Search for European Projects

10 European Projects Found

Searched on 125080 European Projects

 FINISHED 

THE MICRO ALGAE BIOREFINERY (D-FACTORY)

Start date: Dec 1, 2013, End date: Nov 30, 2017,

The D-Factory aims to set a world benchmark for a sustainable biorefinery based on biomass from halophilic microalgae. Representing the largest (100s ha) of current commercial cultivation technologies for any microalga, Dunaliella microalgal biomass production uses raceways and lakes, and will be expanded with biorefinery concepts by drawing in European innovations in key biomass processing techno ...
Read Project

 14

 FINISHED 

Novel Methods in Computational Finance (STRIKE)

Start date: Jan 1, 2013, End date: Dec 31, 2016,

"In recent years the computational complexity of mathematical models employed in financial mathematics has witnessed a tremendous growth. Advanced numerical techniques are imperative for the most present-day applications in financial industry.The motivation for this training network is the need for a network of highly educated European scientists in the field of financial mathematics and computati ...
Read Project

 11

 FINISHED 

Silicon kerf loss recycling (SIKELOR)

Start date: Nov 1, 2013, End date: Oct 31, 2016,

"Solar energy direct conversion to electricity is expanding rapidly to satisfy the demand for renewable energy. The most efficient commercial photovoltaic solar cells are based on silicon. While the reuse of feedstock is a severe concern of the photovoltaic industry, up to 50% of the valuable resource is lost into sawdust during wafering. Presently, the majority of silicon ingots are sliced in thi ...
Read Project

 5

 FINISHED 

Mucus Permeating Nanoparticulate Drug Delivery Systems (ALEXANDER)

Start date: Apr 1, 2012, End date: Mar 31, 2016,

The objective of the ALEXANDER project is the identification of novel strategies (e.g., proteolytic enzyme strategy, thiomer strategy, zeta potential changing systems, SNEDDS strategy) and the optimization of existing strategies (e.g., disulfide breaking strategy and slippery surface strategy) for the efficient transport of nanocarriers through the mucus gel layer (e.g., intestinal, nasal, ocular, ...
Read Project

 20

 FINISHED 

Self–Alerting Safety Jacket (SASJACKET)

Start date: Dec 1, 2012, End date: Nov 30, 2014,

The goal of our project is to develop and integrate an appropriate personal alert and locating beacon (PLB) solution within a life-jacket/PFD so that it becomes integral to the purchase, supply and use of PFDs as Personal Protection Equipment (PPE). These ‘self-alerting’ safety jackets (SASJackets) would be used for local alerting and rescue by maritime and inland waterway employees, passengers, a ...
Read Project

 7

 FINISHED 
Efficient evacuation from transport terminals is usually constrained by a lack of detailed knowledge of the geometry. In most cases, the population attempts to evacuate via the way they entered, bypassing or ignoring emergency exits. In serious fires, the inability to locate emergency exits can lead to loss of life as in the Kings Cross Underground Station (1988) and Düsseldorf airport (1996) fi ...
Read Project

 9

 FINISHED 

Advanced Materials & Pharmaceutical TEChnologies (AMPTEC)

Start date: Dec 31, 2013, End date: Sep 29, 2014,

The Advanced Materials and Pharmaceutical Technologies cluster will gather some of the world leading researchers who want to undertake an innovative project by joining forces and pooling their respective skills.With their expertise on materials sciences, pharmaceutics, continuous processing technologies and medical devices, they will meet new challenges in pharmaceutical and medical development. C ...
Read Project

 12

 FINISHED 

Ship Evacuation Data and Scenarios (SAFEGUARD)

Start date: Apr 1, 2009, End date: Nov 30, 2012,

"The collection of human performance data in full-scale ship trials is vital for the calibration and validation of ship based evacuation models. The IMO Fire Protection Sub-Committee in their modification of MSC circ 1033 at the FP51 meeting in February 2007 invited member governments to provide, “…further information on additional scenarios for evacuation analysis and full scale data to be used ...
Read Project

 9

 FINISHED 

Frequency Agile Microwave Bonding System (FAMOBS)

Start date: Nov 1, 2008, End date: Oct 31, 2012,

The cost of packaging in microelectronics is around 30% of total production costs, but this is rising at an alarming rate due to the increasing consumer demand for smaller and smarter portable electronic devices. In micro-systems, the costs of packaging can be up to 80% of total production costs. Technological advances to reduce packaging costs are therefore of pivotal importance to maintain the c ...
Read Project

 16

 FINISHED 
The aim of the proposed project is to investigate cross-cultural and ethnic differences of human behaviour in crisis situations in order to better tailor security related communication, instructions and procedures with a view to improving evacuation and protection. The project will provide evidence that will be useful to first responders, building designers and those involved in the development of ...
Read Project

 10