Search for European Projects

Screening of the geothermal utilization, evaluation of the thermal groundwater bodies and preparation of the joint aquifer management plan in the Mura-Zala basin Pregled rabe geotermalne energije, ocena podzemnih teles termalne vode in priprava skupnega n (T-JAM)
Start date: Apr 30, 2009, End date: Jun 29, 2011 PROJECT  FINISHED 

Working group meetings, Joint 3-lingual geothermal database, Chemical sampling of the thermal water, Hydraullic and temperature measurements in boreholes, Questionnaire for the thermal water users energetic overview, Screening of the existent heat pump installations, Heat pump workshops, Preparation of the project webpage. Expected Results: Structural-geological model,hydrogeological modelMathematical model,Definition of the potential transboundary thermal water flow direction, Suggestion of the delineation of the potential common thermal groundwater body, Identification of the transboundary geothermal potential, Demonstration heat pump, Publication of the joint final results on the internet in form of 3-lingual publication, Joint 3-lingual publication on the CD-s, 2-lingual leaflets on the best technology practice for heat pumps

Looking for a partnership?
Have a look at
Ma Région Sud!
https://maregionsud.up2europe.eu

Coordinator

Details

  • 67.4%   461 356,56
  • 2007 - 2013 Slovenia - Hungary (SI - HU)
  • Project on KEEP Platform
Project Website

4 Partners Participants