Total Airport Management (PJ04 TAM)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Read Project

 30

 FINISHED 

Integrated Surface Management (PJ03a SUMO)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03 ...
Read Project

 37

 FINISHED 

Increased Runway and Airport Throughput (PJ02 EARTH)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Read Project

 35

 FINISHED 
There are periods during the day when variation in aircraft arrival times combine to exceed the capacity of the destination airport to handle them without incurring airborne delay. Such delay causes increased emissions and noise in the vicinity of the airport, as well as increasing the aircraft operator’s fuel costs. Greater congestion increases the air traffic control workload and can result in l ...
Read Project

 21

 FINISHED 

Flight Object Interoperability VLD Demonstration (PJ27 IOPVLD)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

"One essential goal of the Single European Sky is to improve the Interoperability of the Air Traffic Management (ATM) network. The SESAR approach towards this goal is the introduction of a 4D-trajectory, which is common across all ATM stakeholders, called Reference Business Trajectory (RBT). The Flight Object concept is seen as a key enabler for implementing the RBT for Air Navigation Service Prov ...
Read Project

 14

 FINISHED 

4D Trajectory Management (PJ18 4DTM)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

One of the main obstacles of reaching Single European Sky’s objectives is management of flight trajectories. Inaccuracies are difficult to spot and information given to stakeholders about the trajectory is limited, arriving late, and full of inconsistencies and wrong assumptions. Military Flights are currently not integrated in the ATM-system, so demanding special treatment.Additionally, there is ...
Read Project

 29

 FINISHED 

Content Integration (PJ19 CI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

SESAR 2020 Programme aims to modernise and harmonise the European ATM System from operational and technological perspective. It will develop and validate different ATM solutions that will contribute to achieving its high level performance objectives. In this complex context, it is crucial to have a transversal activity that generates a consolidated big picture of the future European ATM System – t ...
Read Project

 28

 FINISHED 

SWIM Technical Infrastructure (PJ17 SWIM-TI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Single European Sky – the vision is clearly described in the European ATM Master Plan. Reaching the goals for the European Airspace is only possible with focused and extensive technical developments on European level. One of the major challenges is making sure every actor in ATM has the right information at the right time and in a consistent manner, as ATM information is the key to many concepts d ...
Read Project

 29

 FINISHED 
The PJ 14 CNS aims to specify and develop the future Technologies coming from the Communication, Navigation and Surveillance domains in order to support and manage the Operational Services, like the 4D Trajectory Management, in the future ATM System.Performance requirements for CNS systems are becoming increasingly complex and demanding and need to be considered as part of an integrated and holist ...
Read Project

 30

 FINISHED 
Single European Sky – the vision is clearly described in the ATM Masterplan. Reaching the goals for the European Airspace is only possible with focused technical developments on European level.The air traffic controller is the main player in the traffic management at tactical level. This project aims at providing the air traffic controller with more automated tools, thus freeing capacity for situa ...
Read Project

 30

 FINISHED 
PJ.16 project aims to reduce development and operating costs of Air Navigation Service Providers (ANSP). These savings will ultimately benefit airlines and their customers. It achieves this by delivering the ATM Master Plan goals (defined by the European Air Traffic Management (ATM) community) for a more efficient deployment of human resources, a progressive increase in automation support, the im ...
Read Project

 28

 FINISHED 

PJ24 VLD Network Collaborative Management (PJ24 NCM)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

The Network Collaborative Management (NCM) project is based on a collaborative approach involving the whole spectrum of ATM actors: Airspace Users (AUs), Airports, Air Navigation Service Providers (ANSPs) and Network Manager (NM). In Air Traffic Flow and Capacity Management (ATFCM), the performance targets and expectations at the network and local level could to be better achieved only through a c ...
Read Project

 20

 FINISHED 

Initial Trajectory Information Sharing (PJ31 DIGITS)

Start date: Sep 1, 2016, End date: Dec 31, 2019,

"DIGITS will contribute to reinforce the “Enabling Aviation infrastructure” key feature of SESAR 2020 by demonstrating the ATM benefits that can be realized through the use of downlinked 4D trajectory data in ground systems.The project proposes, in a close to operational environment and in fully representative operational conditions, a set of tightly coordinated development and demonstration actio ...
Read Project

 18

 FINISHED 

Common Services (PJ15 COSER)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

The legacy of Air Traffic Management (ATM) evolution in Europe has resulted in today’s highly fragmented, country-based, services. A consequence of this fragmentation, there is a negative impact on the cost in the provision of ATM service in Europe. A fundamental goal of the Single European Sky initiative is to “provide ATM services to airspace users at a cost of at least 50 % less”. The notion ...
Read Project

 19

 FINISHED 

Enhanced Air and Ground Safety Nets (PJ11 CAPITO)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Safety is at the core of ATC. However, safety is interrelated with efficiency. Air and Ground Safety Nets have been developed to increase the achieved level of safety. Necessarily, Ground and Air Safety Nets have to evolve to keep up with the challenges originating from ever increasing traffic density and complexity.ATM evolutions necessary to safely handle increasing traffic demand or to improve ...
Read Project

