Search for European Projects

3 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Evaluation and Viability of Liquid Fuel Fast Reactor System (EVOL)

Start date: Dec 1, 2010, End date: Nov 30, 2013,

An innovative molten salt reactor concept, the MSFR (Molten Salt Fast Reactor) is developed by CNRS (France) since 2004. Based on the particularity of using a liquid fuel, this concept is derived from the American molten salt reactors (included the demonstrator MSRE) developed in the 1960s. The major drawbacks of these designs were (1) a short lifetime of the graphite blocks, (2) a reactor fuelled ...
Read Project

 13

 FINISHED 

European Gas Cooled Fast Reactor (GoFastR)

Start date: Mar 1, 2010, End date: Feb 28, 2013,

Fast reactors have the unique ability to be sustainable by, not only being able to generate their own fuel, but through being able to burn minor actinides to reduce the quantity and radiotoxicity of nuclear wastes. The latter ability enables fast reactors to not only burn the minor actinides produced by themselves but, in addition, the minor actinides arising from legacy wastes and thermal reactor ...
Read Project

 22

 FINISHED 

ADvanced Reactor Initiative And Network Arrangement (ADRIANA)

Start date: Feb 1, 2010, End date: Jul 31, 2011,

"The coordinating action ADRIANA (ADvanced Reactor Initiative And Network Arrangement) is proposed to setting up the network dedicated to the construction and operation of research infrastructures in support of developments for the European Industrial Initiative for sustainable nuclear fission. The project as the base for the current long-term taking place coordination activities of Euroatom under ...
Read Project

 15