Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"HDHL-INTIMIC (INtesTInal MICrobiomics) is a proposal for an ERA-NET Cofund in the field of food, nutrition and health to support the Joint Programming Initiative "A Healthy Diet for a Healthy Life" (JPI HDHL).There is a high burden of non-communicable diseases due to unhealthy diet and lifestyle patterns. The intestine and in particular the intestinal microbiota have an influence on metabolic pr ...
Read Project

 14

 FINISHED 
Reliability and radiation damage issues have a long and important history in the domain of satellites and space missions. Qualification standards were established and expertise was built up in space agencies (ESA), supporting institutes and organizations (CNES, DLR, etc.) as well as universities and specialized companies. During recent years, radiation concerns are gaining attention also in aviati ...
Read Project

 9

 FINISHED 

The European network for observing our changing planet (ERA-PLANET)

Start date: Feb 1, 2016, End date: Jan 31, 2021,

In the last decade a significant number of projects and programmes in different domains of environmental monitoring and Earth observation have generated a substantial amount of data and knowledge on different aspects related to environmental quality and sustainability. Big data generated by in-situ or satellite platforms are being collected and archived with a plethora of systems and instruments m ...
Read Project

 38

 FINISHED 

Plasma Antenna Technologies (PATH)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

PATH is intended to promote a collaborative researches focused in the development of high density plasma sources implemented with the Exchange of staff personnel between the partners of the network. The research will also address transfer of knowledge and training of the researchers in the specific field of plasma sources and its applications in the telecommunication sector.High density plasma sou ...
Read Project

 7

 FINISHED 

Advanced Radio Astronomy in Europe (RadioNet)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

RadioNet is a consortium of 28 institutions in Europe, Republic of Korea and South Africa, integrating at European level world-class infrastructures for research in radio astronomy. These include radio telescopes, telescope arrays, data archives and the globally operating European Network for Very Long Baseline Interferometry (EVN). RadioNet is de facto widely regarded to represent the interests o ...
Read Project

 29

 FINISHED 

Laser Lightning Rod (LLR)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

Controlling lightning is a long time dream of mankind. The goal of the present project is to investigate and develop a new type of lightning protection based on the use of upward lightning discharges initiated through a high repetition rate multi terawatt laser. The feasibility of the novel technique and the project’s prospect of success are based on recent research providing new insights into the ...
Read Project

 9

 FINISHED 

Lubricant impregnated slippery surfaces (LubISS)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

LubISS, Lubricant Impregnated Slippery Surfaces, is the first European Training Network with the main objectives of designing, characterizing, and modelling low adhesive easy-to-clean surfaces for anti-icing and anti-fouling. In a coordinated effort among 9 world-class academic institutions and industrial partners from 6 European countries (Finland, France, Germany, Great Britain, Netherlands, Swi ...
Read Project

 9

 FINISHED 
...ent basis for economic competitiveness.The HEMPT-NG consortium is led by TES (Thales Electronic System GmbH), subsidiary of the Thales Group, worldwide leader in the development and production of space products, responsible for thruster equipment and integrated EPS. European industrial partners are: Thales, OHB, Airbus and Aerospazio, who bring their expertise in spacecraft mission studies, equipm ...
Read Project

 10

 FINISHED 
Radio signals are core to space systems and services; they are the backbone of satellite broadcasting & communications and further represent the primary underpinning technology of the nearly ubiquitous space-based radio navigation services as well as a large number of Earth observation instruments. Radio technologies are therefore central in defining the investment return for a wide range of missi ...
Read Project

 5

 FINISHED 
Recent sub-millimeter instruments on the Herschel Space Observatory, operational from 2009-2013, have discovered thousands of sub-millimeter galaxies, whose combined emission forms the cosmic infrared background. A major challenge is to measure their distance, or age, by determining their redshifts, which also has to be based on the sub-millimeter signals (because they do not have an optical count ...
Read Project

