Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The RUGGEDISED project will create urban spaces powered by secure, affordable and clean energy, smart electro-mobility, smart tools and services. The overall aims are:1. Improving the quality of life of the citizens, by offering the citizens a clean, safe, attractive, inclusive and affordable living environment.2. Reducing the environmental impacts of activities, by achieving a significant reducti ...
Read Project

 34

 FINISHED 

Fibre Nervous Sensing Systems (FINESSE)

Start date: Oct 1, 2016, End date: Sep 30, 2020,

The unprecedented properties of optical fibres make them ideal to be implemented as 'artificial nervous systems', enabling any tool or structure to become a sensitive and smart object. Conventional optical fibres are small, low-cost and can be seamlessly integrated in materials, in engineering structures and in the environment. By exploiting the most advanced light-matter interactions, these tiny ...
Read Project

 10

 FINISHED 

Rapid Bioprocess Development (Biorapid)

Start date: Jan 1, 2015, End date: Dec 31, 2018,

Reducing lead times of new medicinal drugs to the market by reducing process development and clinical testing timeframes is a critical driver in increasing European (bio)pharmaceutical industry competitiveness. Despite new therapeutic principles (e.g. the use of pluripotent stem cells, regenerative medicine and treatments based on personalised medicine or biosimilars) or regulatory initiatives to ...
Read Project

 9

 FINISHED 
Smart-MEMPHIS project addresses the increasing demand for low-cost, energy-efficient autonomous systems by focusing on the main challenge for all smart devices - self-powering. The project aims to design, manufacture and test a miniaturized autonomous energy supply based on harvesting vibrational energy with piezo-MEMS energy harvesters. The project will integrate several multi-functional technolo ...
Read Project

 9

 FINISHED 

Application Centric IP/Optical Network Orchestration (ACINO)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

The Internet has evolved into a three layer structure: at the top layer sit the applications generating traffic that is groomed at the IP and/or OTN layers and finally transported at the optical layer. Specific application needs, such as latency or protection requirements, are seldom guaranteed, because they are usually implicit and even when they are not, the need of the grooming layer to map lar ...
Read Project

 6

 FINISHED 
The project IoTBe will be proposed as a support action run by the consortium with the partners etventure, Fraunhofer IAIS, Faubourg Numérique, Acreo Swedish ICT and Challengy Israel. Our vision is to build a broad and vibrant ecosystem around the pilot projects that increase the collaboration between them, generates economic impact through new innovative business models and creates trust in the in ...
Read Project

 5

 FINISHED 
Security checks at borders are required to be increasingly thorough and fast. There are currently two types of technologies available for this application: those that automatically detect objects concealed on a person, and those that rely on human operator analysis and interpretation in order to classify or identify body-borne threats.The objective of TeraSCREEN is to combine these two capabiliti ...
Read Project

 12

 FINISHED 
The NanoMag project is to improve and redefine existing analyzing methods and in some cases, to develop new analyzing methods for magnetic nanostructures. Using improved manufacturing technologies we will synthesize magnetic nanoparticles with specific properties that will be analyzed with a multitude of characterization techniques (focusing on both structural as well as magnetic properties) and b ...
Read Project

 18

 FINISHED 
The mission of the NextFactory project is to develop and validate a new type of all-in-one manufacturing technology combining, for the first time, in a single piece of equipment, 3D freeform printing and ultra-precision 3D assembly. This highly flexible and scalable facility will empower microsystem manufacturers - and in particular SMEs - to effectively produce highly miniaturised Smart Products- ...
Read Project

 11

 FINISHED 
EELICON is concerned with an innovative switchable light transmittance technology developed previously in projects co-funded by the EU Framework Programmes. The core of this development are mechanically flexible and light-weight electrochromic (EC) film devices based on a conductive polymer nanocomposite technology with a unique property profile far beyond the current state-of-the art, opening the ...
Read Project

 13

 FINISHED 
...d project serve the Union's Common Security & Defence Policy by increasing the satellite communications security.C3PO mobilises traditional space actors and non-space actors such as TEMATYS (SME) and ACREO (Research).
Read Project

