Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Read Project

 31

 FINISHED 
The goal of CoPro is to develop and to demonstrate methods and tools for process monitoring and optimal dynamic planning, scheduling and control of plants, industrial sites and clusters under dynamic market conditions. CoPro will provide decision support to operators and managers and develop closed-loop solutions to achieve an optimally energy and resource efficient production. In most plants of t ...
Read Project

 17

 FINISHED 
WiseGRID has two intertwined and equally important strategic goals: on the one hand, it aims at successfully putting in the market, within a horizon of 24 months after project completion, a set of solutions and technologies which increase the smartness, stability and security of an open, consumer-centric European energy grid, with an enhanced use of storage technologies and a highly increased shar ...
Read Project

 21

 FINISHED 
About 40% of the overall energy consumption in Europe is related to the building sector and represents about 1/3 of Europe’s CO2 emissions. The successful accomplishment of the emission reduction target by 2050, involves the need to increase the rate of retrofitting of the inefficient building stock up to 2.9%. In order to increase the renovation rate, more efficient renovation processes from desi ...
Read Project

 16

 FINISHED 
MOEEBIUS introduces a Holistic Energy Performance Optimization Framework that enhances current (passive and active building elements) modelling approaches and delivers innovative simulation tools which (i) deeply grasp and describe real-life building operation complexities in accurate simulation predictions that significantly reduce the “performance gap” and, (ii) enhance multi-fold, continuous op ...
Read Project

 17

 FINISHED 

Technology Advances and Key Enablers for 5 nm (TAKE5)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The TAKE5 project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 10nm technology node and the ECSEL JU project SeNaTe aiming at the 7nm technology node. The main objective of the TAKE5 project is the demonstration of 5nm patterning in line with the industry needs and the ITRS roadmap in the Advanced Patter ...
Read Project

 13

 FINISHED 
EU28 currently generates 461 million tons per year of ever more complex construction and demolition waste (C&DW) with average recycling rates of around 46%. There is still a significant loss of potential valuable minerals, metals and organic materials all over Europe.The main goal of HISER project is to develop and demonstrate novel cost-effective technological and non-technological holistic solut ...
Read Project

 29

 FINISHED 
Living in a safe and secure society is a fundamental human need. The security of critical infrastructures must be maintained so that supplies of power, water or other resources are secured. Modern critical infrastructures are increasingly complex and they are turning into Cyber-Physical Infrastructures because ICT is growing in importance in infrastructure management.The SUCCESS project will dev ...
Read Project

 19

 FINISHED 

Preparing R2 extension to 300mm for BCD Smart Power (R2POWER300)

Start date: Jul 1, 2015, End date: Jun 30, 2018,

R2POWER300 is committed to challenge the following Objectives: • Development and manufacturing of a multi-KET Pilot Line (i.e. Nanoelectronics, Nanotechnology, Advanced Manufacturing) • Energy Efficiency and CO2 Reduction megatrends.The project aims to achieve the following Goals:1. Set the stage for the future extension to 300mm of the R2 Fab facility located in Agrate Brianza (Italy) - i.e. l ...
Read Project

 10

 FINISHED 
NOBEL GRID will develop, deploy and evaluate advanced tools and ICT services for energy DSOs cooperatives and medium-size retailers, enabling active consumers involvement –i.e. new demand response schemas – and flexibility of the market – i.e. new business models for aggregators and ESCOs.Through the dual-use of telecommunication networks, and validating the integration of renewable generation pre ...
Read Project

 24

 FINISHED 

Energy Local Storage Advanced system (ELSA) (ELSA)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

Integration of distributed small/medium size storage systems can allow operating distribution grids much more flexibly, thus realizing smart grid features like local demand-supply balancing, congestion relief, peak shaving and effective RES integration. However, few technologically mature decentralized storage systems are commercially available today at affordable prices, while both viable busines ...
Read Project

 10

 FINISHED 

Seven Nanometer Technology (SeNaTe)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

The SeNaTe project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 12nm and 10nm technology nodes. The main objective is the demonstration of the 7nm IC technology integration in line with the industry needs and the ITRS roadmap on real devices in the Advanced Patterning Center at imec using innovative devi ...
Read Project

 41

 FINISHED 

PANACHE

Start date: Jan 2, 2014, End date: Jan 2, 2018,

Pilot line for Advanced Nonvolatile memory technologies for Automotive microControllers, High security applications and general Electronics :The PANACHE project objective is to set-up a pilot line for embedded Flash technology design and manufacturing platform for the prototyping of innovative µcontrollers in Europe.The current 40nm technology platform as well as the already defined 55nm technolog ...
Read Project

 21

 FINISHED 
The European Commission launched many initiatives in the last few years for the development of accessible tourism, in order to increase the awareness and availability of accessible destinations and products across Europe. Its latest products, the studies on Demand, Training and Supply, describe a situation where a lot of steps forward have been completed but which is still lacking in homogeneity, ...
Read Project

