Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
...for contemporary social and societal issues. Universities from five countries jointly deliver the Global-MINDS programme in English and award graduates with a joint master degree:• ISCTE – Lisbon University Institute (ISCTE-IUL), Portugal• University of Oslo (UiO), Norway • University of Social Sciences and Humanities (SWPS), Poland• Koç University (KU), Turkey• University of Limerick (UL), Irelan ...
Read Project

 5

 FINISHED 
Integrating activities planned under MaRINET 2 build upon the achievements of the advanced community created in MaRINET FP7. MaRINET 2 will ensure the continued integration and enhancement of all leading European research infrastructure and facilities specialising in research, development and testing of offshore renewable energy systems including electrical sub systems and grid integration through ...
Read Project

 39

 FINISHED 
PROTECT aims to introduce to the market One step antimicrobial finish processes for polymeric materials used in i) specialty textiles for public areas and hospitals, ii) water treatment membranes, and iii) implantable medical devices. Compared to main existing manufacturing routes, the proposed one-step coating technologies are simple, fast, and reproducible. For this, PROTECT uses as a starting p ...
Read Project

 23

 FINISHED 

Lignin Based Carbon Fibres for Composites (LIBRE)

Start date: Nov 1, 2016, End date: Oct 31, 2020,

The use of carbon fiber (CF) based composites is of growing importance in many industrial applications with the current global market estimated at $28Bn [ref 9]. However, the current high cost, limited production capability in Europe and the use of petroleum-based polyacrylonitrile (PAN) as the precursor fiber (PF) from which the CF is ultimately derived, requires the development of innovative rou ...
Read Project

 12

 FINISHED 
The European aerospace, automotive, and rail industries are committed to improving their energy efficiency to meet targets set within the EU’s climate, energy and transport policies. This is motivating the increased use of lightweight composite materials in lieu of heavier metallics. To implement this transition, these industries must reach, at least, the same level of crash performance achieved w ...
Read Project

 9

 FINISHED 
This H2020-FETOPEN-2016-2017 proposal initiates a major international effort to direct polymorphism in pharmaceutical compounds through crystallizing in high magnetic fields. The ability to direct polymorphism would have a transformative effect on almost all pharmaceutical compounds, and hence on society.It is proposed that MagnaPharm will drive forward innovation in pharmaceuticals by exploiting ...
Read Project

 4

 FINISHED 

Learning for Innovative Design for Sustainability

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The goal of the Learning for Innovative Design for Sustainability (L4IDS) project is to promote sustainable consumption and production of products and services in Europe. This will be achieved through a knowledge co-creation process and the development of training materials in order to teach and train students, faculty and enterprise staff of the design sector in Innovative Design for Sustainabili ...
Read Project

 13

 FINISHED 
...gas flows as well as thermally driven micro gas separators to micro-scale devices for enhanced and efficient heat recovery in automotive, aeronautics and energy generation. This unique combination of university research, SME and world leading industrial stakeholders will contribute in a significant way to the increase of knowledge about micro scale gas flow heat transfer problems as well as to ind ...
Read Project

 11

 FINISHED 

Combating Fiscal Fraud and Empowering Regulators (COFFERS)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

Since 2008 'fiscal leaks' have become an immediate policy challenge for EU governments, partly as a result of tax abuse. The COFFERS project unfolds as EU tax authorities transition to a new era in tackling tax abuse based upon policy innovation at the OECD, EU and national levels. COFFERS recognizes this creates a state of flux where much tax authority expertise regarding past regulations, system ...
Read Project

 9

 FINISHED 

Homelessness as unfairness (HOME_EU)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

Empirically informing a European theory of justice is a complex and challenging endeavour, however the emergence of current social crisis, and the resulting inequalities and unfairness, bring about the need to revise the premises that facilitate translation of the theory into concrete guidance to effective social policies and coherent programs and practices.To respond to this challenge, a trans-di ...
Read Project