 8

 FINISHED 
The EU has lost a significant share of the electronics manufacture sector to the Far East, resulting in a negative trade balance of >€100bn/year within this sector. This is (in part) due to the current manufacturing technologies that are based on subtractive processing that are expensive, wasteful and energy intensive, making manufacture in the EU economically and environmentally unfeasible. Print ...
Read Project

 11

 FINISHED 

Green Initiative for Future Optical Networks (GRIFFON)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

...ks; Aston – high-speed communication systems and Raman technologies; KTH – the development of high-speed transmitters, receivers and modulators for high-capacity fibre optic communications; and ACREO – digital signal processing techniques and algorithms for compensation of linear/nonlinear transmission impairments in coherent communication systems, to create synergy in development of innovative de ...
Read Project

 5

 FINISHED 
SAFEWATER will develop an affordable global generic solution for the detection and management of drinking water crises resulting from CBRN contamination. SAFEWATER addresses the key drinking water incident management challenges at large, and in particular, the current shortcomings related to the contamination of water networks by CBRN agents - the lack of effective detection capacities, contaminat ...
Read Project

 11

 FINISHED 
In the milk industry, one of most pressing unmet needs is the timely detection of mycotoxins that originate from animal feed and are secreted into milk. In particular, milk and dairy products can be contaminated by aflatoxin M1, a potent carcinogen. The aflatoxin contamination represents a hazard for human health and an economic loss for the dairy industry. The available technology for aflatoxin d ...
Read Project

 10

 FINISHED 
"The REMANENCE concept is to develop new and innovative processes for the recovery and recycling of rare earth (RE) containing neodymium iron boron magnets (NdFeB) from a range of waste electronic and electrical equipment (WEEE). Advanced sensing and mechanical separation techniques combined with innovative processes based on hydrogen decrepitation will recover the rare earth magnets in the WEEE. ...
Read Project

 11

 FINISHED 

CAMART2

Start date: Jun 1, 2015, End date: May 31, 2016,

...nd technologies into products for commercial and public benefits based on exchange of knowledge and synergy with innovation-intensive Consortium partners – KTH Royal Institute of Technology and Acreo Swedish ICT. The partners are worldwide-recognized leaders in research and innovation having pursued a number of successful commercialization projects and are parts of the innovation system in Stockho ...
Read Project

 4

 FINISHED 

Unifying Cloud and Carrier Networks (UNIFY)

Start date: Nov 1, 2013, End date: Apr 30, 2016,

Telecom providers struggle with low service flexibility, increasing complexity and related costs. Although cloud computing and networking have been two very active fields of research, there is currently little integration between the vast networking assets and data centres of telecom providers. UNIFY addresses this by considering the entire network, from home networks up to data centre, as a "unif ...
Read Project

 16

 FINISHED 
Objectives: The general goal of this project is the industrialization of 28/20nm Fully Depleted (FD) Silicon On Insulator (SOI) Technology platforms, enabling 2 different sources in 2 different European countries. The project also aims at establishing and reinforcing a design ecosystem in Europe using these platforms. Last, the project considers extremely important to explore extension towards FD ...
Read Project

 22

 FINISHED 

Zero-impact innovative technology in forest plant production (ZEPHYR)

Start date: Oct 1, 2012, End date: Nov 30, 2015,

The UN General Assembly has proclaimed 2011 as the International Year of Forests, since they play a crucial role in regulating the global climate and are also a vital resource for many countriesBy the European side, the Commission Green Paper “On forest protection and information in the EU: preparing forests for climate change” [COM(2010)66] underlines that forests serve multiple and interrelated ...
Read Project

 14

 FINISHED 
The main goal of MobiS is to create a new concept and solution of a federated, customized and intelligent mobility platform by applying novel Future Internet technologies and Artificial Intelligence methods that will monitor, model and manage the urban mobility complex network of people, objects, natural, social and business environment in real-time. MobiS federation and intelligence is based on t ...
Read Project

 12

 FINISHED 

eXperimental Infrastructures for the Future Internet (XIFI)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

