Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...on intralogistic systems to be highly flexible, rock-solid reliable, self-optimising, quickly deployable and safe yet efficient in environments shared with humans. ILIAD will enable the transition to automation of intralogistic services with key stakeholders from the food distribution sector, where these challenges are particularly pressing. We will develop robotic solutions that can integrate wit ...
Read Project

 9

 FINISHED 
"Manufacturing companies are continuously facing the challenge of operating their manufacturing processes and systems in order to deliver the required production rates of high quality products of increasing complexity, with limited use and waste of resources. "Zero Defect Manufacturing" (ZDM) is a recent paradigm aiming at going beyond traditional six-sigma approaches in highly technology intensiv ...
Read Project

 13

 FINISHED 
The goal of the proposed project is the design and development of the BADGER autonomous underground robotic system that can drill, manoeuvre, localise, map and navigate in the underground space, and which will be equipped with tools for constructing horizontal and vertical networks of stable bores and pipelines. The proposed robotic system will enable the execution of tasks that cut across differe ...
Read Project

 7

 FINISHED 
The main objective of this project is to move forward the current waste management practices into a circular economy motto, demonstrating the value of integrating and validating a set of 20 eco-innovative solutions that cover all the waste value chain. The benefits of these solutions will be enhanced by a holistic waste data management methodology, and will be demonstrated in 4 complementary urban ...
Read Project

 19

 FINISHED 
The overall aim of LoCoMaTech is, in the first place, to enable the novel HFQ® process, (patented by ICL) in its latest most advanced form, which includes 10 recently patented refining technologies (TRL4), to be used for the manufacture of lightweight, high strength body and chassis structures and components for low-cost vehicles, by establishing a prototype, full scale pilot production line (TRL6 ...
Read Project

 20

 FINISHED 
Specific raw materials become increasingly important to manufacture high level industrial products. Especially electronic equipment contains precious metals and a series of strategic raw materials. To date the material specific recycling is focused on mass stream concepts such as shredder processes and metallurgy to extract the high-value metallic constituents, i.e. copper, gold, silver. However, ...
Read Project

 10

 FINISHED 

Ultralight and ultrasafe adaptable 3-wheeler (WEEVIL)

Start date: Jun 1, 2015, End date: May 31, 2019,

L category vehicles should answer the demands for less energy consumption and affordability and represent an attractive solution in congested cities with scarce parking space. WEEVIL aims to develop a new L category 3-wheeler that is quiet, clean, energy efficient and safe, as well as attractive to the public so that the barriers for adopting it are minimized. The new vehicle concept is an ultrali ...
Read Project

 11

 FINISHED 

Road-, Air- and Water-based Future Internet Experimentation (RAWFIE)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The purpose of the RAWFIE initiative is to create a federation of different network testbeds that will work together to make their resources available under a common framework. Specifically, it aims at delivering a unique, mixed experimentation environment across the space and technology dimensions. RAWFIE will integrate numerous testbeds for experimenting in vehicular (road), aerial and maritime ...
Read Project

 13

 FINISHED 
EcoSolar envisions an integrated value chain to manufacture and implement solar panels in the most ecologic way by maximising resource efficiency, taking into account reuse of materials during production and repurposing solar panel components at end of life stage. EcoSolar will demonstrate that during the lifetime of a solar electricity producing field, individual panels can be monitored, allowing ...
Read Project

 11

 FINISHED 
...ty of the production systems based on intelligent modular plug-and-produce equipment. To achieve this, it is focusing on three main innovation strands: 1) embedding plug-and-produce capabilities into automation devices, robots and machines, 2) enabling vertical and horizontal connectivity between plug-and-produce automation components and higher level control and business functions, and 3) creatin ...
Read Project

 16

 FINISHED 
District Heating and Cooling networks distribute energy from a centralized generation plant to a number of remote customers. As such, actual DHC systems suffer from• significant heat losses• highly unexplored integration potential of different available energy sources (e.g. renewables and waste heat) into the network• high installation costs.FLEXYNETS will develop, demonstrate and deploy a new gen ...
Read Project

