Search for European Projects

29 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Background Freshwater habitats are among the most threatened habitat types globally. In the 2007-2012 conservation status assessment of the EU Habitats Directive (Article 17), none of the freshwater, coastal, and groundwater dependent wetland habitats in Europe fully met favourable conservation status, and most are in unfavourable conservation status. Alm ...
Read Project

 30

 FINISHED 
The main goal of the LORCENIS project is to develop long reinforced concrete for energy infrastructures with lifetime extended up to a 100% under extreme operating conditions. The concept is based on an optimal combination of novel technologies involving customized methodologies for cost-efficient operation. 4 scenarios of severe operating conditions are considered:1. Concrete infrastructure in d ...
Read Project

 17

 FINISHED 
The overall aim of the SOTERIA project is to improve the understanding of the ageing phenomena occurring in reactor pressure vessel (RPV) steels and in the internal steels (internals) in order to provide crucial information to regulators and operators to ensure safe long-term operation (LTO) of existing European nuclear power plants (NPPs). SOTERIA has set up a collaborative research consortium wh ...
Read Project

 25

 FINISHED 
Four major Distribution System Operators (in Italy, France, Spain and Sweden) with smart metering infrastructure in place, associated with electricity retailers, aggregators, software providers, research organizations and one large consumer, propose five large-scale demonstrations to show that the deployment of novel services in the electricity retail markets (ranging from advanced monitoring to l ...
Read Project

 21

 FINISHED 
Unlike the control and observability put in service in HV/MV, LV networks are still being substantially managed as usual: no visibility of power and voltage or grid components status, poor knowledge of connectivity, manual operation of switches or few tools for worker support. The LV grid characteristics (radial topology, exposition to local disturbances, local accumulation of distributed generati ...
Read Project

 20

 FINISHED 

Zero Emission bUs Systems (ZEEUS)

Start date: Nov 1, 2013, End date: Apr 30, 2017,

Electrification of the public transport is a raising trend in Europe, and electric buses are soon expected to enter markets as one of the most interesting options for matching urban environmental targets. Electrification is driven by both economics and politics. However, although technology is not yet fully matured and ready for wide commercialisation, a large demonstration project will facilitat ...
Read Project

 41

 FINISHED 

New Bus ReFuelling for European Hydrogen Bus Depots (NewBusFuel)

Start date: Jun 1, 2015, End date: Dec 31, 2016,

The overall aim of NewBusFuel is to resolve a significant knowledge gap around the technologies and engineering solutions required for the refuelling of a large number of buses at a single bus depot. Bus depot scale refuelling imposes significant new challenges which have not yet been tackled by the hydrogen refuelling sector:• Scale – throughputs in excess of 2,000kg/day (compared to 100kg/day fo ...
Read Project

 27

 FINISHED 

Clean Hydrogen in European Cities (CHIC)

Start date: Apr 1, 2010, End date: Dec 31, 2016,

The Clean Hydrogen in European Cities (CHIC) Project is the essential next step to full commercialisation of hydrogen powered fuel cell (H2FC) buses. CHIC will reduce the ‘time to market’ for the technology and support ‘market lift off’ – 2 central objectives of the Joint Undertaking.CHIC will:- Intensively test the technology to generate learning for the final steps towards commercialisation by o ...
Read Project

 26

 FINISHED 

Optimal Design Tools for Ocean Energy Arrays (DTOCEAN)

Start date: Oct 28, 2013, End date: Oct 27, 2016,

The DTOcean project is aimed at accelerating the industrial development of ocean energy power generation knowledge, and providing design tools for deploying the first generation of wave and tidal energy converter arrays.The areas of hydrodynamic array layout, electrical infrastructure, operations, maintenance & control, moorings & foundations, and installation & logistics bring critical challenges ...
Read Project

 19

 FINISHED 

Preparing NUGENIA for HORIZON2020 (NUGENIA-PLUS)

Start date: Sep 1, 2013, End date: Sep 30, 2016,

Preparing NUGENIA for HORIZON 2020The objective of the NUGENIA+ project is to support the NUGENIA Association in its role to coordinate and integrate European research on safety of the Gen II and III nuclear installations in order to better ensure their safe long term operation, integrating private and public efforts, and initiating international collaboration that will create added value in its a ...
Read Project

 52

 FINISHED 
As the patterns of power generation and distribution are rapidly changing in Europe towards a highly dispersed and volatile system, Distribution System Operators need to completely change traditional ways of grid operations. Currently developed solutions to increase the intelligence of medium and low voltage grids to cope with this task are often highly specialized, non-replicable and therefore no ...
Read Project

 13

 FINISHED 
Grid4EU project is an innovative SmartGrid project proposed by a group of Distribution System Operators (from Czech Republic, France, Germany, Italy, Spain and Sweden), in close partnership with a set of electricity retailers, manufacturers and research organizations.Adopting a systemic approach and organized around large-scale demonstrations networks located in six different countries, its struct ...
Read Project

 28

 FINISHED 
Torrefaction is considered worldwide as a promising key technology for boosting large-scale implementation of bioenergy. It involves heating biomass in the absence of oxygen to a temperature of 200 to 320 °C. As a result, the biomass looses all its moisture and becomes easy to grind and water resistant, which reduces the risk of spontaneous ignition and biological degradation and permits outdoor s ...
Read Project

 23

 FINISHED 
In contrast to other renewable energy sources, wave energy conversion is currently at a stage of evolution where it is being demonstrated using a wide range of very diverse technologies and a de facto standard approach is yet to emerge. A fully functional, but reduced scale prototype Wavebob wave energy converter (WEC) has already been deployed in the Atlantic Ocean. STANDPOINT will seek to demons ...
Read Project

