Search for European Projects

8 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Buildings Operational stage represents 80% of building’s life-cycle cost of which 50% is consequence of the energy use. Up to 90% of the buildings’ life cycle carbon emissions occur during their operational phase, mainly as consequence of the HVAC, lighting and appliances’ energy use. Therefore, energy and cost saving strategies addressing this building operation phase will have a major impact in ...
Read Project

 13

 FINISHED 
Aiming at developing systems which enable environmentally sustainable flight operations, SGO part of the Clean Sky is working on the implementation of three new operational concepts suitable of being implemented on board through future Flight Management functions.Based on promising results through Laboratory test, ATAEGINA project should contribute to evaluate those concepts on a real operational ...
Read Project

 5

 FINISHED 

Total Airport Security System (TASS)

Start date: Apr 1, 2010, End date: Mar 31, 2014,

"TASS is a multi-segment, multi-level intelligence and surveillance system, aimed at creating an entire airport security monitoring solution providing real-time accurate situational awareness to airport authorities.The TASS concept is based on integrating different types of selected real time sensors & sub-systems for data collection in a variety of modes, including fixed and mobile, all suitable ...
Read Project

 22

 FINISHED 
"CRISIS is a 42 month project to research and develop an advanced critical incident management, interactive simulation environment for training security and emergency personnel in airport operational security. The prototype to be delivered will be distributed, scalable, collaborative interactive simulation environment that will enable training of crisis managers and their staff at airports, at dif ...
Read Project

 13

 FINISHED 
iDetecT 4ALL addresses the urgent need for alerting technology for surveillance and intruders detection inside and in the surrounding of Critical Infrastructures (CI). The limited sensing capabilities as well as the very high cost of existing security equipment impose a barrier to implement necessary security means for ALL CIs with restricted areas including those having budget constrains. IDetecT ...
Read Project

 11

 FINISHED 

Integrated Airport Apron Safety Fleet Management (AAS)

Start date: May 1, 2008, End date: Apr 30, 2011,

One of the main challenges in the apron area is that due to many different companies operating on an airport apron, each company brings in the vehicles and equipment it requires to sustain operation. This causes high levels of congestion in ramp areas, which increases the accident rate and the chances of vehicles and equipment being misused. By gaining telematic data on the running times of the va ...
Read Project

 14

 FINISHED 
The project aims a seamless connectivity and inter-working of embedded localisation and communication systems through a new platform – the LocON Platform. To maintain large infrastructures like airports more efficient, flexible, secure and easier is the main impact – thus LocON is targeting the following objectives:•\tto integrate a hardware/software platform including the middleware for heteroge ...
Read Project

 9

 FINISHED 
Reaching new heights in the air transport industry : Human resources and training managers need to be able to appoint and train staff quickly and flexibly to keep step with the fast pace of the air transport sector. This project provides a network and forum of experts to promote exchanges of information and of experiences at the European level. This project started in 2002 and lasted 36 months.
Read Project

 15