 12

 FINISHED 

Electronic International Forum for Teacher Educator Development

Start date: Sep 1, 2016, End date: Aug 31, 2019,

...orum and links to events for teacher educators’ professional development. It will offer blended learning opportunities to local, national and European communities of practice responsible for university- and school based teacher educator development. 2. EUROPEAN PROFESSIONAL DEVELOPMENT PROGRAMME FOR TEACHER EDUCATORS (EDPD) to bring experienced European teacher educators together, to learn from ...
Read Project

 8

 FINISHED 
...e issues across the educational continuum and through international collaboration. The project involves HEIs and linking schools (primary and secondary) as partners from four countries: Limerick University and Mary Immaculate College in Ireland, Professionshøjskolen UCC in Denmark, the University of the Western Cape in South Africa and Oslo and Akershus University College of Applied Sciences in No ...
Read Project

 10

 FINISHED 

Vision Inspired Driver Assistance Systems (VI-DAS)

Start date: Sep 1, 2016, End date: Aug 31, 2019,

Road accidents continue to be a major public safety concern. Human error is the main cause of accidents. Intelligent driver systems that can monitor the driver’s state and behaviour show promise for our collective safety. VI-DAS will progress the design of next-gen 720° connected ADAS (scene analysis, driver status). Advances in sensors, data fusion, machine learning and user feedback provide the ...
Read Project

 16

 FINISHED 
The overall objective for iBUS is to develop and demonstrate by 2018 an innovative internet based business model for the sustainable supply of traditional toy and furniture products that is demand driven, manufactured locally and sustainably, meeting all product safety guidelines, within the EU. The iBUS model focuses on the capture, creation and delivery of value for all stakeholders – consumers, ...
Read Project

 10

 FINISHED 
The XoSoft project will develop a modular soft lower-limb exoskeleton to assist people with mobility impairments. The consortium includes 5 research groups and 3 companies each with EU project experience in exoskeleton/assistive orthoics development. XoSoft, a class I medical device, assists people with low to moderate levels of reduced mobility, enabling them to remain active performing tasks of ...
Read Project

 9

 FINISHED 
Description (EN): FREED will develop a new service, by the means of which SME’s in the region can access innovation in energy technologies otherwise not be available within the NPA region. FREED will also facilitate the transfer of technology innovations to SME’s across the area, so that the outputs of the project will widely benefit the region. It will achieve this because it provi ...
Read Project

 7

 FINISHED 
Sustainable bioenergy production and use in the EU should be further developed in order to support Member States (MS) achieving 20-20-20 targets and foster rural development as set out in EIP AGRI. FORBIO will demonstrate the viability of using land in MSs for non-food bioenergy feedstock production without interfering with the production of food or feed, nor with land currently used for recreatio ...
Read Project

 13

 FINISHED 

Cloud Large Scale Video Analysis (Cloud-LSVA)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Cloud-LSVA will create Big Data Technologies to address the open problem of a lack of software tools, and hardware platforms, to annotate petabyte scale video datasets. The problem is of particular importance to the automotive industry. CMOS Image Sensors for Vehicles are the primary area of innovation for camera manufactures at present. They are the sensor that offers the most functionality for t ...
Read Project

 12

 FINISHED 

Excelling LABUST in marine robotics (EXCELLABUST)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Laboratory for Underwater Systems and Technologies (LABUST) at the University of Zagreb Faculty of Electrical and Engineering (UNIZG-FER) in Croatia positioned itself in the last years as the regional leader in marine robotics: LABUST has the required technologies, people, infrastructure, and experience in field experiments. What LABUST is missing is research excellence that will allow it to fully ...
Read Project

 4

 FINISHED 
The height of conventional wind turbines is limited by the enormous stresses on the structure. The idea of the Airborne Wind Energy (AWE) is to replace the most efficient part of a conventional wind turbine, the tip of the turbine blade, with a fast flying high efficiency kite, and to replace the rest of the structure by a tether which anchors the kite to the ground. Power is generated either by p ...
Read Project