XIFI will establish a sustainable marketplace for trial infrastructures and Future Internet services.XIFI will achieve this vision by integrating and federating a multiplicity of heterogeneous environments – starting from the generic and specific enablers provided by the FI-WARE core platform and the FI-PPP use cases and early trials.Through this approach XIFI will demonstrate and validate the pot ...
Read Project

 38

 FINISHED 

Future Internet Social and Technological Alignment Research (FI-STAR)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

FI-STAR will establish early trials in the Health Care domain building on Future Internet (FI) technology leveraging on the outcomes of FI-PPP Phase 1. It will become self-sufficient after the end of the project and will continue on a sustainable business model by several partners. In order to meet the requirements of a global Health industry FI-STAR will use a fundamentally different, "reverse" c ...
Read Project

 44

 FINISHED 
The consortium of SMEs in the AQUAFARMCONTROL project will pursue a large innovation and market opportunity through the development and demonstration of an innovative system to enable Precision Livestock Farming in marine aquaculture and to effectively eliminate the mounting and critical problem of escapes from fish pens. The system will be based on a multi-purpose capsule implanted in fish, in co ...
Read Project

 9

 FINISHED 

Wireless Insole for Independent and Safe Elderly Living (WIISEL)

Start date: Nov 1, 2011, End date: Mar 31, 2015,

Description WIISEL's main goal is to develop an unobtrusive, self-learning and wearable prevention and warning system to decrease the incidence of falls in the elderly population.The idea is that elderly people put a specifically designed insole in their shoes, which monitors their walking pattern. This way the system may detect changes in g ...
Read Project

 10

 FINISHED 
The project CHARMING aims at developing compact and fully fibred visible lasers for fluorescencespectroscopy, high resolution confocal microscopy and tryptophan imaging. These applications requirepulsed operation (about 100 ps at repetition rates from 1 to 80 MHz), various wavelengths in the visible(from 515 to 630 nm typically) and in the UV (for tryptophan imaging), high average power (up to 500 ...
Read Project

 7

 FINISHED 

Training NETwork on Functional Interfaces for SiC (NETFISIC)

Start date: Feb 1, 2011, End date: Jan 31, 2015,

...NetFISiC consortium is mainly composed (11 out of 12) of the members of the presently running Marie Curie RTN ""MANSiC"" (MRTN-CT-2006-035735). The 12 partners of NetFISiC include 3 companies (SiCED, ACREO and NOVASiC). One associated partner (LIP company) will complement the consortium by providing key training offer and administrative/management assistance. Obviously NetFISiC network will be eff ...
Read Project

 12

 FINISHED 
"Decompression sickness (DCS) is caused by circulating inert gas bubble formation in blood vessels and tissues resulting from supersaturation during inadequate decompression. It is an acknowledged risk of situations involving variations in ambient pressure, such as space flight and extravehicular activity, exposure to altitude, hyperbaric tunnelling intervention, as well as recreational and commer ...
Read Project

 10

 FINISHED 

SweNet Innovation Specialist and Key Account Manager Service (Swennis)

Start date: Jul 1, 2014, End date: Dec 31, 2014,

... though services to involved SMEs will proceed in 2015 to 2020. The project will involve six partners where The Swedish Agency for Economic and Regional Growth will be the coordinator. Swerea, Acreo and Centek will be the partners delivering services, both as Key Account Manager and as Innovation Specialists. Partners ALMI Mitt, SIK and Uminova will be involved in a reference group together with ...
Read Project

 4

 FINISHED 

Satellite Broadband for European Regions (SABER)

Start date: Nov 1, 2012, End date: Oct 31, 2014,

The DAE has an objective to bring basic broadband to all Europeans by 2013 and by 2020 for all Europeans to have access to above 30Mbps with 50% or more of European households subscribing to internet connections above 100Mbps. Objective 5.3 of the ICT PSP Work Programme proposes that satellite communications represent a possible solution.To help achieve these targets, the SABER Thematic Network w ...
Read Project