 7

 FINISHED 
"The aim of the Performer project is to devise a holistic (total lifecycle,multi-aspects, context-based) building energy monitoring methodology that factors in appropriate energy performance indicators, information models, and simulation tools, to achieve building energy performance targets. The project energy performance simulation and monitoring aspects will rely on an ICT infrastructure that wi ...
Read Project

 15

 FINISHED 
The lack of proper coordination of aspects related to regulation, financing and management of energy efficiency measures within urban regeneration initiatives, as well as the frequent misalignment of public stakeholders at different levels, are hindering the potential benefits of addressing these processes from an integrated perspective.FosterREG aims at enhancing public capacity at local, regiona ...
Read Project

 11

 FINISHED 

nearly Zero energy Neighborhoods (ZENN)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

Large scale implementation of building renovation actions is affected by a number of barriers of diverse nature. The need for complex agreements, long returns of investment and the fact that often buildings with the worst performance belong to social low income groups unable to afford comprehensive renovation are amongst the main factors hindering the massive adoption of low or nearly zero energy ...
Read Project

 13

 FINISHED 
5 major global semiconductor companies Intel, Samsung, TSMC, IBM and Global Foundries, have decided to work closely together to bring 450 mm semiconductor processing to a mature level, within a consortium called G450C. This operation, based in Albany N.Y., is currently ordering and installing the first wave of 450 mm systems. The major drivers of this effort are Intel and TSMC, which have provide ...
Read Project

 13

 FINISHED 
SEA4KET (Semiconductor Equipment Assessment for Key Enabling Technologies) is an IP proposal taking the consequent step from equipment R&D to equipment assessment experiments. The strategic objective is to effectively combine resources and expertise in a joint assessment of novel equipment for key enabling technologies to foster and accelerate the successful transfer of novel European equipment in ...
Read Project

 26

 FINISHED 
Despite the ongoing efforts on energy efficiency improvements,, the lower energy consumption per data centre does not compensate the cumulative increasing energy demand, due to the combined action of increasing load density in the computer room and rising digitization of human activities. Hence data centres are consuming increasing amount of energy, with a negative impact on the environment and on ...
Read Project

 11

 FINISHED 
Five major global semiconductor companies are working in the G450C consortium based in Albany N.Y. to introduce 450mm wafer semiconductor processing and are now installing the first wave of 450mm prototype systems. Intel and TSMC lead this effort with published roadmaps showing pilot lines in 2016, production in 2018. Samsung will soon follow which will force GlobalFoundries, SK Hynix, Toshiba, UM ...
Read Project

 12

 FINISHED 

European 450mm Equipment Demo Line (E450EDL)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

...package on lithography is to develop a wafer stage test-rig, which can be implemented into the pilot line system.In the work package on front end equipment several tools will be developed such as a plasma ion implant module, a plasma dry etch module, a RTP system and a single wafer cleaning system.Furthermore, in the dedicated work package on metrology 450mm metrology tool types will be developed ...
Read Project

 44

 FINISHED 
... not accompanied minors, the high youth unemployment rate (Dec. 2014: 44% in Italy) as a result of the financial and economic crisis. And we want to analyse, what can be the European surplus of the Erasmus plus programm for young migrants with less opportunities. In the long run we want to think about a concept for a substainable strategic partnership between the partner organisations in Germany ...
Read Project

 9

 FINISHED 
European IC manufacturers are on the way to become suppliers of customized products for OEM companies, which means high flexibility and product diversity. The project aims at conducting research to support the development of new manufacturing procedures, new organizations and new information and control tools to enable IC production lines to efficiently manage a high product and technology mix and ...
Read Project

 29

 FINISHED 
Project in brief Arts, Crafts and Design (ACDs) are traditionally rooted in trading and harbour cities of the Mediterranean area. Historically in these cities the production and sale of such goods were particularly vibrant and, besides inhabitants, concerned visitors came to shop for what they could not find in their place of residence. This commercial network kept alive and dynamic the crafts in ...
Read Project

 8

 FINISHED 
Background Europe produces an estimated 250 million used rubber tyres annually. Moreover, this number is expected to increase with an increase in vehicle fleet numbers and reduced numbers of reconditioned tyres. Historically the majority of end-of-use tyres were sent to landfill sites. However, the landfilling of whole tyres – which creates significant ...
Read Project

 7

 FINISHED 

Future INternEt Smart Utility ServiCEs (Finesce)

Start date: Mar 1, 2013, End date: Sep 30, 2015,

Change is the name of the game in energy! The shift to sustainability is visible everywhere. It is now a European priority to combine solutions which utilise energy generation from renewable energy sources and optimize energy usage efficiency into a Smart Energy System based on the introduction of Future Internet technologies. At the same time, business innovation needs to be encouraged to ensure ...
Read Project

