Search for European Projects

33 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Read Project

 39

 FINISHED 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Read Project

 41

 FINISHED 
"Background: A significant proportion of pre-diabetics, show macro and micro vascular complications associated with hyperglycaemia. Although many trials have demonstrated the efficacy of lifestyle and pharmaceutical interventions in diabetes prevention, no trial has evaluated the extent to which mid- and long-term complications can be prevented by early interventions on hyperglycaemia.Aims: To ass ...
Read Project

 37

 FINISHED 

solving CHAllenges in Nuclear DAta (CHANDA)

Start date: Dec 1, 2013, End date: Nov 30, 2017,

"The CHANDA project main objective is to address the challenges in the field of nuclear data for nuclear applications and its acronym stands for solving CHAllenges in Nuclear DAtaThe project will prepare a proposal for an organization that will coordinate the nuclear data research program, and the infrastructures and capabilities of the EU Member States in a stable structure, well integrated with ...
Read Project

 35

 FINISHED 

Farm-Oriented Open Data in Europe (FOODIE)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

The agriculture sector is a unique sector due to its strategic importance for both European citizens (consumers) and European economy (regional and global) which, ideally, should make the whole sector a network of interacting organizations. Rural areas are of particular importance with respect to the agri-food sector and should be specifically addressed within this scope. The different groups of s ...
Read Project

 13

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Nature Power

Start date: May 18, 2016, End date: Nov 17, 2016,

Nature Power is a KA1 youth exchange, twith the partecipantion of 40 youngsteir from 8 different countries (Turkey, Spain, Czech Republic, Lithuania, Greece, Italy, Estonia, Portugal. The project will realized at Sorbo San Basile, Calabria, Italy from 22.06.2016 to 27.06.2016The development of some skills such as the ability in social relations, leadership, problem solving, the ability to work in ...
Read Project

 8

 FINISHED 
In the European Union, Small and Medium Enterprises (SMEs) of the food sector are increasingly under pressure due to developing open markets, increasing demand of standardized and price competitive food products by the consumers, rising importance of large retailers and challenges in obeying governmental regulations. This raises the risk of losing many traditional foods as well as traditional proc ...
Read Project

 31

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 

Healthy mind in a healthy body

Start date: Aug 1, 2015, End date: Jul 31, 2016,

The project "Healthy mind in a healthy body" will gather 25 people from Spain, France, Ukraine, Estonia and Italy, ten of them will come from regions with social difficulties. Latest trends show that European youth is becoming more and more physically inactive and is prone to wide range of health problems. In addition to this, stress, poor sleep and eating habits are also to blame for these health ...
Read Project

 5

 FINISHED 
The importance of advanced simulation to the competitiveness of both large and small companies is well established. The principal objective of Fortissimo is to enable European manufacturing, particularly small to medium enterprises (SMEs), to benefit from the efficiency and competitive advantage inherent in the use of simulation. However, the simulation of, for example, high-pressure gas cylinders ...
Read Project

 96

 FINISHED 

GReener Aeronautics International Networking-2 (GRAIN 2)

Start date: Oct 1, 2013, End date: May 31, 2016,

As mentioned in the Executive Summary of the Strategic Research & Innovation Agenda, Aviation has an important role to play in reducing greenhouse gas emissions as well as noise and local air quality issues. The continuous increase of air passenger transport generates an increasing use of hydrocarbon fuel with excessive emission of CO2 and NOX (greenhouse gases, pollutants and noise). It is well k ...
Read Project

 25

 FINISHED 
E-commerce has become a focal point of expansion and growth for the consumer goods industry. This rapidly expanding trend provides an opportunity for childrenswear manufacturers to introduce new commercialization channels, enabling to reach a global audience by selling their products directly to customers and being able to open 24 hours a day, seven days a week. However, the childrenswear sector i ...
Read Project

 10

 FINISHED 

Technology and Innovation for Smart Publishing (TISP)

Start date: Jan 1, 2013, End date: Dec 31, 2015,

The TISP network aims at creating a platform for publishers and technology providers to promote wider collaboration so to make available expertise and tools on innovation and technology to publishing industry in a mutual exchange of ideas and experience between the two sectors.TISP results from the merging of two pre-existing networks, lead by the two European federations of publishing and ICT ind ...
Read Project

 25

 FINISHED 

BIO knowLEDGe Extractor and Modeller for Protein Production (BIOLEDGE)

Start date: Oct 1, 2011, End date: Sep 30, 2015,

Better bioinformatics tools are needed to capitalize on vast amounts of data becoming accessible in biotechnology applications. The theme of this collaborative project is protein production for biotechnology applications. The concept is that (1) protein production is an important topic in biotechnology, with application ranging from production of therapeutic proteins for the pharmaceutical industr ...
Read Project

 10

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 
The refurbishing to an energy efficient standard leads to tight buildings (whole envelope: windows, walls, etc.) and affects the indoor climate. In case of refurbishing the inhabitants or users are not adapted to this new situation. Therefore the air exchange rates could be lower than required if no mechanical ventilation is installed or the system performance is not optimised. Then, in trying to ...
Read Project

 15

 FINISHED 
Turbot (Scophthalmus maximus) is identified as one of the most promising candidates for marine aquaculture in Europe, with several characteristics that make it an interesting species for commercial growers and European consumers. The species has tremendous potential as an aquaculture species but many of its attributes are currently unexploited utilize. European production of turbot has been increa ...
Read Project

 15

 FINISHED 
ENLACE aims at supporting the bi-regional dialogue between the EU and the Central America Countries (CAC) on S&T issues, identifying common interests in research areas, setting up S&T priorities, supporting capacity building activities, and enhancing the dialogue within the region.The planned activities are: policy dialogue meetings between EU and CA stakeholders to identify research priorities of ...
Read Project