 10

 FINISHED 
...tries (Thales Alenia Space Italia, Airbus Defense and Space, Telespazio), research organizations (DLR, CNR, AWI), SMEs (Liquifer, Heliospectra, EnginSoft, Aero Sekur) and academia (Wageningen UR, University of Guelph, Limerick Institute of Technology) from six European countries (Germany, Ireland, Italy, Sweden, Austria, the Netherlands) and Canada join forces in a unique consortium to prepare the ...
Read Project

 13

 FINISHED 
Every 30 seconds a person suffers an osteoporosis-related bone fracture in the EU, resulting in significant morbidity, mortality, and health-care costs estimated at €36billion annually. Current therapeutics target bone resorbing osteoclasts, but these are associated with severe side effects. Osteoporosis arises when mesenchymal stem cells (MSC) fail to produce sufficient numbers of bone forming os ...
Read Project

 2

 FINISHED 
Reason for the project: Reinforce and modernize libraries and improve the level of competencies and skills of library staff in HEI’s in Western Balkan countries. The level of competencies and skills of library staff is not of a high standard in the target PC's. Library staff need to be trained in modern library standards & practices. The main challenge they face is to transform themselves into mod ...
Read Project

 12

 FINISHED 
Reason for the project: Reinforce and modernize libraries and improve the level of competencies and skills of library staff in HEI’s in Armenia, Moldova and Belarus. The level of competencies and skills of library staff is not of a high standard in the target PC's. Library staff need to be trained in modern library standards & practices. The main challenge they face is to transform themselves into ...
Read Project

 13

 FINISHED 

Social Enterprise Development, Education and Training Tools

Start date: Oct 3, 2016, End date: Oct 2, 2018,

...he project will impact on the capacity of the social enterprise sector at organizational, local, regional, national and European levels. The project partnership (8 Nr organisations) is led by Glyndwr University, Wales and is both cross sectoral and pan European in its complexion as it includes a further / vocational education college (Ireland), four independent training / youth advisory agency (Po ...
Read Project

 8

 FINISHED 

CONNECT 2.0 - Intercultural Learning Network 4 Europe

Start date: Sep 1, 2015, End date: Aug 31, 2018,

Mobility measures of Erasmus+ enable young people in Europe to gain valuable and essential intercultural experiences for their personal and professional development. Whereas participants of non-formal youth exchanges (e.g. EVS) are provided with in-person pedagogical support, only few students who take part in the Erasmus program have the opportunity to attend instructed intercultural learning and ...
Read Project

 11

 FINISHED 

EUropean CERamic MATerials

Start date: Sep 1, 2015, End date: Aug 31, 2018,

The aim the European Ceramic Materials (EUCERMAT) project is to significantly contribute to changing the general opinion about ceramics materials in Europe. As a matter of fact, ceramic materials are too often simply associated to great diffusion materials mainly employed as building materials (covering plates factories, glasses for windows... etc.). This narrow and negative image is the main reas ...
Read Project

 13

 FINISHED 
...in the prior topics of EU such as supporting dual careers of athletes, standards and accreditation (Erasmus+ Programme Guide, 2014). This project will be carried out under the coordination of Uludag University and within the partnership of Limerick University-Ireland, Technicka Univerzita V Liberci- Czech Republic, Padova University-Italy, Sport Science Association-Turkiye and Bursa Physical Edut ...
Read Project

 7

 FINISHED 
What is Technical Communication (TC) and why is it important? For the safe and efficient use of products – whether devices, machines, software, entire production plants or service provider products – users require information. The manufacturers or providers of the products are obligated to make this information available across the entire product life cycle in a suitable media format. The creation ...
Read Project

 9

 FINISHED 

MIME - MOBILITY AND INCLUSION IN MULTILINGUAL EUROPE (MIME)

Start date: Mar 1, 2014, End date: Aug 31, 2018,

Using an innovative interdisciplinary approach, MIME will generate an organised body of policy-relevant propositions addressing the full range of questions raised in the call. Our aim is to identify the language policies and strategies that best combine “mobility” and “inclusion”.MIME emphasises complementarity between disciplines, and brings together researchers from sociolinguistics, political s ...
Read Project

