Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The mission of COMPOSELECTOR is to develop a Business Decision Support System (BDSS), which integrates materials modelling, business tools and databases into a single workflow to support the complex decision process involved in the selection and design of polymer-matrix composites (PMCs). This will be achieved by means of an open integration platform which enables interoperability and information ...
Read Project

 11

 FINISHED 
TurboNoiseBB aims to deliver reliable prediction methodologies and noise reduction technologies in order to allow European Aerospace industries:• to design low-noise aircraft to meet society’s needs for more environmentally friendly air transport• to win global leadership for European aeronautics with a competitive supply chain.The project is focusing on fan broadband (BB) noise sources and will o ...
Read Project

 15

 FINISHED 
Effective EU support to a large external crisis requires new approaches. In response to this challenge and to identified user and market needs from previous projects, Reaching Out proposes an innovative multi-disciplinary approach that will optimize the efforts, address a wide spectrum of users and maximize market innovation success.This approach results in five main objectives: to1. Develop a Col ...
Read Project

 29

 FINISHED 
Sectors such as aerospace, automotive, wind power, capital goods are characterised, on the one hand, by complex products and small scale production that require high flexibility and on the other hand by an increasing pressure to raise productivity rates. Furthermore manufacturing systems need to deal with an ever-changing environment due to short term changes caused by human or production related ...
Read Project

 9

 FINISHED 

Future Sky Safety

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Read Project

 32

 FINISHED 

PROJET PILOTE FRANCO ALLEMAND POUR UN ERASMUS DES APPRENTIS

Start date: Jun 1, 2016, End date: May 31, 2018,

Par manque de temps le résumé n'a pas été traduit
Read Project

 2

 FINISHED 
AFLoNext is a four year EC L2 project with the objective of proving and maturing highly promising flow control technologies for novel aircraft configurations to achieve a quantum leap in improving aircraft’s performance and thus reducing the environmental footprint. The project consortium is composed by forty European partners from fifteen countries. The work has been broken down into seven work p ...
Read Project

 41

 FINISHED 

Integrated, Intelligent modular power electronic converter (I2MPECT)

Start date: May 1, 2015, End date: Apr 30, 2018,

Increasingly demanding requirements in the transportation industry for higher efficiency and reduced carbon footprint are leading to an ever increasing interest in electrically operated drives which offer significant benefits over their pneumatic or hydraulic counterparts. More electric aircraft technologies with fully electrical actuation and environmental conditioning systems are moving from top ...
Read Project

 9

 FINISHED 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Read Project

 39

 FINISHED 
The Advisory Council for Aeronautics Research in Europe is the European Technology Platform for Aeronautics and Air Transport (AAT) that provides guidance for the future of the European aeronautics research. ACARE previous roadmap, the Strategic Research Agenda, was highly of inspiration for EC work programme elaboration on Aeronautics and Aviation. In 2011 the European Commission published the Fl ...
Read Project

 10

 FINISHED 
SUNJET II proposal responds to the H2020-MG-2014 Topic 1.8 International Cooperation in Aeronautics of the work programme. Its main objectives are:• Recommendations and guidance for future EU-Japan cooperation in the field of aviationBuilding on the SUNJET project, SUNJET II will produce consolidated roadmaps in the fields of Aircraft, Systems and Equipment, with the support of R&T institutions, A ...
Read Project

 8

 FINISHED 
The central goal of JERONIMO is the understanding of the physical mechanisms of ultrahigh bypass ratio (UHBR) engines with a bypass ratio (BPR) larger than 12 and the related installed jet noise with potential jet-wing interaction. The aim is to reduce uncertainties in jet noise characterisation of this novel installation configuration by wind tunnel tests and predictions and being able to derive ...
Read Project

 13

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

High Altitude Ice Crystals (HAIC)

Start date: Aug 1, 2012, End date: Jan 31, 2017,

Commercial aircraft have been experiencing in-service events while flying in the vicinity of deep convective clouds since at least the early 1990s. Heated probes and engines are the areas of air-craft most prone to mixed phase and glaciated icing threat. In anticipation of regulation changes regarding mixed phase and glaciated icing conditions, the HAIC project will provide the necessary Acceptabl ...
Read Project

 40

 FINISHED 

End-user driven DEmo for cbrNe (EDEN)

Start date: Sep 1, 2013, End date: Dec 31, 2016,

The accidental or deliberate release of CBRNE materials are low probability events that can have a significant impact on citizens and society. Whenever and wherever they occur, they usually require a gradual and multi-facetted response as they tend to provoke severe and unexpected physical, psychological, societal, economical and political effects that cross EU-borders. Successful CBRNE resilience ...
Read Project