 34

 FINISHED 
FOTsis (European Field Operational Test on Safe, Intelligent and Sustainable Road Operation) is a large-scale field testing of the road infrastructure management systems needed for the operation of seven close-to-market cooperative I2V, V2I & I2I technologies (the FOTsis Services), in order to assess in detail both 1) their effectiveness and 2) their potential for a full-scale deployment in Europe ...
Read Project

 30

 FINISHED 

Enable power technologies on 300mm wafer diameter (EPT300)

Start date: Apr 1, 2012, End date: Mar 1, 2015,

EPT 300 aims to be a decisive step forward to strengthen Europe’s leading position in power semiconductor technologies and More-than-Moore manufacturing capabilities relating to energy efficient electronic solutions. Power semiconductor devices fabricated in a European leading pilot line for 300mm wafer production are the scope of the project, for which manufacturing excellence, cost competitivene ...
Read Project

 22

 FINISHED 

European E&M 450mm Pilotline Readiness (EEM450PR)

Start date: Apr 1, 2012, End date: Mar 1, 2015,

Aim of the EEM450PR project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative. It will also bring about the start of a vision to place an equipment development pilot line in the imec facility in Leuven. This will provide Europe with a complementary activity for 450mm equi ...
Read Project

 32

 FINISHED 

Semiconductor Industry Leading towards Viable Energy Recovery (SILVER)

Start date: Jan 1, 2012, End date: Dec 1, 2014,

...path to solution will be:a) Reduction of direct energy consumption through:• control of the idle mode of equipment• equipment and process modelling• optimization of process recipes on plasma equipmentb) Reduction of D.I. water consumption through:• Introduction of new cleaning procedures;• Optimization of water consumption in critical process steps;• Water recycling and re-use.The final objective ...
Read Project

 14

 FINISHED 
Energy efficiency in buildings will play a major role in responding to climate change and energy issues, if we are able to trigger large scale actions involving EU, all Member States and their regional and local authorities. The concept of “Geo-clusters” is highly relevant, being virtual trans-national areas where strong similarities are found (i.e. climate, culture and behaviour, construction typ ...
Read Project

 12

 FINISHED 
The principal objective of the CILECCTA project is to bring together a top class consortium of academic and industrial researchers, associations and enterprises – both SMEs and LEs – to develop a suite of software that is: capable of full Life Cycle Cost Analysis (LCCA); compatible with codified Price Banks (PBs) and Life Cycle Inventories (LCIs) across Europe; customisable / configurable for whol ...
Read Project

 19

 FINISHED 
ENERGY WARDEN (EW) addresses the optimisation of renewable energy technology (RET) deployment in the building domain. EW will develop and market the following products:SIMULATOR (EW-S): A simulator and modelling tool, including dynamic models for energy producing, storing and using units that may provide decision aid when designing or retrofitting energy infrastructures at the building domain. Imp ...
Read Project

 10

 FINISHED 
Polymer based manufactured components for construction applications have been designed, developed and demonstrated in European projects such as HP FUTURE-Bridge, SAFEFLOOR and MEGAWIND. The results are very promising regarding customer requirements, quality, technical and economical feasibility and the favourable impact of using this kind of composite-based components in terms of sustainability, s ...
Read Project

 19

 FINISHED 

European 450mm Equipment & Materials Initiative (EEMI 450)

Start date: Apr 1, 2010, End date: Mar 1, 2013,

Large-scale semiconductor fabrication is now standardised on 300mm diameter wafers. However, as demand grows and node dimensions diminish, major chipmakers are considering offsetting the growing costs of miniaturisation by increasing wafer size to 450mm to cut cost per produced die. A prerequisite is the availability of the required quality wafers and equipment able to handle larger wafers. The EN ...
Read Project

 27

 FINISHED 
The use of renewable energy in the building sector is today dominated by the application of solar domestic hot water and PV systems in single-family houses. In order to significantly increase the use of renewable energy in the building sector, concepts have to be developed for large buildings. In these buildings high fractions of the energy demand can only be met with renewable energy sources, whe ...
Read Project

 27

 FINISHED 
The objective of the project « Joint Equipment & Materials for System-in-Package and 3D Integration » is to validate technological solutions for the fabrication of high value-added heterogeneous components and systems.This theme, generally known as “More Than Moore”, intends to gather within a unique system a set of various functions, implemented with elementary components, those generally being f ...
Read Project

 20

 FINISHED 
The proposed HERMES project wants to initiate a new mainstream packaging concept not bound by the existing supply chain, and by large-scale manufacturing technology. The project is aiming at further developing the concept of embedded thin chips into electronic boards, as a base for an integrated manufacturing of electronic circuits.The project consortium will develop a technology for embedding act ...
Read Project

 14

 FINISHED 
"The aim of PERFECTION is to help enable the application of new building design and technologies that improve the impact of the indoor built environment on health, comfort, feeling of safety and positive stimulation. The project concept consists of the following components: - the inventory of current standards, regulations, technologies and ongoing and recent research activities and policies relat ...
Read Project

 11