 FINISHED 
The typical lifetime of an industrial process plant is between 30 and 50 years. Technologies to enhance the operation and optimization of process plants can both guide the development of new state-of-the-art process plants and, perhaps more pertinently, can ensure that the large installed base of existing plants operates efficiently. The PRONTO Consortium partners are strongly convinced that for E ...
Read Project

 11

 FINISHED 
Individualised production is an emerging trend in manufacturing. Laser-based Additive Manufacturing (LBAM) fits well with this trend, due to its capability of transforming digital designs directly into physical products. LBAM is not yet competitive for a widespread industrial adoption: post-processing operations are necessary and they are not currently integrated, human intervention is needed to o ...
Read Project

 13

 FINISHED 
"In ZERO-PLUS, a comprehensive, cost-effective system for Net Zero Energy (NZE) settlements will be developed and implemented. The system will be composed of innovative solutions for the building envelope, for building energy generation and management, and for energy management at the settlement level. A reduction of operational energy usage to an average of 0-20 kWh/m2 per year (compared with the ...
Read Project

 18

 FINISHED 
The project HERCULES-2 is targeting at a fuel-flexible large marine engine, optimally adaptive to its operating environment. The objectives of the HERCULES-2 project are associated to 4 areas of engine integrated R&D:• Improving fuel flexibility for seamless switching between different fuel types, including non-conventional fuels.• Formulating new materials to support high temperature component ap ...
Read Project

 33

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

Silicon Carbide Power Technology for Energy Eficient Devices (SPEED)

Start date: Jan 1, 2014, End date: Dec 31, 2017,

"Highly efficient Power Electronics (PE) employed in power generation, transmission, and distribution is the prerequisite for the Europe-wide penetration of renewable energies; improves the energy efficiency; increases the power quality and enables continuous voltage regulation, reactive power compensation and automated distribution. It also facilitates the integration of distributed resources lik ...
Read Project

 17

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
The mine of the future will exploit mineral raw materials at greater depths than today, requiring completely different approaches compared to today’s deep mines, in order to get mineral rights. Only these eco-efficient mines will contribute to improved access to domestic mineral resources, secure the supply of mineral raw materials for Europe and reduce the import dependency.IntelliMine will contr ...
Read Project

 27

 FINISHED 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Read Project

 28

 FINISHED 

High Power, high Reliability offshore wind technology (HIPRWIND)

Start date: Nov 1, 2010, End date: Jun 30, 2015,

The aim of the HiPRwind project is to develop and test new solutions for very large offshore wind turbines at an industrial scale. The project addresses critical issues of offshore WT technology such as extreme reliability, remote maintenance and grid integration with particular emphasis on floating wind turbines, where weight and size limitations of onshore designs can be overcome.HiPRWind will t ...
Read Project

 22

 FINISHED 
The STALLION project develops and validates a safety framework for large stationary Lithium Ion batteries in all stages of their life cycle (commissioning, transport, installation, operation, maintenance, repair, decommissioning, recycling). It offers a unique approach by relating safety issues to root causes at all levels of the system (material, cell, module, pack, system). This two-axis safet ...
Read Project

 8

 FINISHED 
The drive across the world towards energy efficiency and reduction of CO2 emissions is leading to new industrial processes and new ways of operating existing processes. In particular, the control and operation of processes, rotating machinery and electrical equipment is becoming radically more integrated giving new opportunities for energy saving through equipment management, automation, and optim ...
Read Project

 10

 FINISHED 
ACOUTRAIN will simplify and improve the acoustic certification process of new rolling stock, in particular relating to the TSI Noise. Today the need of conformity assessment for a new vehicle according to the TSI Noise represents a significant element of both cost and time to market due to the need to carry out expensive and time consuming tests. The goal of the proposed project is to speed up the ...
Read Project

 15

 FINISHED 
"HERCULES was conceived in 2002 as a long-term R&D Programme, to develop new technologies for marine engines. It is the outcome of a joint vision by the two major European engine manufacturer Groups MAN & WARTSILA, which together hold 90% of the world’s marine engine market.The present proposed HERCULES-C project is the Phase III of the HERCULES Programme. In order to take marine engine technology ...
Read Project

 23

 FINISHED 
Power transmission in Europe is entering a period of significant renewal and technological change because the electrical transmission grids face increases in new and variable energy sources, especially from large scale wind power generators. They therefore face future challenges of operation and control. Changes happening in the process industries will also have an impact on electrical supply beca ...
Read Project

 11

 FINISHED 

Validating Changes and Upgrades in Networked Software (PINCETTE)

