Search for European Projects

Tidal Turbine Power Take-Off Accelerator (TIPA)
Start date: Nov 1, 2016, End date: Oct 31, 2019 PROJECT  FINISHED 

In this project we will design, build and test an innovative Direct Drive Power Take-Off (PTO) solution for tidal turbines. The consortium’s aim in this project is to reduce the lifetime cost of tidal power by 20%, demonstrated by accelerated life testing of a next-generation tidal turbine power take-off (PTO) solution. Project outputs will be independently verified, and will enable: 1. Improved performance: 20% Lifetime Cost of Energy improvement over a conventional PTO2. Improved reliability: extending service intervals from less than 1 year to over 2 years3. Verified survivability: PTO design lifetime greater than 20 yearsThe results will be disseminated and exploited to maximise the benefit of this project to the ocean energy sector, and to raise investor and market confidence in the emerging tidal energy industry.In order to verify the technology, we will conduct accelerated onshore and in-sea testing of a prototype PTO and achieve third party validation of the design and the test results. In parallel we will develop a commercialisation strategy for selling and licensing the product to tidal energy technology developers, and explore potential uses outside the tidal sector, such as wave power and marine propulsion.The project is led by Nova Innovation, a world-leading tidal energy technology and project developer. Project partners are: SKF, Siemens, The University of Edinburgh, Delft Technical University, Wood Group and the Center for Wind Power Drives RWTH Aachen University.This proposal is being submitted to the call LCE-07-2016-2017: Developing the next generation technologies of renewable electricity and heating/cooling, and is perfectly aligned with the scope of the call: to increase the performance and reliability of ocean energy subsystems.
Up2Europe Ads

Coordinator

Details

6 Partners Participants