 16

 FINISHED 

Accurate Nuclear Data for nuclear Energy Sustainability (ANDES)

Start date: May 1, 2010, End date: Oct 31, 2013,

"According to the recent publications of the European Technological Platform for a Sustainable Nuclear Energy (SNETP) (Vision report and Strategic Research Agenda) the sustainability require the combination of the present LWR, future Advanced Fast reactors and the waste minimization in closed cycles with Partitioning and Transmutation. To implement these new nuclear systems and their fuel cycles i ...
Read Project

 21

 FINISHED 
"There is a need for fast ship transportation that is both efficient and non-polluting. Conventional propellers are known to have low efficiency. As an indicative example, most of ship propellers installed on cargo vessels waste about 40 percent of the energy in the form of rotational losses in the wake, vortex generation, noise production, cavitation, etc. The recovery of such losses is one of th ...
Read Project

 7

 FINISHED 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Read Project

 27

 FINISHED 

TERASCALE RELIABLE ADAPTIVE MEMORY SYSTEMS (TRAMS)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

Technology projections indicate that future electronic devices will keep shrinking, being faster and consuming less energy per operation. In the next decade, a single chip will be able to perform trillions of operations per second and provide trillions of bytes per second in off-chip bandwidth. This is the so called Terascale Computing era, where terascale performance will be mainstream, available ...
Read Project

 4

 FINISHED 

Researchers With Energy (ResEnergy)

Start date: May 1, 2012, End date: Nov 30, 2012,

The ResEnergy: Researchers With Energy proposal consists in different activities.The first activity consists of ten main Events on the 28th September 2012, which will gather more than 20000 people, organised by eight public entities and two associations around Spain. A second activity consists on a Drawing Competition, which will be performed before and after the 28th event. During to the event ce ...
Read Project

 12

 FINISHED 

Efficient 3D Completeness Inspection (3DComplete)

Start date: Sep 1, 2010, End date: Nov 30, 2012,

In Europe there are about 3000 SMEs working in the field of machine vision. These SMEs provide services and products to another 300.000 SMEs in the machine building and automation sector. One important application of machine vision is quality control and in particular checking the completeness (presence/absence of parts, correct type, position, orientation, …) of assemblies. Existing systems usual ...
Read Project

 7

 FINISHED 

Pan European Grid Advanced Simulation and state Estimation (PEGASE)

Start date: Jul 1, 2008, End date: Jun 30, 2012,

"PEGASE is a four year project dealing with the High and Extra High Voltage transmission and sub-transmission networks in Europe (designated as ETN) and implemented by a Consortium composed of 20 Partners including TSOs, expert companies and leading research centre’s in power system analysis and applied mathematics. Its overall objectives are to define the most appropriate state estimation, optimi ...
Read Project

 25

 FINISHED 

Aerodynamic loads estimation at extremes of the flight envelope (ALEF)

Start date: May 1, 2009, End date: Apr 30, 2012,

"ALEF's objective is to enable the European aeronautical industry to create complete aerodynamic models of their aircraft based on numerical simulation approaches within the respective development processes. I.e. ALEF will kick-off a paradigm shift from greater confidence in experimentally measured loads data to greater confidence in computational results. Beyond the scope of ALEF this paradigm sh ...
Read Project

 20

 FINISHED 

Chemists Everywhere (ChemEve)

Start date: May 1, 2011, End date: Nov 30, 2011,

The ChemEve: Chemistry EveryWhere proposal consists in two different activities. The first activity consists of seven main Events on the 23rd September 2011, which will gather around 15000 people, organised by seven public entities around Spain: Girona, Murcia, Burgos, Las Palmas, Oviedo, Valladolid, and Mallorca. The second activity consists on a Drawing Competition, which will be performed befo ...
Read Project

 9

 FINISHED 

Micro Dynamic Demand and Storage (MiDDaS)

Start date: Jun 1, 2009, End date: May 31, 2011,

Power outages can be caused by a defect in a power station; damage to a power line or other parts of the distribution system, a short circuit, or the overloading of electricity mains. Out of all the causes, most of them are minimised or preventable by better maintenance except the overloading of the electricity main (Power Grids), which can’t be completely predicted. Across Europe, overloading of ...
Read Project

 7

 FINISHED 

Researchers 2.0

Start date: May 1, 2009, End date: Nov 30, 2009,

The Researchers 2.0 proposal consists in two different activities which are very relate to each other. First, two main Events on the 25th September 2009, which will gather around 5000 people, organised by two public Universities in Spain: Girona (UdG - Catalonia) and Murcia (UMU - Murcia Region. Satellite activities will also be organized at Figueres (Catalonia) and Cartagena (Murcia Region). Seco ...
Read Project

 5

 FINISHED 

Recreational Reserchers (RECRESEARCHERS)

Start date: Jun 1, 2008, End date: Dec 31, 2008,

The RecreSearchers proposal consist of three events on the 26th September 2008, which will gather more than 5000 people, organised by three public Universities in Spain: Barcelona (Catalonia), Girona (Catalonia) and Murcia (Murcia community). The main objective of the project is to enhance the recognition of researchers and their role in society, focusing in one of the their mission: as a communic ...
Read Project

 5

 FINISHED 

Change and Cooperative evolution II

Start date: May 1, 2012,

El objetivo principal de esta iniciativa juvenil llamada “CHANGE AND COOPERATIVE EVOLUTION II” teniendo lugar en Andalucía entre el 29 de junio y el 14 de julio de 2012 es reunir 33 jóvenes entre 15-25 años (algunos entre 25-30), con origen social, étnico y religioso diferentes pero con una gran devoción por Las Bellas Artes en común, de un país miembro de la Unión Europea, España (país coordin ...
Read Project

 2