Search for European Projects

1 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The need for higher speed is a never ceasing requirement for broadband access and requirement of 1 Gbps is expected around 2016. The copper lines are expected to reach their maximum capacity at about 10 Mbps while the capacity required only for watching one channel of HDTV is 20 Mbps.Tithe total number of homes connected to fibres will grow from about 11 million at the end of 2006 to about 86 mill ...
Read Project

 13