 6

 FINISHED 
...Environment Institute (Finland), and three successful and quickly developing enterprises with unique complementary expertise and tools: Water Insight (The Netherlands); Brockmann Consult (Germany); Vattenfall Power Consult (Sweden). The advanced research programme of WaterS consortium will be realized through the following transfer of knowledge programme: • Introduction of the state-of-the-art met ...
Read Project

 8

 FINISHED 

Characterisation of European CO2 storage (SiteChar)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

SiteChar will facilitate the implementation of CO2 storage in Europe by improving and extending standard site characterisation workflows, and by establishing the feasibility of CO2 storage on representative potential CO2 complexes suitable for development in the near term.Reasonable estimates of the theoretical capacities of storage sites have been undertaken in previous studies. We will develop a ...
Read Project

 17

 FINISHED 

CO2 Site Closure Assessment Research (CO2CARE)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

CO2CARE aims to support the large scale demonstration of CCS technology by addressing the research requirements of CO2 storage site abandonment. It will deliver technologies and procedures for abandonment and post-closure safety, satisfying the regulatory requirements for transfer of responsibility. The project will focus on three key areas: well abandonment and long-term integrity; reservoir mana ...
Read Project

 23

 FINISHED 

Research into Impacts and Safety in CO2 Storage (RISCS) (RISCS)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

"Although significant leakage from CO2 storage sites is not expected, if it did occur there could be adverse environmental consequences, which are not well constrained. The objective of RISCS is to provide fundamental research on environmental impacts, necessary to underpin frameworks for the safe management of CO2 storage sites. To achieve this, RISCS will quantitatively assess environmental impa ...
Read Project

 23

 FINISHED 
"The project aims at developing a unique device for electricity networks: A superconducting fault current limiter (SFCL) based on coated conductor YBCO tape (cc-tape) or 2nd Generation HTS tape. The general trend in Europe to a higher meshing of distribution networks and the rapid growing integration of renewable energy sources leads to an increase of the fault current level by every new installat ...
Read Project

 16

 FINISHED 

Innovative CO2 capture (iCap)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

In post-combustion CO2 capture, a main bottleneck causing significant reduction in power plant efficiency and preventing cost effectiveness is the low flue gas CO2 partial pressure, limiting membrane flux, solvent selection and capacity. In pre-combustion CO2 capture, key bottlenecks are number of processing steps, possible low hydrogen pressure, and high hydrogen fraction in the fuel Global deplo ...
Read Project

 14

 FINISHED 
"ADDRESS will research, develop and deploy technologies and processes to increase usage of Distributed Generation and Renewable Energy Resources thereby engaging in a new relationship between customers, generators and network operators. ADDRESS aims to develop new innovative architectures for Active Distribution Networks (ADN) able to balance in real time power generation and demand allowing netwo ...
Read Project

 27

 FINISHED 
Today, there are largely no communications infrastructure deployments in European medium and low voltage power distribution networks. Powerline communications has a large potential to enable new and intelligent applications to and from the last branch of the distribution grid. However, current powerline communication technologies cannot offer the reliability, quality of service and interoperabilit ...
Read Project

 14

 FINISHED 

European Value Chains for CO2 (ECCO)

Start date: Sep 1, 2008, End date: Nov 30, 2011,

The main objective of ECCO is to facilitate robust strategic decision making regarding early and future implementation of CO2 value chains for Europe in the face of uncertainty. The project will provide recommendations enabling cost-effective use of the CO2 being produced from zero-emission power plants and other industries in Europe by exploring the assets and challenges of CO2 for enhanced hydr ...
Read Project

 20

 FINISHED 
This project aims at paving the road towards large-scale, Europe-wide infrastructure for the transport and injection of CO2 from zero-emission plants. The project will prepare for the optimum transition from initial small-scale, local initiatives towards large-scale CO2 transport and storage that is to start around 2020, with key stakeholders in the field of carbon capture, transport and storage. ...
Read Project

 19

 FINISHED 
"Electric and plug-in hybrid vehicles (EV, PHEV) have the potential to contribute significantly to solving contemporary and future environmental and economic challenges of mobility. Various projects in different EU member states are currently addressing the subject in an isolated manner. The G4V consortium consisting of major European electric utilities and distinguished academic institutions are ...
Read Project

 14

 FINISHED 
Nowadays, wind power has an increasing share in the electricity generation mix in several European countries. Due to the intermittent nature of wind, the large-scale integration of wind power causes several difficulties in the management of a power system. Often, a high level of reserves is allocated to account for wind power variability, thus reducing the benefits from the use of wind energy.Toda ...
Read Project

 22

 FINISHED 

CO2 Enhanced Separation and Recovery (CESAR)

Start date: Feb 1, 2008, End date: May 31, 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Read Project

 22

 FINISHED 
Reduction of energy consumption is a societal challenge that requires combination of technical, economical, and social means. So far, energy conservation has focused on new technologies and automation, treating users as passive consumers. However, strong evidence suggests that users can adapt actively their behaviour to energy saving with suitable feedback, support, and incentives, reducing signif ...
Read Project

 10

 FINISHED 
The Supporting Action NextHyLights will work in close cooperation with and under supervision of FCH JU. NextHyLights will directly contribute to the FCH JU activities regarding the preparation of the next calls and will be prepared to react flexibly on FCH JU requirements. It will use the MAIP as the basis and will help to detail it towards the AIPs taking the ambitions and opportunities of all st ...
Read Project

 12