Start date: Jul 1, 2010, End date: Oct 31, 2013,

...nable certification of upgrades.The PINCETTE consortium is composed of the leading European research experts and prominent infrastructure providers. The PINCETTE technology will be validated at:•\tABB produces and sells components and systems used in utility, industrial, and public transportation infrastructures. A major share of the European power grid is built on ABB equipment.•\tVTT provides th ...
Read Project

 8

 FINISHED 
The first objective of the project is plant-wide application of asset management. It lifts the focus from single-component diagnostics to a plant-wide view of both asset performance and asset condition. Secondly, because di-agnostics need to result in actions, diagnostic information (asset information) is used to generate control actions. Control refers to all levels of the automation pyramid, i.e ...
Read Project

 8

 FINISHED 

Price-based Control of Electrical Power Systems (E-PRICE)

Start date: Feb 1, 2010, End date: May 31, 2013,

The EU electric power system experiences a fundamental change in the quasi-monopolistic, top-down oriented, stable, and reasonable predictable arrangements of the past. It now spans continents, has hundreds of millions consumers and hundreds of thousands of producers, from nuclear power plants to privately-owned and operated badly predictable renewables such as solar cells, wind and microturbines ...
Read Project

 9

 FINISHED 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Read Project

 27

 FINISHED 

Future INternet for Smart ENergY (FINSENY)

Start date: Apr 1, 2011, End date: Apr 30, 2013,

The energy sector has entered a period of major change which will continue for many years to come. The increasing proportion of electricity from renewable sources means that the architecture of the energy grid will have to support the distributed, in addition to the centralised, generation of energy and to adapt to a highly volatile supply e.g. from wind and solar generators. From the consumption ...
Read Project

 41

 FINISHED 
"The CASOPT Project Consortium consisting of ABB, University of Cambridge, Technical University of Munich and Technical University of Graz proposes to facilitate a paradigm change from state-of-the-art Simulation-Based Design to novel Optimisation-Based Design of complex electromagnetically-driven industrial products. This new design philosophy will first enable automatic, physics-governed re-siz ...
Read Project

 4

 FINISHED 
Description Developing "human-centric" technology for industrial robots Robots for industrial production still need a lot of skilled engineering effort for installation, setup and programming. They also require closed-ended environments, with physical protection devices to separate them from human ...
Read Project

 8

 FINISHED 
"The embedded safety-critical systems design and development industry is facing increasing complexity and variety of systems and devices, coupled with increasing regulatory constraints while costs, performances and time to market are constantly challenged.This has led to a profusion of enablers (new processes, methods and tools), which are neither integrated nor interoperable because they have bee ...
Read Project

 54

 FINISHED 
"The project HERCULES-B is the Phase II of the HERCULES programme, conceived in 2002 as a 7-year strategic R&D Plan, to develop the future generation of optimally efficient and clean marine diesel powerplants. The project is the outcome of a joint vision by the two major European engine manufacturer Groups, MAN Diesel and WARTSILA, which together hold 90% of the world’s marine engine market. The r ...
Read Project

 32

 FINISHED 
Society is increasingly dependent on the proper functioning of the electric power system, which in turn supports most other critical infrastructures: water and sewage systems; telecommunications, internet and computing services; air traffic, railroads and other transportation. Many of these other infrastructures are able to operate without power for shorter periods of time, but larger power outage ...
Read Project

 10

 FINISHED 
MMOTION is a support action answering the call EURATOM-Fission-2007-2.1.4 targeting a better understanding of Man-Machine-Organization in the operation of nuclear installations. The objective of MMOTION is to analyse the current situation and the future trends concerning MMO and safety related aspects, and to propose an European research road map for the period 2010-2015 to comprehensively addres ...
Read Project

 11

 FINISHED 
The Q-ImPrESS project aims at bringing service orientation to critical software systems, such as industrial production control, telecommunication and critical enterprise applications. All these domains share a need for guaranteed end-to-end quality of service, but also a need to evolve over their long lifetimes. The Q-ImPrESS project targets this challenge by providing a method to allow developers ...
Read Project

 8

 FINISHED 
ESCoRTS is a joint endeavour among EU process industries, utilities, leading manufacturers of control equipment and research institutes, under the lead of CEN, to foster progress towards cyber security of control and communication equipment in Europe. ESCoRTS will be intersectoral, embracing the following industrial fields: power, gas, oil, chemicals and petrochemicals, pharmaceuticals, manufactur ...
Read Project

 12

 FINISHED 
The EQUAL-CLASS project focussed on qualifications in the field of mechatronics/electrical engineering, which can be achieved in higher non-university VET institutions or comparable institutions in the following countries: AT, CH, DE, LT, PT. Therefore, the EQUAL-CLASS project, as a Transfer of Innovation project, aimed to transfer the methodology developed in the previous ZOOM project.ZOOM develo ...
Read Project

 21