Search for European Projects

10 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Engine Module Validators (ENOVAL)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

The ENOVAL project will provide the next step of engine technologies to achieve and surpass the ACARE 2020 goals on the way towards Flightpath 2050. ENOVAL completes the European 7th Framework Programme (FP7) roadmap of Level 2 aero engine projects. ENOVAL will focus on the low pressure system of ultra-high by-pass ratio propulsion systems (12 < BPR < 20) in conjunction with ultra high overall pre...
Read Project

 37

 FINISHED 

Low Emissions Core-Engine Technologies (LEMCOTEC)

Start date: Oct 1, 2011, End date: Jun 30, 2017,

The main objective of the LEMCOTEC project will be the improvement of core-engine thermal efficiency by increasing the overall pressure ratio (OPR) to up to 70 leading to a further reduction of CO2. Since NOx increases with OPR, combustion technologies have to be further developed, at the same time, to at least compensate for this effect. The project will attain and exceed the ACARE targets for 20...
Read Project

 39

 FINISHED 

PENTINCO 2015

Start date: Jul 1, 2015, End date: Oct 1, 2015,

The youth exchanges project PENTINCO 2015 is the follow up project of ZORBA 2011, JEROMBA 2012, TRIOMBA 2013 and PRODELTA 2014. The first part (ZORBA 2011) was organized in Loutraki, Greece, with overwhelming success; the second part (JEROMBA 2012) was organized in Leuven, Belgium, with an even better outcome. The third and fourth edition were organized in Greece. We are now presenting the fifth P...
Read Project

 3

 FINISHED 

Prodelta 2014

Start date: Jun 17, 2014, End date: Dec 16, 2014,

The youth exchanges project PRODELTA 2014 is the follow up project of ZORBA 2011, JEROMBA 2012 and TRIOMBA 2013. The first part (ZORBA 2011) was organized in Loutraki, GREECE, with overwhelming success; the second part (JEROMBA 2012) was organized in Leuven, BELGIUM, with an even better outcome. We are now presenting the fourth PRODELTA 2014 project that will be organized in July 2014 in a venue i...
Read Project

 3

 FINISHED 

Power Gear Box (PGB) advanced planet bearings development (ABAG)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

"The ABAG (Advanced Bearings And Gears) project supports the SAGE2 project aims to demonstrate technologies for a Geared CROR (Counter-Rotating Open-Rotor) engine concept. The gearbox system requirements, transferring power from the low pressure turbine to the propellers, lead to the need of new, advanced technologies for critical components in particular bearings and their integration with the su...
Read Project

 1

 FINISHED 

Automated Polishing for the European Tooling Industry (poliMATIC)

Start date: Jun 1, 2010, End date: May 31, 2013,

poliMATIC - Automated polishing for the European Tooling IndustryFor the manufacturing of tools 12 to 15 % of the manufacturing costs and 30 to 50 % of the manufacturing time are allocated to polishing. As current automated polishing techniques are almost not applicable on parts with freeform surfaces and function relevant edges like 95% of the tools, the polishing is predominantly done manually.T...
Read Project

 13

 FINISHED 
There is a distinct need for an improved method for accurate and inexpensive deployment and retrieval of seabed sensors and equipment. The AutoDrop will be hydro dynamically designed in order to glide through the water experiencing a minimum of drag. The rudders will maintain stability and change the direction if desired. It is important that the time used by the AutoDrop to travel from the surfac...
Read Project

 11

 FINISHED 
The aim of the ALPINE project it to push forward the research and development of fiber laser systems for scribing of PhotoVoltaic (PV) modules. The project consortium will focus on a new high brilliance, high efficiency and premium beam quality laser based on photonic crystal fibers (PCFs). The all-around development cycle comprising of the beam source, beam delivery and manipulation, scribing pro...
Read Project

 16

 FINISHED 
SERVIVE net proposes the enlargement of the assortment of customizable clothing items currently on offer, the enhancement of all co-design aspects (functionality and fun) and the development and testing of a new production model based on decentralized networked SME cells.The Servive net will not only seamlessly link critical Mass-Customisation (MC) enabling services, but more important it will ada...
Read Project

 17

 FINISHED 
The development of GENERATION IV nuclear systems is identified as an important objective of the present Euratom work programme. The significant support given in FP5 and FP6 allowed Europe to acquire strong assets in the technology of one of the 6 GENERATION IV reactor types, the (V)HTR. In line with these assets and with the recommendation of the Sustainable Nuclear Energy Technology Platform, whi...
Read Project

 27