 7

 FINISHED 

EUROBOOSTER

Start date: Sep 1, 2015, End date: Aug 31, 2017,

PROJECT: EUROBOOSTER Organisations involved in this project: Ayuntamiento de Dos Hermanas as Coordinator and ES Vistazul, IES El Arenal, IES Gonzalo Nazareno e IES Hermanos Machado as sending organisations. Number and profile of the participants : 36 young trainees enrolled in any of the Vocational Centres that take part in this project, in any of the following intermediate educational levels : Mi ...
Read Project

 24

 FINISHED 

CRECIENDO EN EUROPA 2

Start date: Sep 1, 2015, End date: Aug 31, 2017,

... Nursing Assistants, Restoration, Image Laboratory, Pharmacy and Pharmaceuticals, Gardening, Trade, Electromechanical Vehicles, Bodywork, Welding, Personal Aesthetics Decorative, Haridressing, Automation, Air conditioning, Electricity, Electronic and Machining. The basic activies we are going to develop are: Describing target group needs, creating the local association, contacting receiving part ...
Read Project

 50

 FINISHED 
During more than 50 years of the laser existence, they have been proved as the unique tool for diverse material processing application. New application ideas, coming from universities and research institutions, are usually implemented by spin-off companies with limited resources for market penetration. Research laboratories are using universal laser tools, while effective and low-cost production r ...
Read Project

 36

 FINISHED 
The aim of the project is to develop a completely new manufacturing system for the volume production of miniaturised components by overcoming the challenges on the manufacturing with a wide range of materials (metallic alloys, composites, ceramics and polymers), through: (i) developing a high-throughput, flexible and cost-efficient process by simultaneous electrical-forming and electric-fast-sinte ...
Read Project

 17

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

...These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Service Oriented Architectures.The objective of the Arrowhead project ...
Read Project

 87

 FINISHED 
VinBot responds to a need to boost the quality of European wines by implementing precision viticulture (PV) tools in the face of serious market threats worldwide and structural shortcomings within the EU wine sector. Wine producer associations have no control over yield management throughout their members’ vineyards, which leads to reduced quality wine at the association level. At the vineyard lev ...
Read Project

 9

 FINISHED 
Environmental wellbeing backed by increasingly severe legislation dictates that pollution and energy consumption by automobiles must be reduced significantly. The outcomes of this project will enable both these imperatives to be achieved simultaneously. The project aim is to establish production lines in Europe that manufacture components for lightweight complex-shaped automobile body structures ...
Read Project

 16

 FINISHED 

CHALLENGES

Start date: Nov 1, 2014, End date: Oct 31, 2016,

Number and profile of the participants : 48 young trainees enrolled in any of the Vocational Centres that take part in this project, in any of the following intermediate educational level : Microcomputer Systems Networking , electrotechnical installations Pharmacy and Pharmaceuticals, Machining , Physical Activity in the Natural Environment . The age of the participants will be between 18 and 25 a ...
Read Project

 21

 FINISHED 

SMART MOBILITY - MOVE BETTER, LEARN FASTER

Start date: Nov 1, 2014, End date: Oct 31, 2016,

The partners have identified the needs of the beneficiaries, that are at the base of the project, through interviews and focus groups, which showed some problematic elements: - ability to organize in autonomy the work; communicate effectively; availability for work mobility and passion for the profession; - lack of knowledge of the labor market and of motivation towards school and work; difficulti ...
Read Project

 32

 FINISHED 

TechSchools@Europa

Start date: Oct 1, 2014, End date: Sep 30, 2016,

...nd women graduated with VET level V, in strategic sectors for the world economy and for most countries, is the best STARTING POINT. These strategic sectors are: Audit and Management Systems; Robotic Automation and Industrial Control; Fashion Trade; Quality Management, Environment and Security; Networks Management & Computer Systems; Industrialization of Fashion Product; Processes of Staining and F ...
Read Project

