Search for European Projects

12 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Under the coordination of VERBUND, VOESTALPINE, a steel manufacturer, and SIEMENS, a PEM electrolyser manufacturer, propose a 26 month demonstration of the 6MW electrolysis power plant installed at the VOESTALPINE LINZ plant (Austria). After pilot plant commissioning, the electrolyser is prequalified with the support of APG, the transmission operator of Austria, in order to provide grid-balancing ...
Read Project

 6

 FINISHED 
The overall aim of LoCoMaTech is, in the first place, to enable the novel HFQ® process, (patented by ICL) in its latest most advanced form, which includes 10 recently patented refining technologies (TRL4), to be used for the manufacture of lightweight, high strength body and chassis structures and components for low-cost vehicles, by establishing a prototype, full scale pilot production line (TRL6 ...
Read Project

 20

 FINISHED 

Research into enhanced tracks, switches and structures (IN2TRACK)

Start date: Sep 1, 2016, End date: Feb 28, 2019,

Research into Enhanced Track, Switches and StructureThe railway of the future needs to meet the predicted growth in societal demand in terms of capacity and service, address the environmental challenges of the 21st century, and enable the political objectives of the European Union. IN2TRACK is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by del ...
Read Project

 26

 FINISHED 
Over the past decade, the steel industry in Europe has been spending a lot of effort in Research and Development of technologies that help in achieving the EU’s CO2 emissions targets and reduce the cost of EU ETS compliance. That has been done through a combination of large scale projects which were part publicly funded with European funding and partly through smaller privately funded research act ...
Read Project

 7

 FINISHED 
In 2011, the White Paper on European Transport reasserted how fundamental transport was for society, for the mobility of European citizens and for the growth and vitality of the European economy.CAPACITY4RAIL will deliver research that is innovative, prepares rail for the future and takes into account results from previous research projects and programmes. The project builds on previous useable re ...
Read Project

 48

 FINISHED 
By bringing together 21 partners including 7 major carmakers, 7 major suppliers, 2 SME's and 5 academia / research centres, ALIVE will develop directly exploitable knowledge on materials and design concepts which offer a high potential for significantly reducing the weight of vehicles for affordable application to high productions volumes, focusing on next generation Electric Vehicles (EVs).Specif ...
Read Project

 26

 FINISHED 
As Europe moves towards low and zero-carbon housing, challenges arise in the management of building integrated renewable energy technologies. Electricity generating RES have the benefit of electrical connection and financial mechanisms allowing feed-in to the network. Thermal technologies do not have such general interconnectivity and therefore rely on sizing typically meeting 90% of summer demand ...
Read Project

 11

 FINISHED 
The RobustPlaNet project aims at developing an innovative technology-based business approach that will drastically change the current rigid supply chain mechanisms and the current product-based business models into collaborative and robust production networks able to timely deliver innovative product-services in very dynamic and unpredictable, global environments. This technology-based business ap ...
Read Project

 12

 FINISHED 

IFA VET mobility+ 2014

Start date: Jun 1, 2014, End date: May 31, 2016,

The funding applied for within the framework of the project will be used to finance stays abroad for a total of 559 individuals and 37 accompanying persons. 321 apprentices will complete a 4 to 6 week internship specifically suited to their profession, individual level of training, knowledge and skills at a company active in their professional field. IFA will organize internships in small groups f ...
Read Project

 73

 FINISHED 
CPV4ALL propose an innovative solution for concentration-based photovoltaic electricity beyond grid parity kWh prices and is oriented on short term results. CPV4ALL aims towards large scale replication in 2015 so that the demonstrated technologies will quickly lead to market deployment and thus significantly contribute to the EU energy and climate change policy (20-20-20 targets by 2020).CPV4ALL f ...
Read Project

 7

 FINISHED 

Multiscale Modelling of Hydrogen Embrittlement (MultiHy)

Start date: May 1, 2011, End date: Apr 30, 2015,

The proposed project aims to advance the state-of-the-art of numerical modelling of hydrogen embrittlement (HE). The primary focus and novelty of the project is the description of H transport in modern advanced materials with complex microstructures. This goal will be achieved through development of a multiscale modelling framework, which will enable the extraction and propagation of information p ...
Read Project

 12

 FINISHED 
Concepts for the development of a corporate culture that fosters learning : The partners in the project "Overcoming learning barriers“ have developed a holistic approach to training older employees, and particularly for R&D engineers and tried it out under practical conditions. The result is a manual in German and English, which offers interested companies individually applicable learning concepts ...
Read Project

 8