 23

 FINISHED 
This is a project for higher education student and staff mobility between Programme Countries and Partner Countries. Please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Asset Centric Adaptive Protection (ACAP)

Start date: Nov 1, 2016, End date: Apr 30, 2018,

The proliferation of mobile and ubiquitous computing technology is radically changing the ways in which we live our lives: from interacting with friends & family, to how we produce & consume services and engage in business. However, this pervasiveness of technologies, and their increasingly seamless integration and inter-operation, are blurring the boundaries between systems. This poses significa ...
Read Project

 1

 FINISHED 

Thermally Integrated Smart Photonics Systems (TIPS)

Start date: Feb 1, 2015, End date: Jan 31, 2018,

The objective of this proposal is to develop and demonstrate a scalable, thermally-enabled 3D integrated optoelectronic platform that can meet the explosion in data traffic growth within ICT. The Thermally Integrated Smart Photonics Systems (TIPS) program will heterogeneously integrate micro-thermoelectric coolers (μTEC) and micro-fluidics (μFluidics) with optoelectronic devices (lasers, modulator ...
Read Project

 10

 FINISHED 

FIX the FIXING: Proactive quelling of sports events manipulation

Start date: Jan 1, 2016, End date: Dec 31, 2017,

Match fixing represents and ongoing threat to the integrity, reputation, and societal welfare dimension of sports. It is an illegal activity with an international dimension, and is directly linked to gambling and criminal networks exploiting unregulated gambling markets. Previous EU projects focused on awareness raising campaigns and suggested that match-fixing is a relatively unexplored research ...
Read Project

 9

 FINISHED 
The major bottleneck for plant biomass processing is fiber saccharification: the conversion of cell wall lignocellulosic biomass into fermentable sugars (en route to production of value-added chemicals like second generation biofuels). Some microbes enhance this step by using natural self-assembling proteinaceous nanocatalists known as cellulosomes. CellulosomePlus targets rational design of optim ...
Read Project

 9

 FINISHED 

Higher education student and staff mobility project

Start date: Jun 1, 2016, End date: Sep 30, 2017,

This is a higher education student and staff mobility project, please consult the website of the organisation to obtain additional details.
Read Project

 1

 FINISHED 

Adaptive Security and Privacy (ASAP)

Start date: Oct 1, 2012, End date: Sep 30, 2017,

"With the prevalence of mobile computing devices and the increasing availability of pervasive services, ubiquitous computing (Ubicomp) is a reality for many people. This reality is generating opportunities for people to interact socially in new and richer ways, and to work more effectively in a variety of new environments. More generally, Ubicomp infrastructures – controlled by software – will det ...
Read Project

 2

 FINISHED 
The proposed ITN BIOENERGY deals with the understanding of experimental limits and fundamental principles for exploiting and developing electro-conducting nanoarchitectures to assemble highly efficient bioelectrocatalytic structures as a basis for efficient and stable biofuel cells. Based on that fundamental understanding, the main technological objective of BIOENERGY is to develop efficient and s ...
Read Project

 13

 FINISHED 
The ReDVA project proposes to perform a joint industry-academia research programme to overcome the scientific and technical barriers to the understanding, development and adoption of technologies to combat the significant clinical problem of the failure of renal dialysis venous access. The partnership will capitalise on the exchange of complementary inter-disciplinary knowledge and expertise betwe ...
Read Project

 5

 FINISHED 

Inclusion Training in Intellectual Disability for Educators in Europe

Start date: Sep 1, 2014, End date: Aug 31, 2017,

...ly school leaving and improving adult qualification levels. The participants in this project will come from higher education and specialist agencies in six states: United Kingdom: Leeds Metropolitan University (lead partner), National Association for Special Educational Needs (the leading national education charity) Republic of Ireland: Limerick University, Profexcel (a private SME, a market lead ...
Read Project

 8