 14

 FINISHED 

Airport Safety Nets (PJ03b SAFE)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Safety is aviation’s top priority. To work for even safer airports, Project 03b SAFE will define, consolidate and validate additional safety bareers to mitigate the risks of runway incursion, runway excursion and more generally the risk of incidents and accidents involving aircraft at the airport. They will be declined into four Solutions:Solution ‘Enhanced airport safety support tools for control ...
Read Project

 28

 FINISHED 

Enhanced Arrivals and Departures (PJ01 EAD)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

In order to meet forecast traffic growth, PJ01 will develop concepts, tools and procedures to increase the capacity of Terminal Manoeuvring Areas (TMAs) in a safe, cost-effective and environmentally sustainable manner. This will be achieved by taking advantage of the latest technological developments from both an airborne and a ground-system perspective and through the secure sharing of data. The ...
Read Project

 25

 FINISHED 

Trajectory based Free Routing (PJ06 ToBeFREE)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

The Free Routing concept enables Airspace Users (AU) to fly as close as possible to their preferred trajectory, without being constrained by fixed airspace structures or fixed route networks.Free Routing (FR) implementation represents a step towards a less fragmented European airspace foreseen by Single European Sky (SES) and provides the AUs with the possibility to fly their user preferred routes ...
Read Project

 18

 FINISHED 

Master Plan Maintenance (PJ20 AMPLE)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Within the Single European Sky technological pillar, the European ATM Master Plan (ATM MP) is the roadmap to the horizon 2035+ to guide and connect ATM Research and Innovation and Deployment in building the future European ATM System. The European ATM Master Plan Edition 2015 approved by the SESAR Joint Undertaking (SJU) Administrative Board and the European Commission and recently published, set ...
Read Project

 29

 FINISHED 

Remote Tower for Multiple Airports (PJ05 Remote Tower)

Start date: Nov 1, 2016, End date: Nov 30, 2019,

"Cost-effectiveness, clearly described in the topic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA addressed by “PJ05 Remote Tower” project. It proposes the development of a remotely provided aerodrome air traffic service by a "multiple" and/or "center" setting. Those settings help to combine ATS services from various aerodromes in a centralized control roo ...
Read Project

 31

 FINISHED 

Switch and Crossing Optimal Design and Evaluation (S-CODE)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The overall aim of the S-CODE project is to investigate, develop, validate and initially integrate radically new concepts for switches and crossings that have the potential to lead to increases in capacity, reliability and safety while reducing investment and operating costs.The S-CODE project will identify radically different technology concepts that can be integrated together to achieve signific ...
Read Project

 9

 FINISHED 

Advanced DCB (PJ09 DCB)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation ...
Read Project

 30

 FINISHED 

Advanced Airspace Management (PJ08 AAM)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

According to EUROCONTROL’s 2013 Challenges of Growth Report, Air traffic in the ECAC region is forecast to increase by 50% between 2012-2035 (most-likely scenario).Air traffic diversity is expected to become even more complex with the emergence of Remotely Piloted aircraft Systems (RPAS) and the multi-task nature of military aerial missions. The extension of free route operations will also imply m ...
Read Project

 20

 FINISHED 

PJ22:Validation and Demonstration Engineering (PJ22 SEabird)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The aim of SESAR2020.PJ22 is to address one of the Transversal Activities, specifically Validation & Demonstration Engineering. In SESAR 1, the application of an engineering methodology defining the process for development of verification and validation platforms, was optionally mandated to the primary projects, leading to a different level of information available across the Programme. The delive ...
Read Project

 12

 FINISHED 

FAST Nuclear Emergency Tools (FASTNET) (FASTNET)

Start date: Oct 1, 2015, End date: Sep 30, 2019,

When dealing with emergency, two issues with fully different time requirements and operational objectives, and thus different methods and tools, have to be considered: emergency preparedness and emergency response. This project will address both issues by combining the efforts of organizations active in these two areas to make already identified deterministic reference tools and methods a decisive ...
Read Project

 22

 FINISHED 
SafeClouds is a research project supported by EASA and powered by a full spectrum of aviation stakeholders (Airlines, Airports, ANSPs, Eurocontrol, Research Entities, Safety Agencies) that develops cutting-edge technologies for aviation safety assurance in a cost-effective manner. SafeClouds proposes a data-driven approach to achieve a deeper understanding of the dynamics of the system, where risk ...
Read Project

 15

 FINISHED 

PJ07 Optimised Airspace Users Operations (PJ07 OAUO)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

The SES Performance Scheme established the principles of performance-driven ATM and Network-wide Collaborative decision making including Civil and State Airspace Users. Hence, it is critical that Flight and Wings Operation Centres processes and tools be enriched for more efficient interaction with ATM Network stakeholders including Airports. Improved performance of ATM depends on a higher certaint ...
Read Project

 14

 FINISHED 
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment failure (less Hydrogen produced, no corium-concrete interaction), if it can be proved to be feasible.The strategy is already a ...
Read Project

