Search for European Projects

7 European Projects Found

Searched on 125080 European Projects

 FINISHED 
New concepts for high-temperature geothermal well technologies are strongly needed to accelerate the development of geothermal resources for power generation in Europe and worldwide in a cost effective and environmentally friendly way. The GeoWell project will address the major bottlenecks like high investment and maintenance costs by developing innovative materials and designs that are superior t ...
Read Project

 8

 FINISHED 
The current requirements of the Post Combustion CO2 Capture (PCC) technology are: a) Reducing the parasitic energy load, b) Effectively addressing corrosion, c) Faster absorption/stripping rates, d) Less viscosity and less use of water, e) Confronting the problem of solvent degradation and volatility. These problems pose stimulating challenges for the synthesis of new solvents, aided by detailed m ...
Read Project

 10

 FINISHED 
PANACEA aims at developing methods and tools for improved prediction and validation of the long-term behavior of sequestered CO2. The objectives are to: 1) Identify and quantify the factors responsible for the long-term stability of the stored CO2, thus requiring a clear understanding of the dynamics of the injected CO2, chemical interactions with the host rock, and the evolution in time of its pa ...
Read Project

 12

 FINISHED 

Research into Impacts and Safety in CO2 Storage (RISCS) (RISCS)

Start date: Jan 1, 2010, End date: Dec 31, 2013,

"Although significant leakage from CO2 storage sites is not expected, if it did occur there could be adverse environmental consequences, which are not well constrained. The objective of RISCS is to provide fundamental research on environmental impacts, necessary to underpin frameworks for the safe management of CO2 storage sites. To achieve this, RISCS will quantitatively assess environmental impa ...
Read Project

 23

 FINISHED 

CO2 Site Closure Assessment Research (CO2CARE)

Start date: Jan 1, 2011, End date: Dec 31, 2013,

CO2CARE aims to support the large scale demonstration of CCS technology by addressing the research requirements of CO2 storage site abandonment. It will deliver technologies and procedures for abandonment and post-closure safety, satisfying the regulatory requirements for transfer of responsibility. The project will focus on three key areas: well abandonment and long-term integrity; reservoir mana ...
Read Project

 23

 FINISHED 
The priority subject area for this multi-country project is a development of partnership with enterprises for partner Universities, including selection, promotion and commercialization of Universities technologies.The specific project objective is to create the innovation cross-universities network at Russian, Ukrainian, Belarusian and Azerbaijani partner Universities to establish an effective sys ...
Read Project

 13

 FINISHED 
Preamble The foundation of an academic ERASMUS network of HEI in Europe in the filed of career guidance degree and study programs can be seen as the implementation of the recommendations of the European Commission and the OECD made on the basis of their comprehensive studies carried out in the last eight years.» The planned ERASMUS network emphasises the unique wide-ranging scientific responsibili ...
Read Project

 39