
Read Project

 6

 FINISHED 

Development of Photovoltaic Textiles based on novel fibres (DEPHOTEX)

Start date: Nov 1, 2008, End date: Oct 31, 2011,

The goal of the project is to research and develop textile solar cells in order to get flexible photovoltaic textiles based on novel fibres allowing taking benefit from the solar radiation so as to turn it into energy. Photovoltaic solar energy is being widely studied as one of the sources of renewable energy with major application potential, being considered a real alternative to fossil fuels. Si ...
Read Project

 14