Search for European Projects

27 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Advanced Low Flying Aircrafts Detection and Tracking (ALFA)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

The last decades witnessed the ever growing effectiveness of Europe-subsidized border protection projects like SIVE and SIVICC. As maritime smuggling from Morocco towards the European borders of Portugal and Spain was combatted more effectively, the criminal modus operandi changed drastically, approaching air routes with cheap and small planes. New drone technology opens opportunity to both manned ...
Read Project

 9

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
DRIVER starts from the experience that neither successful R&D nor strong end-user demand always lead to innovation in the Crisis Management (CM) domain. This is a problem since as societies become more complex, increasing scope and unpredictability of potential crises and faster dynamics of major incidents put increasingly stringent demands on CM. European CM capabilities already constitute a matu ...
Read Project

 38

 FINISHED 
MANGO targets to achieve extreme resource efficiency in future QoS-sensitive HPC through ambitious cross-boundary architecture exploration for performance/power/predictability (PPP) based on the definition of new-generation high-performance, power-efficient, heterogeneous architectures with native mechanisms for isolation and quality-of-service, and an innovative two-phase passive cooling system. ...
Read Project

 9

 FINISHED 

Extended Image Sensing Technologies (EXIST)

Start date: May 1, 2015, End date: Apr 30, 2018,

This project will research new technologies for CMOS image sensors that are needed in the next generation of several application domains.The image sensor research will focus on enhancing the capabilities of current imaging devices:• New design (architectures) and technology (e.g. 3D stacking) for better pixels (lower noise, higher dynamic range, new functionality within the pixel) and more pixels ...
Read Project

 17

 FINISHED 
Our proposal is based on the idea that real-time functional neuroimaging can be used to train patients to regulate their own brain activity via neurofeedback training and thus modulate the brain networks of mental disorder, restore function, improve symptoms and promote resilience. We have brought together the core groups that have been instrumental in the development of methods for real-time func ...
Read Project

 12

 FINISHED 

Training network on tRAcking in compleX sensor systems (TRAX)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

...ramme on Tracking in Complex Sensor Systems, covering interdisciplinary and intersectoral aspects in this newly emerging supra-disciplinary field. The TRAX consortium comprises two large companies (Thales Nederland B.V., Ericsson A.B.); two SMEs (Rinicom Limited, Xsens Technologies B.V.); a research institute ( Fraunhofer) and three universities (University of Lancaster, Linköping University and U ...
Read Project

 8

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

PREparing for the Domino effect in Crisis siTuations (PREDICT)

Start date: Apr 1, 2014, End date: Mar 31, 2017,

PREDICT provides a comprehensive solution for dealing with cascading effects in multi-sectoral crisis situations covering aspects of critical infrastructures. The PREDICT solution will be composed of the following three pillars: methodologies, models and software tools. Their integrated use will increase the awareness and understanding of cascading effects by crisis response organisations, enhance ...
Read Project

 13

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 

ATHENA

Start date: Dec 1, 2013, End date: Nov 30, 2016,

The ATHENA project brings together major user communities with world leading experts in crisis management and experts and technology developers of mobile and social media use and development. The goal of the ATHENA project is to deliver two major outputs that will enable and encourage users of new media to contribute to the security of citizens in crisis situations and for search and rescue actio ...
Read Project

 14

 FINISHED 
Description The objective of this research proposal is to bring time awareness and evolution into the design of System-of-Systems (SoS), to establish a sound conceptual model, a generic architectural framework and a design methodology including tools for prototyping, for the modeling, development and evolution of time-sensitive SoSes with po ...
Read Project

 7

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 

Advanced Cockpit for Reduction Of StreSs and workload (ACROSS)

Start date: Jan 1, 2013, End date: Jun 30, 2016,

Outstanding safety level of air transport is partly due to the two pilots standard. However situations where difficult flight conditions, system failures or cockpit crew incapacitation lead to peak workload conditions.The amount of information and actions to process may then exceed the crew capacity. Systems alleviating crew workload would improve safety.ACROSS Advanced Cockpit for Reduction of St ...
Read Project

 36

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 

Adaptive Cooperative Control in Urban (sub) Systems (ACCUS)

Start date: Jun 1, 2013, End date: Jan 31, 2016,

Urban systems like traffic, energy, and outdoor lighting are managed by self-contained embedded systems – though the managed processes are deeply interconnected. New applications and collective optimization require integration of these systems which represents a truly “systems of systems” integration problem: these urban systems evolve independently, have their own purpose and internal policies wh ...
Read Project