 1

 FINISHED 

Gridded Ion Engine Standardised Electric Propulsion Platforms (GIESEPP)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

...tive activity to develop, build and test to TRL5 the first European Plug and Play Gridded Ion Engine Standardised Electric Propulsion Platform (GIESEPP) to operate Airbus Safran Launchers and QinetiQ Space ion engines. These are the only European ion engines in the 200-700W (LEO) and 5kW (GEO) domains that are space-proven, and the consortium’s intention will be to improve European competitiveness ...
Read Project

 8

 FINISHED 
... technological applications are unique, as it is a key component in producing Solid Oxide Fuel Cells (Scandia-Stabilized-Zirconia solid electrolyte layer) or high strength Aluminum alloys used in aerospace and 3D printing applications (SCALMALLOY®). Yet Scandium supply is limited due to its scarcity and the high cost of its production, which currently takes place in Asia and Russia. Europe has no ...
Read Project

 20

 FINISHED 

Do intermediate-mass black holes exist? (imbh)

Start date: Sep 1, 2015, End date: Aug 31, 2020,

With this proposed project I will determine whether intermediate-mass black holes (IMBHs) exist. I propose to use ESA's new Gaia mission, the rich Hubble Space Telescope data archive, and state-of-the-art techniques to investigate systems predicted to exist but not yet found hitherto, such as recoiled hyper-compact stellar systems, red-supergiant mass donors to ultra-luminous X-ray sources, and wh ...
Read Project

 1

 FINISHED 
...uropean non-dependence under the line “High speed DAC-ADC based on European Technology” – analogue-to-digital and digital-to-analogue data converters. E2V designs, manufactures, supplies to the space market these essential components, but faces keen competition from US providers. To preserve know-how and production of such competitive components in Europe and to underscore its efforts for non-depe ...
Read Project

 4

 FINISHED 
There is an increasing demand for advanced materials with temperature capability in highly corrosive environments for aerospace. Rocket nozzles of solid/hybrid rocket motors must survive harsh thermochemical and mechanical environments produced by high performance solid propellants (2700-3500°C). Thermal protection systems (TPS) for space vehicles flying at Mach 7 must withstand projected service ...
Read Project

 12

 FINISHED 

Next Generation GEOSS for Innovation Business (NextGEOSS)

Start date: Dec 1, 2016, End date: May 31, 2020,

The NextGEOSS project will implement a federated data hub for access and exploitation of Earth Observation data, including user-friendly tools for data mining, discovery, access and exploitation. This data hub will be supported by a strong commitment to the engagement of Earth Observation and related communities, with the view of supporting the creation of innovative and business oriented applicat ...
Read Project

 27

 FINISHED 

Consortium for Hall Effect Orbital Propulsion System (CHEOPS)

Start date: Nov 1, 2016, End date: Apr 30, 2020,

CHEOPS proposes to develop three different Hall Effect Thruster electric propulsion systems: a dual mode EPS for GEO applications, a low power for LEO applications and a >20 kW high thrust EPS for exploration applications. Each of these will be developed according to market needs and drivers applying incremental technology changes to existing EPS products. The development approach will follow the ...
Read Project

 14

 FINISHED 

Shared Cities: Creative Momentum

Start date: Jun 1, 2016, End date: Feb 28, 2020,

Shared Cities: Creative Momentum is a Central European consortium of cultural actors whose interest intersects in sharing, circulating, and exchanging the best practices in self-initiated, participatory and transdisciplinary architecture and urbanism collaborations.Over the course of four years, the platform of eleven partners from six countries, active in architecture, urban design, art and cultu ...
Read Project

 11

 FINISHED 

MagnetIc NOzzle thruster with elecTron cyclOtron Resonance (MINOTOR)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

...t a factor of 2 is expected, and reliability compared to mature technologies. It is also scalable and can potentially be considered for all electric propulsion applications, from microsatellites to space tugs. Although the first results obtained with ECRA have been encouraging, the complexity of the physics at play has been an obstacle for the understanding and development of the technology. Thus ...
Read Project

