Search for European Projects

23 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Low Emissions Intensity Lime and Cement (LEILAC)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

LEILAC, Low Emissions Intensity Lime And Cement, will successfully pilot a breakthrough technology that will enable both Europe’s cement and lime industries to reduce their emissions dramatically while retaining, or even increasing, international competitiveness. LEILAC will develop, build and operate a 240 tonne per day pilot plant demonstrating Direct Separation calcining technology which will c ...
Read Project

 13

 FINISHED 
The overall aim of the SOTERIA project is to improve the understanding of the ageing phenomena occurring in reactor pressure vessel (RPV) steels and in the internal steels (internals) in order to provide crucial information to regulators and operators to ensure safe long-term operation (LTO) of existing European nuclear power plants (NPPs). SOTERIA has set up a collaborative research consortium wh ...
Read Project

 25

 FINISHED 
STEPWISE is a solid sorption technology for CO2 capture from fuel gases in combination with water-gas shift and acid gas removal. The main objectives of the proposed STEPWISE project is to scale up the technology for the CO2 capture from Blast Furnace Gases (BFG) with three overall demonstration goals in comparison to state-of-the-art amine-based technologies:• Higher carbon capture rate – i.e. lo ...
Read Project

 9

 FINISHED 

CAST (CArbon-14 Source Term) (CAST)

Start date: Oct 1, 2013, End date: Mar 31, 2018,

The CAST project (CArbon-14 Source Term) aims to develop understanding of the generation and release of 14C from radioactive waste materials under conditions relevant to waste packaging and disposal to underground geological disposal facilities. The project will focus on releases from irradiated metals (steels, Zircaloys) and from ion-exchange materials as dissolved and gaseous species. A study t ...
Read Project

 37

 FINISHED 

Contra el paro juvenil: Erasmus +

Start date: Sep 1, 2015, End date: Aug 31, 2017,

Project context : The town of Canals is going through a clear deterioration of their business sector. The main local companies, Ferrys SA, SA Rodrigo Sancho, INPELSA, … have ceased providing stable employment for local residents. The textile and leather tanning industries no longer provide jobs and all those people who used to be employed in this sector are now suffering the consequences of unempl ...
Read Project

 5

 FINISHED 

Preparing ESNII for HORIZON 2020 (ESNII plus)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

Preparing ESNII for HORIZON 2020The aim of this cross-cutting project is to develop a broad strategic approach to advanced fission systems in Europe in support of the European Sustainable Industrial Initiative (ESNII) within the SET-Plan. The project aims to prepare ESNII structuration and deployment strategy, to ensure efficient European coordinated research on Reactor Safety for the next generat ...
Read Project

 37

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project

 29

 FINISHED 

DOMUS FUTURA

Start date: Nov 1, 2014, End date: Oct 31, 2016,

The Project DomusFutura wants to propose an VET mobility to 60 students of 4th and 5th years, attending the technical network high schools: ITI ‘G. Marconi’ in Bari, ITI ‘G. Ferraris ‘in Molfetta, I.T.C. ‘D. Romanazzi ‘ in Bari. The catchment belong to the regional cluster of mechatronics (MEDIS), which finds its epicenter in the regional chief town. The students come from technology sectors (Mec ...
Read Project

 20

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 

DARE TO EXPERIENCE

Start date: Jan 1, 2015, End date: Oct 31, 2015,

The youth exchange "DARE TO EXPERIENCE"; focused on the themes of diversity and inclusion. It was set up between motivated and skilled youth organisations in Ireland, Lithuania, Romania and Austria. We offered our youngsters between 15 and 19 years of age, who have not had the chance to experience European mobility and exchange, a unique learning experience in Summer 2015 in Austria. There were 24 ...
Read Project

 4

 FINISHED 

CONTRA EL PARO JUVENIL: ERASMUS+

Start date: Oct 1, 2014, End date: Sep 30, 2015,

Project context : The town of Canals is going through a clear deterioration of their business sector. The main local companies, Ferrys SA, SA Rodrigo Sancho, INPELSA, … have ceased providing stable employment for local residents. The textile and leather tanning industries no longer provide jobs and all those people who used to be employed in this sector are now suffering the consequences of unempl ...
Read Project