 51

 FINISHED 

CRECIENDO EN EUROPA I

Start date: Aug 1, 2014, End date: Jul 31, 2016,

...onic equipment and facilities, Aesthetics, Pharmacy and parapharmacy, Administration, Telecommunications, Air conditioning/ heating systems fitting and repair, Gardening, Photographic laboratory, Automation, Hairdressing and Hair Cosmetics, Welding. Students have previously completed a theoretical training period in one of our Consortium centres, and now complete their education with a trainin ...
Read Project

 39

 FINISHED 

Novel biomimetic strategy for bone regeneration (INNOVABONE)

Start date: Nov 1, 2011, End date: Oct 31, 2015,

The importance of developing novel approaches for bone repair is underscored by the heavy burden on health care costs and patient suffering caused by traumatic, osteoporotic and osteolytic metastatic bone lesions. To address these health challenges, we will develop optimally performing bioinspired biomaterials mimicking the natural physiological processes underlying bone repair. Our overall approa ...
Read Project

 14

 FINISHED 

Future Internet Technologies for MANufacturing (FITMAN)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

According to the 2010 EC Competitiveness Report, Manufacturing is still the driving force of Europe's economy, contributing over € 6553 billion in GDP and providing more than 30 million jobs. It covers more than 25 different industrial sectors, largely dominated by SMEs, and generates annually over € 1535 billion (42%) worth of value added services.The mission of the FITMAN (Future Internet Techno ...
Read Project

 41

 FINISHED 

CooperAtive Robot for Large Spaces manufacturing (CARLOS)

Start date: Sep 1, 2013, End date: Aug 31, 2015,

... 7 WP including RTD, dissemination and management tasks, comprising:• Development of a mobile navigation system for shipyard blocks• Development of a sensing and control system for full automation of marking and stud welding• Development of a skilled human-robot interaction system suited to the tasks at hand• Continuous integration towards a final prototype• Demonstration and validation of the sys ...
Read Project

 8

 FINISHED 
Objective of this proposal, called DEMOTOX, is to prove the viability of results obtained as outcome of the OTASENS Project, which was funded within the program “Research for SMEs; FP7–SME–2008–1, Grant Agreement No. 232245. The results obtained in the OTASENS Project offer a potential economic advantage to the partners, because they give them possibility to develop a simple, innovative device, po ...
Read Project

 6

 FINISHED 
The overall objective of IDEAS “Interactive Power Devices for Efficiency in Automotive with Increased Reliability and Safety”, - is to develop advanced packaging for power supply components and new generation memory systems having application on Electric and ICE propelled vehicles and aiming at covering complementary aspects which haven’t yet addressed into the main running ENIAC and ARTEMIS Aut ...
Read Project

 15

 FINISHED 
European industry has a great potential to achieve a leading position in the growing global market of safety-relevant embedded systems, provided it is able to devise efficient and industrial-strength methods and processes for their development and certification.nSafeCer targets increased efficiency and reduced time-to-market by composable safety certification of safety-relevant embedded systems. A ...
Read Project

 31

 FINISHED 
The diagnosis and discrimination of infectious diseases (such as leishmaniasis, dengue, malaria, HIV, chagas) in geographic regions with poor or low-density medical infrastructure is of high socioeconomic importance. While so-called "rapid in-vitro diagnostic (ivD) tests" for single diseases are already on the market, more complex analytical protocols are necessary to clearly identify a certain tr ...
Read Project

 8

 FINISHED 

European Clearing House for Open Robotics Development (ECHORD)

Start date: Jan 1, 2009, End date: Dec 31, 2013,

Description Strengthening the knowledge transfer between scientific research and industry in robotics and stimulating their cooperation In Europe the robotics industry is strong, but still fragmented and dispersed. The objective of ECHORD is to provide new opportunities for coordinated and target- ...
Read Project

