Feasibility Study on Synchronous Interconnection o.. (Feasibility Study on..)
Feasibility Study on Synchronous Interconnection of Ukrainean and Molodvan Power Systems to ENTSO-E Continental European Power System
Start date: Oct 7, 2013,
End date: Aug 6, 2015
PROJECT
FINISHED
The final goal of the whole process is that Moldovan TSO and Ukrainean TSO to become ENTSO-E members. Expected Results: Enhanced utilization of border crossing energy network and increased electricity interconnection.
Get Access to the 1st Network for European Cooperation
Log In