 3

 FINISHED 
The strategic objective of NC2I-R is to structure the European public and private R&D capabilities for delivering a nuclear cogeneration demonstrator fully meeting the market needs, in support of the Nuclear Cogeneration European Industrial Initiative.Following the reference EUROPAIRS project and in close collaboration with the ongoing ARCHER project, national projects (e.g. Polish HTRPL, German S ...
Read Project

 22

 FINISHED 
DemoCLOCK aims to demonstrate the technical, economic and environmental feasibility for implementing packed bed based high temperature high pressure Chemical Looping Combustion (CLC) in large-scale power plants. A medium sized (500 kW) fixed bed reactor will be designed, build and operated integrated in an existing Integrated Gasification Combined Cycle (IGCC) power plant at Elcogas. The packed be ...
Read Project

 11

 FINISHED 
In line with the Sustainable Nuclear Energy Technology Platform (SNETP) Strategic Research Agenda (SRA) and Deployment Strategy (DS), the ARCHER project will extend the state-of-the-art European (V)HTR technology basis with generic technical effort in support of nuclear cogeneration demonstration.The partner consortium consists of representatives of conventional and nuclear industry, utilities, Te ...
Read Project

 34

 FINISHED 

Dense membranes for efficient oxygen and hydrogen separation (DEMOYS)

Start date: May 1, 2010, End date: Jul 31, 2014,

"Membranes for oxygen and hydrogen separation play a key-role in the development of CO2 emission-free coal or natural gas power plants. In addition, cost-effective oxygen and hydrogen production processes are urgently needed in gas supply industry. Today existing membranes, however, are not able to meet the requirements for an economical use because of the high costs in combination with limited pe ...
Read Project

 15

 FINISHED 
"The European Sustainable Nuclear Industrial Initiative was launched in November 2010 to anticipate the development a fleet of fast reactors with closed cycle. Three fast neutron technologies have been selected:• the Sodium cooled Fast Reactor with the ASTRID prototype• the Lead cooled Fast Reactor with the ALFRED demonstrator which will be preceded by a pilotplan MYRRHA• the Gas cooled Fast Rea ...
Read Project

 22

 FINISHED 
"Gas-Cooled Reactors (GCR), RBMK and some Material Test Reactors (MTR) make use of graphite as moderator of the fuel, structures of the core and/or thermal columns. During operation, the graphite and other carbonaceous materials like carbon brick, pyrocarbon and silicon carbide coatings are contaminated by fission products and neutron activation. These irradiated carbonaceous wastes are problemati ...
Read Project

 30

 FINISHED 

European Gas Cooled Fast Reactor (GoFastR)

Start date: Mar 1, 2010, End date: Feb 28, 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Read Project

 22

 FINISHED 
The objective of this coordination action is to develop best practice guidelines for the performance of Level-2 PSA methodologies with a view to harmonization at EU level and allowing a meaningful and practical uncertainty evaluation in a Level-2 PSA. Speficic relationships with community in charge of nuclear reactor safety (utilities, safety authorities, vendors, research or services companies) ...
Read Project

 23

 FINISHED 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi ...
Read Project

 27

 FINISHED 
Technical experts in Europe: a clearer definition of expectations for the more effective exploitation of competencies : Involving trainers and professionals in numerous countries, the Valeurtech project defines the requirements and expectations of SMEs for technical experts undergoing training. As a result, students can prepare more effectively for their course of study and make better use of the ...
Read Project

 38

 FINISHED 
The use of engineering analysis and simulation continues to increase across all sectors of industry and it is recognized that in order to face competition from elsewhere in the world, European companies must introduce competitive products and prepare effectively for the challenges that new technologies will bring. There is also evidence that engineering capability is being lost, as some organizati ...
Read Project

 12

 FINISHED 
...logical crisis, digital revolution, the demographic boom, the globalisation of the economy, the dominance of the science) in coherence with European policies.The project is a partnership lead by the GAMeC, Modern and Contemporary Galley (Italy) and shared among CIAP, Centre International d'Art & du Paysage (France), Malmö Konsthall (Sweden), M csarnok Kunsthalle, (Hungary). The project start setti ...
Read Project

 4