 105

 FINISHED 

NANO/MICRO INTEGRATION IN MICROMANUFACTURING (NANOMICRO)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

The new high productive platform for 3D main objective of NANOMICRO project is to provide the manufacturing industry with an entirely nanomicromanufacturing platform, by way of a new micron scale resolution and an innovative direct parallel-deposition process. The process will be able to deliver a layer wise manufacturing approach using highly focalized powder/heat fluxes, with dimensions in the ...
Read Project

 12

 FINISHED 
VERITAS aims to develop, validate and assess an open framework for built-in accessibility support at all stages of ICT and non-ICT product development, including specification, design, development and testing. The goal is to introduce simulation-based and VR testing at all stages of product design and development into the automotive, smart living spaces, workplace, infotainment and personal health ...
Read Project

 33

 FINISHED 
The Moorinspect project will bring a step change to the current in-water moor chain inspection systems through the development and introduction of new method for detection of fatigue cracks in the large chain links used in Deepwater offshore facilities.Moorinspect main objective would be to develop a medium range ultrasonic in-water testing technology using Ultrasonic Guided Waves (UGW) method to ...
Read Project

 9

 FINISHED 
The competitive edge of the European industry in the embedded systems domain is an enabler to achieve a leading position in the growing global market of safety-relevant embedded systems. The main success factors in this context will be the ability to understand the key reasons for the huge increase in cost and development time, and to adopt efficient methods and processes for development of these ...
Read Project

 24

 FINISHED 

Embryonic Stem cell-based Novel Alternative Testing Strategies (ESNATS)

Start date: Apr 1, 2008, End date: Sep 30, 2013,

...ut testing. ESNATS objectives will be achieved in a 5 year multi-disciplinary collaboration of leading European researchers in alternative testing, toxicology, ESC research, genomics, modelling, and automation. The consortium will also include representatives from regulatory bodies, the pharmaceutical industry and ethical advisors to provide guidance to ensure rapid applicability of the developed ...
Read Project

 34

 FINISHED 
The problem that will be the object of the project is the generation of electric energy on vessels. In the troposphere, the wind increases its velocity with the altitude and this velocity is also more constant. KiteVes solution is based on the on-board realisation of a wind-powered generator, capable to harvest the altitude wind and to efficiently convert wind power into electrical power. The kit ...
Read Project

 10

 FINISHED 

Multi-Role Shadow Robotic System for Independent Living (SRS)

Start date: Feb 1, 2010, End date: Apr 30, 2013,

...realised through the following SRS innovations:1) A new intent-based remote control mechanism to enable the robots to be tele-operated over a real-world communication network robustly. 2) An adaptive automation mechanism to enable a highly efficient task execution for remotely controlled service robots. 3) A new robotic self-learning mechanism to enable the robots to learn from their experience. ...
Read Project

 13

 FINISHED 
Electronic devices of the latest generations, being those integrated circuits or discrete components, are often required to operate in harsh environmental conditions, where the temperature may reach over hundred degrees centigrade. Obviously, this has negative impact on several parameters of the electronic devices, ranging from slow-down and transient, recoverable errors to permanent failures and ...
Read Project

 21

 FINISHED 

Modular Urban Transport Safety and Security Analysis (MODSafe)

Start date: Sep 1, 2008, End date: Aug 31, 2012,

The European Urban Guided Transport sector (Light rails, Metros, but also Tramways and Regional Commuter trains) is still characterized by a highly diversified landscape of Safety Requirements, Safety Models, Responsibilities, Roles, Safety Approval, Acceptance and Certification Schemes. While a certain convergence in architectures and systems can be observed the safety life cycle still differs f ...
Read Project

 22

 FINISHED 
OASIS introduces an innovative, Ontology-driven, Open Reference Architecture and Platform, which will enable and facilitate interoperability, seamless connectivity and sharing of content between different services and ontologies in all application domains relevant to applications for the elderly and beyond. The OASIS platform is open, modular, holistic, easy to use and standards abiding. It includ ...
Read Project

 30