 7

 FINISHED 

Energy for Smart Objects (EnSO)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

The goal of EnSO is to develop and consolidate a unique European ecosystem in the field of autonomous micro energy sources (AMES) supporting Electronic European industry to develop innovative products, in particular in IoT markets. In summary, EnSO multi-KET objectives are:• Objective 1: demonstrate the competitiveness of EnSO energy solutions of the targeted Smart Society, Smart Health, and Smart ...
Read Project

 36

 FINISHED 
ICT is embedded and pervasive into our daily lives. The notion of Cyber Physical Systems (CPS) has emerged: embedded computational collaborating devices, capable of controlling physical elements and responding to humans.The Cross-layer modEl-based fRamework for multi-oBjective dEsign of Reconfigurable systems in unceRtain hybRid envirOnments (CERBERO) project aims at developing a design environmen ...
Read Project

 12

 FINISHED 
DIANA is aimed at co-designing and openly demonstrating a commercial service platform that will empower water managers and authorities to optimise the identification and inspection of non-authorised water abstractions for irrigation as well as improve their water management policies and practices, especially in extreme conditions such as drought. DIANA will leverage EO data provided by Copernicus ...
Read Project

 9

 FINISHED 
...an 28nm FDSOI technology with multi-core ARM processors for real-time applications, eFPGA for flexibility and key European IPs, enabling faster and cost-efficient development of products for multiple space application domains. The performance is expected to be 20 to 40 times the performance of the existing SoC for space and more than 2 times the performance of the future quad core LEON4 chip. This ...
Read Project

 7

 FINISHED 
Effective EU support to a large external crisis requires new approaches. In response to this challenge and to identified user and market needs from previous projects, Reaching Out proposes an innovative multi-disciplinary approach that will optimize the efforts, address a wide spectrum of users and maximize market innovation success.This approach results in five main objectives: to1. Develop a Col ...
Read Project

 29

 FINISHED 

Continuous Observation of Embedded Multicore Systems (COEMS)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The ability to observe the internals of an execution of a computer-based system is a fundamental requirement for ultimately ensuring correctness and safe behaviour. Within COEMS (Continuous Observation of Embedded Multicore Systems) a novel observer platform with supporting verification methods for software systems is created. COEMS tackles the issues of detection and identification of non-determi ...
Read Project

 6

 FINISHED 
SARAH is concerned with establishing novel holistic, simulation-based approaches to the analysis of aircraft ditching. It is build up from a consortium of experts from OEM industries, experienced suppliers of simulation technologies, established research institutions and representatives of the certification authorities. Results of SARAH are expected to support a performance-based regulation and ce ...
Read Project

 12

 FINISHED 
In the aerospace industry very high quality standards have to be met. For the manufacturing of carbon fibre parts this is currently solved through extended end-of-line inspection in combination with re-work processes to deal with defective parts. Also, in-situ visual inspection is used for quality control, which is currently causing huge productivity losses (30%-50%) during lay-up and has become a ...
Read Project

 7

 FINISHED 
“AdMoRe: Empowered decision-making in simulation-based engineering: Advanced Model Reduction for real-time, inverse and optimization in industrial problems” aims at providing in-depth training of Early Stage Researches (ESRs) in the development and application of state-of-the-art computational models and numerical methods to solve cutting-edge engineering problems. The main driving factors of all ...
Read Project

 7

 FINISHED 

Electric Propulsion Innovation and Competitiveness (EPIC)

Start date: Oct 1, 2014, End date: Sep 30, 2019,

EPIC proposes a Programme Support Activity which will produce a clear integrated roadmap & masterplan for its implementation through a Strategic Research Cluster (SRC) on In-space Electrical Propulsion & Station-Keeping.EPIC plans to do a survey of the current worldwide Electric Propulsion (& related) technologies & their TRL. A collection of requirements from all stakeholders will be done, also a ...
Read Project