 25

 FINISHED 
The main objective of the project is the development of the pilot scale production system of the new generation of nanoporous organic and hybrid aerogels with multiple functions for application in gas and humidity adsorption, personal care and food. Thereby the fast manufacturing in form of spherical particles will be in focus in order to reduce the process time and to decrease the overall process ...
Read Project

 13

 FINISHED 

Evolution of Emergency Copernicus services (E2mC)

Start date: Nov 1, 2016, End date: Jan 31, 2019,

E2mC aims at demonstrating the technical and operational feasibility of the integration of social media analysis and crowdsourced information within both the Mapping and Early Warning Components of Copernicus Emergency Management Service (EMS). The Project will develop a prototype of a new EMS Service Component (Copernicus Witness), designed to exploit social media analysis and crowdsourcing capab ...
Read Project

 12

 FINISHED 

Future Sky Safety

Start date: Jan 1, 2015, End date: Dec 31, 2018,

The EC Flight Path 2050 vision aims to achieve the highest levels of safety to ensure that passengers and freight as well as the air transport system and its infrastructure are protected. However, trends in safety performance over the last decade indicate that the ACARE Vision 2020 safety goal of an 80% reduction of the accident rate is not being achieved. A stronger focus on safety is required. T ...
Read Project

 32

 FINISHED 
The establishment of good governance will effectively secure the confidence of the industry to use the Interoperability Framework (IF) semantic technologies that will be established under the IP4 Shift2Rail program. The objective of the Governance of the IF for Rail and Intermodal Mobility (GoF4R) project is to define sustainable governance for the IF that will create the right conditions to intro ...
Read Project

 16

 FINISHED 

AUTHENT-NET – Food Authenticity Research Network (AUTHENT-NET)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

It is acknowledged that historically anti-food fraud capability within Europe has not been consolidated and lacks the coordination and support structures available to those working in food safety. There are various initiatives underway to redress this balance e.g. DGSanté’s Food Fraud network, DG Research’s FoodIntegrity project, as well as numerous national programmes and industry initiatives. ...
Read Project

 19

 FINISHED 

COmbining Probable TRAjectories (COPTRA)

Start date: Mar 1, 2016, End date: Feb 28, 2018,

SESAR implementation will result in an environment using extensive and intensive planning to address complexity imbalances and reduce potential conflicts. Accurate planning requires quantifying forecast accuracy at all planning horizons with the main challenge of combining trajectories with different levels of accuracy.A quality indicator giving the forecast accuracy could enhance the situation: I ...
Read Project

 5

 FINISHED 
The increasing interest in Synthetic Vision (SV) and Augmented Reality (AR) technologies has led various analysts to positively esteem the adoption of new tools enabling pilots and controllers to seamlessly operate under Visual Meteorological Conditions and Instrument Meteorological Conditions. The RETINA project will investigate the potential and applicability of SV tools and Virtual/Augmented Re ...
Read Project

 5

 FINISHED 

Eurojoven Castilla y Leon

Start date: Jun 1, 2016, End date: Nov 30, 2017,

Eurojoven Castilla y Leon is carried out by Instituto de la Juventud de Castilla y Leon joined in a consortium to 18 VET centres of the region. 60 young recent graduates in fields such as administrative management, commerce, imaging laboratory, welding and boiler, and electromechanical vehicle body, bakery and pastry, carpentry, laboratory, nursing assistants, characterization, decorative personal ...
Read Project

 24

 FINISHED 

INFORMATION TECHNOLOGIES FOR SHIFT TO RAIL (IT2RAIL)

Start date: May 1, 2015, End date: Oct 31, 2017,

The IT²RAIL -“Information Technologies for Shift to rail” proposal, first step towards the long term IP4 -“IT for an Attractive Railway” SHIFT²RAIL Innovation Programme, aims at providing a new seamless travel experience, giving access to a complete multimodal travel offer which connects the first and last mile to long distance journeys.This is achieved through the introduction of a ground breakin ...
Read Project

 33

 FINISHED 
The main objective of GUIDEnano is to develop innovative methodologies to evaluate and manage human and environmental health risks of nano-enabled products, considering the whole product life cycle. A strategy to identify hot spots for release of nanomaterials (NMs) will be followed by decision trees to guide on the use of (computational) exposure models and, when necessary, design of cost-effecti ...
Read Project

 34

 FINISHED 
The threat of mass casualty incidents or medical surges to healthcare systems has always been present. Preparing essential parts of the healthcare system such as hospitals and their partners to prevent, respond, and rapidly recover from these threats is critical for protecting and securing the entire health infrastructure. Large-scale disaster situations causing mass casualty incidents are charact ...
Read Project

 17

 FINISHED 

Advanced Safety Assessment : Extended PSA (ASAMPSA_E)

Start date: Jul 1, 2013, End date: Dec 31, 2016,

The Fukushima nuclear accident in Japan resulted from the combination of two correlated extreme external events (earthquake and tsunami). The consequences (flooding in particular) went beyond what was considered in the initial NPP design. Such situations can be identified using PSA methodology that complements the deterministic approach for beyond design accidents. If the performance of a Level 1 ...
Read Project