Search for European Projects

12 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Low Energy And Near to zero emissions Ships (LeanShips)

Start date: May 1, 2015, End date: Apr 30, 2019,

The specific challenge for waterborne transport call MG4.1 is, “To support developments that make new and existing vessels…more efficient and less polluting”. A sound way to support developments is, to demonstrate solutions that are sufficiently close to market so that ship owners will consider these in their future investment plans. Following this reasoning LeanShips will execute 8 demonstration ...
Read Project

 49

 FINISHED 
...ULES-2 is the next phase of the R&D programme HERCULES on large engine technologies, which was initiated in 2004 as a joint vision by the two major European engine manufacturer groups MAN and WARTSILA. Three consecutive projects namely HERCULES - A, -B, -C spanned the years 2004-2014. These three projects produced exceptional results and received worldwide acclaim.The targets of HERCULES-2 build u ...
Read Project

 33

 FINISHED 

Joint Operation for Ultra Low Emission Shipping (JOULES)

Start date: Jun 1, 2013, End date: May 31, 2017,

Reducing emissions from shipping has increasingly become a challenge over the last years, both as a counter measure against global climate change and to protect local environments and population from waste, gas emissions and noise.This challenge has been documented both in policy papers, like the Europe 2020 initiative or the Transport White Paper, and in rules and regulations issued by IMO as wel ...
Read Project

 44

 FINISHED 

INOvative Energy MANagement System for Cargo SHIP (INOMANS²HIP)

Start date: May 1, 2011, End date: Nov 30, 2015,

The global optimization of energy systems aboard future and currently operating cargos is crucial to reduce greenhouse gas emission in a substantial and cost effective way. It is also of major economic interest in the merchant marine sector.A holistic approach considering the overall production and management of energy aboard ships (including propulsion systems and energy output optimization) is t ...
Read Project

 12

 FINISHED 
Retrofitting is defined as the installation onboard ships of state-of-the-art or innovative components or systems and could in principle be driven by the need to meet new regulatory standards or by the ship owner interest to upgrade to higher operational standards. Retrofitting should become an established practice in the shipping industry involving the entire value chain and exploring the possibi ...
Read Project

 14

 FINISHED 
...ULES was conceived in 2002 as a long-term R&D Programme, to develop new technologies for marine engines. It is the outcome of a joint vision by the two major European engine manufacturer Groups MAN & WARTSILA, which together hold 90% of the world’s marine engine market.The present proposed HERCULES-C project is the Phase III of the HERCULES Programme. In order to take marine engine technology a st ...
Read Project

 23

 FINISHED 

Cathode Subsystem Development and Optimisation (CATION)

Start date: Jan 1, 2011, End date: Jun 30, 2014,

The main objectives of this proposal is to evaluate different process alternatives and find optimal process and mechanical solutions for the cathode and stack subsystems with the aim of having commercially feasible and technologically optimised subsystem solutions ready for future ~ 250 kWe atmospheric SOFC systems. The aspects taken into account in the development are mainly electrical efficiency ...
Read Project

 8

 FINISHED 

Ultra Slow Ships (ULYSSES)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

"With climate change coming to the forefront of society’s perception, there is increasing pressure on all industries to CO2 emissions through increased efficiency and the maritime industry is no exception. The objective of ULYSSES is to demonstrate, through a combination of ultra slow speeds and complementary technologies, that the efficiency of the world fleet can be increased to a point where th ...
Read Project

 14

 FINISHED 

Advanced Intelligent Machine Adaptive Control System (AIMACS)

Start date: Aug 1, 2010, End date: Jul 31, 2013,

"Current machining technologies and practices have many inefficiencies. Numerous unpredictable machining variables often cause overload and unstable conditions and catastrophic damage to the machine tool system. In addition, this results in frequent disruptions in production that can often be excessive, leading to considerable losses in productivity, capital and energy resources. In an effort to p ...
Read Project

 10

 FINISHED 

Breakthrough in European Ship and Shipbuilding Technologies (BESST)

Start date: Sep 1, 2009, End date: Feb 28, 2013,

"Initiated by EUROYARDS, BESST aims to achieve a breakthrough in competitiveness, environmentally friendliness and safety of EU built ships. Focusing on passenger ships, ferries and mega-yachts, the results will to a large extend be applicable also to other ships. A holistic life cycle performance assessment on ship level will guide the technical developments on system level, clustered in System G ...
Read Project

 70

 FINISHED 

Anode Sub-System Development & Optimisation for SOFC systems (ASSENT)

Start date: Jan 1, 2010, End date: Dec 31, 2012,

"The high temperature fuel cell technologies have potential for high electrical efficiency, 45-60%, and total efficiency up to 95%. SOFC has the added benefit of offering commercial applications from 1 kW residential to several MW stationary units with high fuel flexibility. Whilst much effort is devoted to cell and stack issues, less attention has been paid to the components and sub-systems requi ...
Read Project

 6

 FINISHED 
...lop the future generation of optimally efficient and clean marine diesel powerplants. The project is the outcome of a joint vision by the two major European engine manufacturer Groups, MAN Diesel and WARTSILA, which together hold 90% of the world’s marine engine market. The research objectives in HERCULES-B focus on the drastic reduction of CO2 emissions from maritime transport, considering the ex ...
Read Project

 32