Search for European Projects

13 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The overall objective of BRESAER project is to design, develop and demonstrate an innovative, cost-effective, adaptable and industrialized envelope system for buildings refurbishment including combined active and passive pre-fabricated solutions integrated in a versatile lightweight structural mesh:‒ Dynamic window with automatic and controlled air-tightness and insulated solar blinds complementin ...
Read Project

 17

 FINISHED 
"SINFONIA utilizes EU funds to bolster public/private resources and provide European added value to already committed district refurbishment master plans of two middle sized European cities (Bolzano, Italy and Innsbruck, Austria), the targeted performances of which combine three key features thanks to industry involvement: i) unique cooperation between the cities belonging to the same climate zone ...
Read Project

 25

 FINISHED 
Present approaches to increasing resource efficiency in manufacturing companies are mainly focused on single process optimisation. A wider and integrated optimisation is assumed to have significantly higher savings potential.In fact, a pilot study has been performed by Greenovate!Europe, showing resource saving potentials of 70%Such a strategy should include optimisation across the interfaces betw ...
Read Project

 16

 FINISHED 
"Power system reliability management means to take decisions under increasing uncertainty (for instance, related to renewable generation). It aims to maintain power system performance at a desired level, while minimizing the socio-economic costs of keeping the power system at that performance level. Seven TSOs (Belgium, Bulgaria, Czech Republic, Denmark, France, Iceland, Norway), together with ele ...
Read Project

 20

 FINISHED 
ProBIO is a support action directly benefiting consortia of FP7 KBBE and H2020 bioeconomy. The overall objective is two-fold: 1. To support the flow of knowledge-based bioeconomy project results from research to market, as well as back to R&I.2. To foster the networking and knowledge exchange between different European bioeconomy initiatives under H2020 and FP7 and the most important players in ...
Read Project

 9

 FINISHED 
6 Transmission System Operators (Belgium, France, Greece, Norway, Portugal and United Kingdom) and CORESO, a TSO coordination centre, together with 13 RTD performers propose a 4 year R&D project to develop and to validate an open interoperable toolbox which will bring support, by 2015, to future operations of the pan-European electricity transmission network, thus favouring increased coordination/ ...
Read Project

 23

 FINISHED 
Eight Transmission System Operators (BE, CZ, FR, DE, IT, PT, CH, PL) and ENTSO-E, together with 4 associations of technology manufacturers, and 16 RTD performers propose a 3-year R&D project to develop and to apply a methodology for the long-term development of the Pan-European transmission network. The project aims at delivering a top-down methodology to support the planning from 2020 to 2050. F ...
Read Project

 28

 FINISHED 
The present project provides the necessary support to the EEGI Team gathering, in a structured and organised way, a team of top level players (research centres, SMEs, universities, in close coordination with ENTSO-e and EDSO for SG) to design in a coordinated way with both TSOs and DSOs a set of accompanying activities to make sure that the EEGI will pass through the critical 2012-2014 period (pre ...
Read Project

 13

 FINISHED 
The three year coordinating action THINK will improve the knowledge support to policy making by the European Commission in the context of the Strategic Energy Technology Plan. THINK is organized around a multidisciplinary group of 24 experts covering five dimensions of energy policy: science and technology, market and network economics, regulation, law, and policy implementation. The Think Tank wi ...
Read Project

 18

 FINISHED 
A new polygeneration application with renewable energy sources will be planned and demonstrated for the fishery industry. The distributed energy system utilizes cleaning waste of a fish processing plant to produce biodiesel. The biodiesel is used to produce the locally needed cooling/freezing and heating energy. In addition, a power surplus is generated for the electricity network or local industr ...
Read Project

 10

 FINISHED 
Five Transmission System Operators (Belgium, France, Germany and Spain) together with seven RTD performers propose a 3 year research and demonstration project to compare pros and cons of new market designs aiming at the integration of massive intermittent energy sources dispersed in several regional power markets. Under the technical coordination of RTE, they will implement a novel network/system/ ...
Read Project

 15

 FINISHED 
ProNano aims at validating new practices to remove the major barriers that prevent results out of scientific research projects on nanotechnology field from reaching market applications: market barriers, technology barriers, financial barriers, managerial barriers. Managed by experienced innovation consultant firms and venture capitalist from several European countries, and involving European and n ...
Read Project

 11

 FINISHED 
The European electricity system is facing major challenges to implement a strategy for a reliable, competitive and sustainable electricity supply. The development and the renewal of the transmission infrastructure are central and recognised issues in this strategy. Indeed the transmission system is a complex and strongly interconnected infrastructure that offers a wide range of benefits like relia ...
Read Project

 20