 26

 FINISHED 
This proposal outlines how the SME partners will develop a low cost Free Space Optics (FSO) product for distribution of fibre-quality broadband to homes. The requirements for high capacity broadband are on the public agenda, and the fibre network backbone is constantly developing. However, the number of subscribers is not increasing at similar rates to match the increase in actual fibre backbone a ...
Read Project

 7

 FINISHED 
SMART-EC aims at the development of self powered (energy harvesting and storage) EC device integrating EC thin film transistor component on a flexible substrate for energy saving, comfort and security in automotive, e-cards and smart packaging sectors.The objective is to overcome the current limitations related to low switching time and manufacturing costs; the switching time can be reduced (<1 ...
Read Project

 13

 FINISHED 

Commercialization Clusters of OLAE (COLAE)

Start date: Sep 1, 2011, End date: Aug 31, 2014,

The main objective of this coordinated action is to promote the commercial exploitation of OLAE (organic and large-area electronics) technology for the benefit of European industry and business and for the welfare of European countries. Through the efforts of COLAE we will be able to provide to European companies effective access to the knowledge base and technology know-how of key European OLAE ...
Read Project

 21

 FINISHED 
"Biodiversity in the seas is only partly explored, although marine organisms are excellent sources for many industrial products. Through close co-operation between industrial and academic partners, the MAREX project will collect, isolate and classify marine organisms, such as micro- and macroalgae, cyanobacteria, sea anemones, tunicates and fish from the Atlantic, Pacific and Indian Oceans as well ...
Read Project

 21

 FINISHED 

Total Airport Security System (TASS)

Start date: Apr 1, 2010, End date: Mar 31, 2014,

"TASS is a multi-segment, multi-level intelligence and surveillance system, aimed at creating an entire airport security monitoring solution providing real-time accurate situational awareness to airport authorities.The TASS concept is based on integrating different types of selected real time sensors & sub-systems for data collection in a variety of modes, including fixed and mobile, all suitable ...
Read Project

 22

 FINISHED 
"Air traffic in Europe is expected to double by 2025 according to the last forecast of Eurocontrol. Future passenger and freight fleets will bring better efficiency and improved environmental performance, and will allow people to benefit from the connections that only air transport can deliver. In this context, an integrated aircraft communication system is of paramount importance to improve effic ...
Read Project

 34

 FINISHED 

Intelligent and Customized Tooling (IC2)

Start date: Oct 1, 2010, End date: Sep 30, 2013,

Intelligent and Customized Tooling (IC2) addresses the need for new technology and organizational models for the tooling industry. By developing a technological foundation and organizational models for intelligent tooling systems customized for user’s needs, the European tooling industry can increase competitiveness trough knowledge intensive tooling and increased customer value. IC2 will be a mul ...
Read Project

 17

 FINISHED 

Emergency Support System (ESS)

Start date: Jun 1, 2009, End date: May 31, 2013,

"The Emergency Support System (ESS) is a suite of real-time data-centric technologies which will provide actionable information to crisis managers during abnormal events. This information will enable improved control and management, resulting in real time synchronization between forces on the ground (police, rescue, firefighters) and out-of-theater command and control centers (C&C). The approach g ...
Read Project

 21

 FINISHED 

Enhancing Printed Electronics Applications by SMEs (CLIP)

Start date: Jun 1, 2010, End date: May 31, 2013,

The project will focus on three development aims: 1) development, formulation and feasibility assessment of several lower-cost alternatives for Silver nanoparticle based conductive inks 2) for these lower-cost inks finding alternatives for conventional screen printing, which allow digital printing combined with high resolution printing and enable contactless printing, which improves quality and re ...
Read Project

 18

 FINISHED 

Optical Access Seamless Evolution (OASE)

Start date: Jan 1, 2010, End date: Feb 28, 2013,

Consumer bandwidth is showing no signs of slowing down and operators are now forced to explore access network migration strategies that will satisfy the anticipated bandwidth demands for the next decade. However, evolving today's access networks towards NG-OA architectures will require a multi-billion euro investment. Consequently, an important strategic aspect is the need for a thorough techno-ec ...
Read Project

 12