Search for European Projects

Improvement of the joint HU-UA telemetering system in the interest of flood protection at a catchment area level (HUSKROUA/0901/042)
Start date: Dec 31, 2010, End date: Mar 30, 2013 PROJECT  FINISHED 

Оbjectives1. To convert the telemetric system into a process control system1.1 The development of the joint Hungarian-Ukrainian telemetric system in the Hungarian and Ukrainian areas.1.2 Development of the reserve operation of the relays in the high mountains of Ukraine; plan for the implementation of the digital sound transmission system.2. Introduction of the ISO 9001 standard at the Subcarpathia Water Directorate, in hydrographic measurements, data collection and maintenance.3. Communication- IT development of flood control centres.Main activities: Conversion of the telemetric system into a process control system and developing a common Hungarian-Ukrainian rangefinder system2. Introduction of the ISO 9001 standard at the Subcarpathia Water Directorate, in hydrographic measurements, data collection and maintenance.3. Communication- IT development of flood control centres. Achievements: On-line accessibility of operative telemetered dataIncreased flood protection in the complete Upper-Tisza region.Increased necessary time-advance for flood defense due to the conversion of the telemetric system into a process control system.Increased confidence and authenticity of data as a result of the ISO standard introduction at the Subcarpathia Water Directorate.
Up2Europe Ads

Coordinator

Details

  • 90%   786 155,00
  • 2007 - 2013 Hungary-Slovakia-Romania-Ukraine ENPI CBC
  • Project on KEEP Platform
Project Website

1 Partners Participants