 47

 FINISHED 

Initiative Towards sustAinable Kerosene for Aviation (ITAKA)

Start date: Nov 1, 2012, End date: Oct 31, 2016,

ITAKA project is expected to support the development of aviation biofuels in an economically, socially, and environmentally sustainable manner, improving the readiness of existing technology and infrastructures. This will be achieved through the first of its kind collaborative project in the EU, that will develop a full value-chain in Europe to produce sustainable drop-in Hydroprocessed Esters and ...
Read Project

 16

 FINISHED 

Thermal Overall Integrated Conception of Aircraft (TOICA)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Thermal behaviour of aircraft has recently become a crucial subject due to many factors: increasing number of complex systems required by modern, more electric, commercial aircraft, the introduction of hotter engines with higher by-pass ratios, the increased use of composite material in aircraft structures, or the confinement of highly dissipative equipment and systems in smaller areas to earn spa ...
Read Project

 34

 FINISHED 
Even though composite materials are more and more used in modern airframes, many significant improvements are still achievable. Firstly, the substitution of the assembly of many small composite parts by a single one-shot large part provides additional weight reduction. Secondly, the final assembly line process must be adapted to composite properties (lack of ductility, stiffness). Thirdly, if the ...
Read Project

 60

 FINISHED 
In the next decade, EU industries developing Critical Real-Time Embedded Systems (CRTES) (safety, mission or business critical) will face a once-in-a-life-time disruptive challenge caused by the transition to multicore processors and the advent of manycores, tantamount to complex networked systems. This challenge brings the opportunity to integrate multiple applications onto the same hardware plat ...
Read Project

 11

 FINISHED 
The continued use of composite materials in the aerospace industry has been addressed in several past research projects which have focused on new design solutions and composite manufacturing processes. However an area which has been given much less attention up until now is how to achieve a time and cost effective lean assembly production system. The current airframe assembly process of composite ...
Read Project

 33

 FINISHED 
INTERACTION proposes an evolution in airport operations towards a fully integrated and coordinated management of all the processes-passenger, baggage, freight and ramp operations-which are converging into the aircraft turnaround. The main needs are 3: increase time efficiency in each one of the airport processes and the turnaround itself in a coordinated way; reduce the environmental impact of the ...
Read Project

 14

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 
Commercial aircraft fault tolerant control (FTC) strategies in the flight control system (FCS) are based on fail-safe approaches whereby a nominal control law is switched first to a robust solution and then if necessary to a direct law controlling the actuators surfaces. Each component of the control law set is designed off-line and has a different level of robustness and performance. The reasons ...
Read Project

 10

 FINISHED 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Start date: Jan 1, 2013, End date: Jun 30, 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Read Project

 36

 FINISHED 

GReener Aeronautics International Networking-2 (GRAIN 2)

Start date: Oct 1, 2013, End date: May 31, 2016,

As mentioned in the Executive Summary of the Strategic Research & Innovation Agenda, Aviation has an important role to play in reducing greenhouse gas emissions as well as noise and local air quality issues. The continuous increase of air passenger transport generates an increasing use of hydrocarbon fuel with excessive emission of CO2 and NOX (greenhouse gases, pollutants and noise). It is well k ...
Read Project

 25

 FINISHED 
The All-Electric Aircraft is a major target for the next generation of aircraft to lower consumption of non-propulsive power and thus fuel burn. To eliminate hydraulic circuits, pumps and reservoirs, Electro Mechanical Actuators (EMA) are mandatory but now need to meet cost, reliability and weight requirements from the airframers.ACTUATION2015 aims to develop and validate a common set of standard ...
Read Project

 56

 FINISHED 
Cyber-physical networks based on embedded systems are part of our society and gain spread and importance. Next generations of aircrafts and cars will be tightly interconnected with each other, with the Internet and other infrastructures. The same holds for many industries and areas of our life. Ubiquitous, highly critical systems go online and create a domain of mixed criticalities, where security ...
Read Project

 15

 FINISHED 

The SAfer FUEL system (SAFUEL)

Start date: Sep 1, 2012, End date: Feb 29, 2016,

"Fuel Systems (FS) are critical for aircraft safety. Fire, ice and system failures are typical safety hazards associated to FS. FS accidents, though only representing 2% of accidents/incidents, continue to be a recurrent concern, especially as: the complexity of FS escalades to cope with increasing needs, including more stringent safety requirements ; flight conditions evolve with new routes at hi ...
Read Project