 28

 FINISHED 
Organized crime is becoming more diverse in its activities and methods including “greater levels of collaboration between criminal groups, greater mobility in and around the EU, a diversification of illicit activity, and a growing dependence on a dynamic infrastructure, anchored in key locations and facilitated by widespread use of the Internet” (the Director of Europol, in his foreword to the OCT ...
Read Project

 19

 FINISHED 

OPerational Trustworthiness Enabling Technologies (OPTET)

Start date: Nov 1, 2012, End date: Oct 31, 2015,

The OPTET project plans through a multi-disciplinary and integrated approach to identify and address the drivers of trust and confidence also fight against its erosion (especially true on the Internet or Cloud). Focus of this project is on socio-technical systems connected to the Internet. The resulting technologies enabling trustworthiness would be verified on two distinct existing execution plat ...
Read Project

 10

 FINISHED 
"The goal of BRIDGE is to increase safety of citizens by developing technical and organisational solutions that significantly improve crisis and emergency management. The key to this is to ensure interoperability, harmonization and cooperation among stakeholders on the technical and organisational level.Therefor BRIDGE delivers:- Resilient ad-hoc network infrastructures, focussing on the requireme ...
Read Project

 15

 FINISHED 

Ultra Wide Context Aware Imaging (PANORAMA)

Start date: Jan 1, 2012, End date: Dec 1, 2014,

In many application domains all over the world there is a trend from “single-view imaging” towards “multi-view imaging”. Some examples are the introduction of 3D/4D imaging in Healthcare, High Definition TV and beyond in Broadcasting, multiple connected Surveillance Cameras for monitoring a scene. These applications have in common that they all involve an explosive growth in the generation of imag ...
Read Project

 17

 FINISHED 
...raining programme in this field is available in Europe while well trained researchers and engineers are scarce. The MC IMPULSE consortium unites highly complementary partners from industry (including Thales, Saab and 2 SME’s) universities and a research institute, guaranteeing an interdisciplinary research and training programme. Within MC IMPULSE 13 early stage researchers and two experienced res ...
Read Project

 8

 FINISHED 
"The overall objective of this project is to combine forces of Europe’s leading industrial (Thales Nederland B.V., Space Application Services N.V., IdMind - Engenharia de Sistemas Lda) and academic organizations (Universities of Sheffield, Amsterdam and Örebro) in the field of ‘Disaster Management’, in order to deliver, through a strategic and intersectoral exchange of researchers, an intelligent ...
Read Project

 6

 FINISHED 
"The overall objective of project is to contribute to improve the security in the airport area and, thus, on board of departing aircrafts by: • detecting and identifying, without interfering neither with the normal passengers flows, nor with the normal airport operations, the presence of hazardous materials or tools, concealed (under clothes or inside bags) by ill-intentioned people circulating in ...
Read Project

 11

 FINISHED 

Guardian Angels for a Smarter Life (Guardian Angels)

Start date: May 1, 2011, End date: Apr 30, 2012,

Guardian Angels (GA) are future zero-power, intelligent, autonomous systems-of-systems featuring sensing, computation, and communication beyond human aptitudes. GA will assist humans from their infancy to old age in complex life situations and environments. Zero-power reflects system-of-systems ability to scavenge energy in dynamic environments by disruptive harvesting techniques. The project prep ...
Read Project

 34

 FINISHED 
The resulting methods and tools will support environmental management in industrial settings. In particular, the resulting system will support seamless and efficient integration of (i) robust and efficient gas monitoring systems and (ii) advanced decision support/planning systems which facilitate rapid, high-quality decision making based on rich domain expertise and large quantities of relevant in ...
Read Project

 10

 FINISHED 

Cutting edge Reconfigurable ICs for Stream Processing (CRISP)

Start date: Jan 1, 2008, End date: Apr 30, 2011,

...submicron chips are improved using new techniques for static and dynamic detection and localization of faults and (dynamically) circumventing faulty hardware.The partners (Recore, Uni. Twente, Atmel, Thales, Tampere Uni. and NXP) in the small and decisive CRISP consortium complement each other and collaborated successfully in the past. Due to a clear common vision, a full description of work is al ...
Read Project

 6

 FINISHED 
Description Combining software services is difficult. ALIVE applies techniques from organization theory to software-based services, to make those services easy to assemble and use in complex scenarios. Software-based services can help solving a large variety of problems, but combining them in non- ...
Read Project

 8