The project GRAIL has been build with 15 partners from 9 different countries with the aim of finalising the solutions given previously to the valorization of glycerol and transform then in valuable products in a biorefinery approachThe overall concept of GRAIL project is the use, exploitation and further development of the state of the art in the field of bio-based products from glycerol and the d ...
Read Project

 16

 FINISHED 

Steel Coatings For Reducing Degradation in SOFC (SCORED 2:0)

Start date: Jul 1, 2013, End date: Jun 30, 2017,

The economic viability and market place entry of SOFC power systems is directly dependent on their longevity and production costs. Adequate operational life spans can only be achieved, if the performance degradation of the SOFC stacks and Balance of Plant components over time can be considerably reduced. At the same time, manufacturing costs have to be lowered dramatically for the specifically nec ...
Read Project

 9

 FINISHED 
This project combines European know-how in single cells, coatings, sealing, and stack design to produce a novel 1 kW SOFC stack of unprecedented performance, together with the proof of concept of a 10 kWe SOFC stack. Improvements over the state of the art in cost, performance, efficiency, and reliability will be proven, covering all top-level objectives mentioned in the topic. The stacks will be d ...
Read Project

 10

 FINISHED 
"The main objective of the present project proposal is to develop uniform and industry wide test procedures for SOC cell/stack assembly. The proposal builds on experiences gained in the FCTESTNET, FCTESQA series of projects taking up the methodology developed there. This project proposal will address new application fields which are based on the operation of the SOFC cell/stack assembly in the fue ...
Read Project

 6

 FINISHED 

INNOVATIVE CONFIGURATION FOR A FULLY RENEWABLE HYBRID CSP PLANT (HYSOL)

Start date: May 1, 2013, End date: Jul 31, 2016,

Renewable energies have often problems in order to provide a stable and reliable power supply, as they often depend on meteorological circumstances that have a variable or stochastic component. This fact is often used by their detractors to favour the use of other alternatives such as fossil fuels.The main added value of the hybridisation concept will be the achievement of the Europe Strategic Ene ...
Read Project

 8

 FINISHED 
"In order to accelerate the implementation of the CSP technology, the electricity cost has to be reduced by increasing the plants’ efficiency. The HITECO Project aims at doing so by increasing the operating temperature of the heat transfer fluid (HTF) up to 600ºC and therefore raising the overall efficiency of the process. The current state-of-the-art designs are prevented to reach such temperatur ...