 13

 FINISHED 
The transportation industry has for a long time been engaged in the application of new lightweight materials for primary structural design in an effort to develop more energy efficient structures to meet low emissions targets without compromising public safety.This is also true for the rail industry, but the implementation of new lightweight materials has been slow mainly due to the lack of suita ...
Read Project

 19

 FINISHED 

Manual Operation for 4th Generation Airliners (Man4Gen)

Start date: Sep 1, 2012, End date: Dec 31, 2015,

The project will identify current deficiencies of situational awareness and manual control of modern flight decks, and impact the design of procedures, training and cockpit design in the aerospace industry. Procedures will be developed to help the pilot identify not only the fault, but where the airplane is with respect to its operational envelope and limits. By empowering the pilot to utilize his ...
Read Project

 10

 FINISHED 

Aviation Noise Research Network and Coordination (X-NOISE EV)

Start date: Dec 1, 2010, End date: Nov 30, 2015,

The X-NOISE EV Coordination Action, through its network structure and comprehensive workplan involving experts groups, scientific workshops, international cooperation seminars and a common information system, addresses the noise challenges faced by Aviation. To this end, it will more specifically:- Evaluate EU-funded projects results and assess their contribution to the state-of-the-art.- Formulat ...
Read Project

 28

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 

Deployable SAR Integrated Chain with Unmanned Systems (DARIUS)

Start date: Mar 1, 2012, End date: Feb 28, 2015,

Unmanned systems through military programs and numerous R&D projects are now becoming operationally mature. Their use in Search and Rescue operations can now be envisaged to enhance first responder capabilities and intervene in hazardous areas. For cost and procedural reasons however, the market is still very fragmented and business models are unclear.The DARIUS project will leverage previous R&D ...
Read Project

 14

 FINISHED 

Combined Model-based Analysis and Testing of Embedded Systems (MBAT)

Start date: Nov 1, 2011, End date: Dec 31, 2014,

"One of the most important strategic sectors in which Europe is developing, integrating and delivering high-quality products is the transportation domain. Here, high-class safety-related products as e.g. airplanes, cars and trains have a huge market impact. More and more of the market value of these vehicles is gained by embedded systems inside these products, and the number and importance of thes ...
Read Project

 42

 FINISHED 
Description Digital preservation offers the economic and social benefits associated with the long-term preservation of information, knowledge and know-how for re-use by later generations. However, digital preservation has a great problem, namely that preservation support structures are built on projects which are short lived and is fragmente ...
Read Project

 33

 FINISHED 

The Foundation for the Smart Factory of the Future (FoFdation)

Start date: Jun 1, 2010, End date: Oct 31, 2014,

Today's major challenges for manufacturing companies, operating under productivity pressures, greater product variability and environmental constraints, are clearly identified as global cooperation with multiple supply chain partners, production optimization, and tracking and management of information to meet new requirements like traceability, security, sustainability. These requirements lead to ...
Read Project

 19

 FINISHED 

Packaging of futuRe Integrated ModulAr Electronics (PRIMAE)

Start date: Nov 1, 2010, End date: Oct 31, 2014,

"Affordable transport for the citizen relies on innovative solutions and technologies that will result in lower costs and lead-time of the aircraft and its systems. In this area, the packaging of on-board computers is an important contributor.The Packaging of futuRe Integrated ModulAr Electronics (PRIMAE) objective is to develop a new flexible, robust and open aeronautical packaging for the next g ...
Read Project

 20

 FINISHED 
The project aims for the increase of passenger survivability in the case of fire aboard aircraft focused on the next generation of aircraft. The composite materials and other combustible materials are increasingly used in order to reduce the weight of the aircraft or to higher the passenger comfort, but they raise the fire load significantly. Although these materials have passed the certification ...
Read Project

 13

 FINISHED 

OPtimisation for low Environmental Noise impact AIRcraft (OPENAIR)

Start date: Apr 1, 2009, End date: Sep 30, 2014,

Reducing noise from aircraft operations perceived by airport neighbouring communities is a major challenge facing the aircraft manufacturing industry, social society and the air transport business. By adopting a whole aircraft approach based on the latest developments in active / adaptive technologies, flow control techniques and advances in computational aero-acoustics applied to the major causes ...
Read Project

 51

 FINISHED 

Advanced In-flight Measurement Techniques 2 (AIM²)

Start date: Oct 1, 2010, End date: Sep 30, 2014,

"Flight tests of new or modified aircraft are a necessary part of the design process and provide the final validation of the full scale aircraft design. Flight testing for certification is a critical phase as all trials proving compliance with specifications and regulations must be completed in the shortest possible time, while maintaining high quality standards in the certification process. Usual ...
Read Project

 10