Search for European Projects

14 European Projects Found

Searched on 125080 European Projects

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 
...osed systems and lower market entry barriers for developers.The BIG IoT consortium is well suited to reach the outlined goals, as it comprises all roles of an IoT ecosystem: resource providers (e.g., SIEMENS, SEAT), service and application developers (e.g., VODAFONE, VMZ), marketplace providers (e.g., ATOS), platform providers (e.g., BOSCH, CSI, ECONAIS), as well as end users connected through the ...
Read Project

 14

 FINISHED 
The project SENSIBLE addresses the call LCE-08-2014 by integrating electro-chemical, electro-mechanical and thermal storage technologies as well micro-generation (CHP, heat pumps) and renewable energy sources (PV) into power and energy networks as well as homes and buildings. The benefits of storage integration will be demonstrated with three demonstrators in Portugal, UK and Germany. Évora (Portu ...
Read Project

 16

 FINISHED 
Embedded systems are the key innovation driver to improve almost all mechatronic products with cheaper and even new functionalities. Furthermore, they strongly support today's information society as inter-system communication enabler.Consequently boundaries of application domains are alleviated and ad-hoc connections and interoperability play an increasing role. At the same time, multi-core and ma ...
Read Project

 101

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 

Future Internet Social and Technological Alignment Research (FI-STAR)

Start date: Apr 1, 2013, End date: Sep 30, 2015,

FI-STAR will establish early trials in the Health Care domain building on Future Internet (FI) technology leveraging on the outcomes of FI-PPP Phase 1. It will become self-sufficient after the end of the project and will continue on a sustainable business model by several partners. In order to meet the requirements of a global Health industry FI-STAR will use a fundamentally different, "reverse" c ...
Read Project

 44

 FINISHED 

FI-WARE: Future Internet Core Platform (FI-WARE)

Start date: May 1, 2011, End date: Dec 31, 2014,

The goal of the FI-WARE project is to advance the global competitiveness of the EU economy by introducing an innovative infrastructure for cost-effective creation and delivery of services, providing high QoS and security guarantees. FI-WARE is designed to meet the demands of key market stakeholders across many different sectors, e.g., healthcare, telecommunications, and environmental services. FI- ...
Read Project

 92

 FINISHED 

Nanoelectronics for Mobile AAL Systems (MAS)

Start date: Apr 1, 2010, End date: Mar 1, 2013,

The ENIAC JU project MAS is developing nanoelectronics components for applications in the field of health and wellness, and to create a development platform for the design of complete flexible, robust and safe mobile ambient-assisted-living systems. The project covers remote patient supervision using multi- parameter biosensors and telecommunications networks to improve the quality of the clinical ...
Read Project

 30

 FINISHED 

Transformative, Adaptive, Responsive and enGaging EnvironmenT (TARGET)

Start date: Jan 1, 2009, End date: Oct 31, 2012,

There is a need to reduce the knowledge worker "time-to-competence". The main aim is to develop a new genre of TEL environment that supports rapid competence development within the domains of innovation and project management.The TARGET environment consists of a learning process supported by the TARGET platform, consisting of a main core of a serious game. Here, the learner is presented with compl ...
Read Project

 22

 FINISHED 
The HAPTIMAP project will deeply embed accessibility into digital mainstream maps and mobile location-based services. Our strategy is twofold: firstly to develop tools that make it easier for developers to add adaptable multimodal components (designed to improve accessibility) to their applications; and secondly, to raise the awareness of these issues via new guidelines and to suggest extensions t ...
Read Project

 16

 FINISHED 
The project "Solution engineering and Services for Measuring, Monitoring, and Management of Organizations' Environmental Performance Indicators" (OEPI) is about the design and development of a software solution resulting in a Single Space of accessible Environmental Performance Indicators (EPIs) that are grounded in a semantic standardization concept. The standard for EPIs and the suite of tools c ...
Read Project

 9

 FINISHED 

Advanced Radio Interface Technologies for 4G Systems (ARTIST4G)

Start date: Jan 1, 2010, End date: Jun 30, 2012,

The first 3GPP Long Term Evolution standard version is complete and ready to be deployed. Although it increases peak data rate and spectral efficiency compared to legacy techniques, cell-edge and average user throughputs are still significantly lower than the peak rates. In the LTE-Advanced Study Item, ways to extend LTE are being explored. However, some of the considered techniques are complex an ...
Read Project

 18

 FINISHED 

ASSET – Aeronautic Study on Seamless Transport (ASSET)

Start date: Jun 1, 2008, End date: Nov 30, 2011,

"Airport ground processes still conceal a considerable potential for improvement of time efficiency. Recent studies from Eurocontrol Performance Review Commission prove that insufficient punctuality in air transport results mainly from variance in off-block times. This leads to poor predictability and sizeable inefficiencies throughout the whole air transport system. Aim of proposed project is to ...
Read Project

 15

 FINISHED 

Integrated Airport Apron Safety Fleet Management (AAS)

Start date: May 1, 2008, End date: Apr 30, 2011,

One of the main challenges in the apron area is that due to many different companies operating on an airport apron, each company brings in the vehicles and equipment it requires to sustain operation. This causes high levels of congestion in ramp areas, which increases the accident rate and the chances of vehicles and equipment being misused. By gaining telematic data on the running times of the va ...
Read Project

 14