 9

 FINISHED 

HUman MANufacturing (HUMAN)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

...ysical, conceptual, methodological, technological, and knowledge-based tools. 3 use case companies from the Furniture Manufacturing (ROYO Group), Automation Manufacturing (COMAU), & Defence & Aerospace (AIRBUS) sectors are involved. Proposed advances offered by HUMAN solutions will remove the barriers for:adaptability and flexibility of humans to continuously changing workplaces;alignment of new a ...
Read Project

 12

 FINISHED 
...g “Through hardships to the stars”) aims at developing an integrated master plan (a.k.a. roadmap) of activities and associated activity descriptions, for a Strategic Research Cluster (SRC) in Space Robotics Technology. The roadmap will be implemented within a Strategic Research Cluster (SRC) through operational grants, which will be recommended by PERASPERA and issued by the European Commission. P ...
Read Project

 6

 FINISHED 

Decentralised Agile Coordination Across Supply Chains (DIGICOR)

Start date: Oct 1, 2016, End date: Sep 30, 2019,

European manufacturing competes in a global knowledge-driven economy, and thus increasingly seeks competitive advantage through quality, agility and personalisation based on latest advances in IT. Increasing utilisation of IT in mission-critical elements of the production brings opportunities for consistency, transparency and flexibility, bringing the “lot size of 1” closer to reality even for mas ...
Read Project

 11

 FINISHED 
Today, industrial markets demand highly added value products offering new features at a low-cost. To this extent, technologies to modify surfaces instead of creating composites or applying coatings on surfaces can offer new industrial opportunities. Current state of the art identifies short pulsed(SP)/ultra-short pulsed(USP) laser-material processing as a promising technology for structuring surfa ...
Read Project

 10

 FINISHED 
...rotection and saving lives.ANYWHERE proposes to implement a Pan-European multi-hazard platform providing a better identification of the expected weather-induced impacts and their location in time and space before they occur. This platform will support a faster analysis and anticipation of risks prior the event occurrence, an improved coordination of emergency reactions in the field and help to rai ...
Read Project

 32

 FINISHED 

EUROPLANET 2020 Research Infrastructure (EPN2020-RI)

Start date: Sep 1, 2015, End date: Aug 31, 2019,

...y providing the underpinning facilities that European planetary scientists need to conduct their research, EPN2020-RI will create cooperation and effective synergies between its different components: space exploration, ground-based observations, laboratory and field experiments, numerical modelling, and technology.EPN2020-RI builds on the foundations of successful FP6 and FP7 Europlanet programmes ...
Read Project

 35

 FINISHED 

Rf Engineered substrates to FostER fEm performaNCE (REFERENCE)

Start date: Dec 1, 2015, End date: May 31, 2019,

The REFERENCE project aims to leverage a European leading edge Radio Frequency (RF) ecosystem based on RF Silicon On Insulator (SOI) disruptive technology, perceived as the most promising to address performance, cost and integration needs for RF Front End Modules (FEMs)s.The project targets to develop over the next 3 years, innovative solutions from material, engineered substrates, process, design ...
Read Project

 18

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
The EU has set the stage to empower semiconductor manufacturing in Europe being one of the key drivers for innovation and employment and creator for answers to the challenges of the modern society. Aim of IoSense is to boost the European competitiveness of ECS industries by increasing the pilot production capacity and improving Time-to-Market for innovative microelectronics, accomplished by establ ...
Read Project

 33

 FINISHED 
Composites are important materials used in aircrafts due to their excellent mechanical properties combined with relatively low weight enabling the reduction of fuel consumption. Expensive carbon fibre reinforced plastics (CFRP) are used in fuselage and wing structures and increasingly replace classic metals. Glass fibre reinforced plastics (GFRP) are mainly used for the interior panels. All these ...
Read Project

 9

 FINISHED 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Read Project

 32