Search for European Projects

25 European Projects Found

Searched on 125080 European Projects

 FINISHED 
ICT is embedded and pervasive into our daily lives. The notion of Cyber Physical Systems (CPS) has emerged: embedded computational collaborating devices, capable of controlling physical elements and responding to humans.The Cross-layer modEl-based fRamework for multi-oBjective dEsign of Reconfigurable systems in unceRtain hybRid envirOnments (CERBERO) project aims at developing a design environmen ...
Read Project

 12

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Read Project

 33

 FINISHED 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Read Project

 32

 FINISHED 

Integrated 3D Sensors suite (I3DS)

Start date: Nov 1, 2016, End date: Jan 31, 2019,

The I3DS platform (Integrated 3D sensors) is a generic and modular system answering the needs of near-future space exploration missions in terms of exteroceptive and proprioceptive sensors with integrated pre-processing and data concentration functions. It consists in state-of-the art sensors and illumination devices integrated in a coherent architecture as inter-changeable building blocks and tar ...
Read Project

 10

 FINISHED 
VEGAS proposes to address the key challenge of European non-dependence and competitivness regarding rad-hard FPGA for space applications. VEGAS will evaluate (following ESCC rules) and validate the first rad-hard FPGA in 65nm to directly compete with the US offering and reach TRL 7. The VEGAS project sets clear and measurable main objectives to reach a TRL 7 from TRL 5 (end of BRAVE project) as fo ...
Read Project

 11

 FINISHED 

SPACE ETHERNET PHYSICAL LAYER TRANSCEIVER (SEPHY)

Start date: May 1, 2015, End date: Jul 31, 2018,

...t PHYs and Ethernet standards (Universidad de Nebrija). Finally, the electronic technology and manufacturing capabilities are also covered (ATMEL) as are the space system perspective and testing (Thales Alenia Space Spain).
Read Project

 6

 FINISHED 
The aim of SANSA project is to boost the performance of mobile wireless backhaul networks in terms of capacity and resilience while assuring an efficient use of the spectrum. Recently, a global mobile traffic increase of 11-fold between 2013 and 2018 was predicted, so novel solutions are required to avoid backhaul becoming the bottle neck of future mobile networks. The solution envisaged in SANSA ...
Read Project

 8

 FINISHED 

Operational Network of Individual Observation Nodes (ONION)

Start date: Jan 1, 2016, End date: Dec 31, 2017,

Two trends have recently emerged in space systems and could even further strengthen in the future: small satellites, with the development of key modularisation and miniaturisation technologies, and the deployment of constellations and distributed networks of satellites. It is of primordial importance for Europe to properly analyse those trends and determine whether or not they could provide a comp ...
Read Project

 8

 FINISHED 

5G Enablers for Network and System Security and Resilience (5G-ENSURE)

Start date: Nov 1, 2015, End date: Oct 31, 2017,

5G-ENSURE will define and deliver a 5G Security Architecture, shared and agreed by the various 5G stakeholders. It will specify, develop and release an initial set of useful and usable security enablers for 5G. These enablers will be selected for their relevance in addressing some of the foremost security concerns in order to generate the trust and confidence necessary for 5G to be widely adopted ...
Read Project

 16

 FINISHED 

Global ATM security management (GAMMA)

Start date: Sep 1, 2013, End date: Aug 31, 2017,

The GAMMA project stems from the recognition that while the SESAR initiative is effectively addressing some security issues in the new global ATM scenarios, there is a need to extend this scope to ensure a comprehensive assessment of the full set of security threats and vulnerabilities affecting ATM, considered as a system of systems and covering operational as well as technological aspects. In ad ...
Read Project

 23

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 
"PROGRESS will focus on improving the security and resilience of Global Navigation Satellite Systems (GNSS) and its results will also be applicable to earth observation infrastructure and assets. At the start of the project a generic GNSS system will be designed and its associated augmentation system will be assessed with regards to vulnerability from selected attack threat risk scenarios. PROGRES ...
Read Project

 11

 FINISHED 

Dependable Embedded Wireless Infrastructure (DEWI)

Start date: Mar 1, 2014, End date: Feb 28, 2017,

DEWI (dependable embedded wireless infrastructure) envisions to significantly foster Europe’s leading position in embedded wireless systems and smart (mobile) environments such as vehicles, railway cars, airplanes and buildings. These environments comprise wireless sensor networks and wireless applications for citizens and professional users. Therefore the consortium introduces the concept of a “s ...
Read Project

 61

 FINISHED 
The vision behind the PHASER project is to provide the European Space Industry with a new Analog to Digital conversion system that allows the direct digitalization of typical RF signals from K up to Ka band. PHASER will develop a space-grade, high speed digitizer capable of direct RF-sampling up to Ka band signals, exhibiting an improvement of more than two order of magnitude in the digitizer freq ...
Read Project

 5

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 
...e stakeholders of the European Space sector.Therefore, the GOTOFLY! project gathers a teams of 5 enterprises of the European Space industry coming from 4 different countries: - 3 national branches of Thales Alenia Space (TAS) in France, Italy and Spain. TAS is a major satellites manufacturer and a leading player in the field of the Space R&D. It knows accurately the constraints for launching vario ...
Read Project

 5

 FINISHED 

Broadband Access via Integrated Terrestrial & Satellite Systems (BATS)

Start date: Oct 1, 2012, End date: Dec 31, 2015,

BATS addresses the integrated delivery of BroadBand (BB) future Internet services for European coverage according to the EC Digital Agenda objective to reliably deliver >30Mbps to 100% of European households by 2020. In order to accommodate the 'unserved' and 'underserved' areas of Europe, an ultra high speed satellite system is researched that provides order of magnitude cost/bit reductions and s ...
Read Project

 17

 FINISHED 
The AIRBEAM project proposes a situation awareness toolbox for the management of crisis over wide area taking benefit of an optimised set of aerial (unmanned) platforms, including satellites.The number of unmanned air- and space-borne platform available and their associated sensors present a new set of challenges to end users involved in the effective management of emergencies and actions of law e ...
Read Project

 24

 FINISHED 
Modern advanced products of today use embedded computing systems with exacting requirements on execution speed, timeliness, and power consumption. It is a grand challenge to guarantee these requirements across product families and in the face of rapid technological evolution, as current development practices cannot manage performance requirements the same way they manage functional requirements.Ev ...
Read Project

 20

 FINISHED 
European industry has a great potential to achieve a leading position in the growing global market of safety-relevant embedded systems, provided it is able to devise efficient and industrial-strength methods and processes for their development and certification.nSafeCer targets increased efficiency and reduced time-to-market by composable safety certification of safety-relevant embedded systems. A ...
Read Project

 31

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 

Sea Border Surveillance (SeaBILLA)

Start date: Jun 1, 2010, End date: Feb 28, 2014,

The SeaBILLA proposal aims to 1) define the architecture for cost-effective European Sea Border Surveillance systems, integrating space, land, sea and air assets, including legacy systems; 2) apply advanced technological solutions to increase performances of surveillance functions; 3) develop and demonstrate significant improvements in detection, tracking, identification and automated behaviour an ...
Read Project

 29

 FINISHED 

Latin American Health Care Network (MedNet)

Start date: Jan 1, 2008, End date: May 31, 2011,

Access to medical care is sometimes very difficult to be reached from people living in rural and underserved areas. This problem is very well known in rural areas in Latin America. Citizens have no access to health care. They have to travel hundred of kilometers to receive a medical diagnosis.Within the project, we will develop a medical network that addresses the problems of providing health care ...
Read Project

 12