Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Internet of Food and Farm 2020 (IoF2020)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The IoF2020 project is dedicated to accelerate adoption of IoT for securing sufficient, safe and healthy food and to strengthen competitiveness of farming and food chains in Europe.It will consolidate Europe’s leading position in the global IoT industry by fostering a symbiotic ecosystem of farmers, food industry, technology providers and research institutes.The IoF2020 consortium of 73 partners, ...
Read Project

 72

 FINISHED 
Silicon carbide presents a high breakdown field (2-4 MV/cm) and a high energy band gap (2.3–3.2 eV), largely higher than for silicon. Within this frame, the cubic polytype of SiC (3C-SiC) is the only one that can be grown on a host substrate with the huge opportunity to grow only the silicon carbide thickness required for the targeted application. The possible growth on silicon substrate has remai ...
Read Project

 14

 FINISHED 

Hybrid Optomechanical Technologies (HOT)

Start date: Jan 1, 2017, End date: Dec 31, 2020,

The hybrid optomechanical technologies (HOT) consortium will lay the foundation for a new generation of devices, which connect, or indeed contain, several platforms at the nanoscale in a single “hybrid” system. As hybrid interfaces they will allow to harness the unique advantages of each subsystem within a nano-scale footprint, while as integrated hybrid devices they will enable entirely novel fun ...
Read Project

 17

 FINISHED 
ACTIVAGE is a European Multi Centric Large Scale Pilot on Smart Living Environments. The main objective is to build the first European IoT ecosystem across 9 Deployment Sites (DS) in seven European countries, reusing and scaling up underlying open and proprietary IoT platforms, technologies and standards, and integrating new interfaces needed to provide interoperability across these heterogeneous ...
Read Project

 50

 FINISHED 

Integrated Smart Spatial Exploration System (INSPEX)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

"The objective of INSPEX is to make obstacle detection capabilities that are currently only feasible on autonomous vehicles available as a personal portable/wearable multi-sensor, miniaturised, low power spatial exploration system. The INSPEX System will be used for real-time 3D detection, location and warning of obstacles under all environmental conditions in indoor and outdoor environments with ...
Read Project

 9

 FINISHED 

Advancing Smart Optical Imaging and Sensing for Health (ASTONISH)

Start date: Jun 1, 2016, End date: May 31, 2019,

The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce hospitalisation time in order to control cost and increase quality of life. Addressing this need, medical applications need to beco ...
Read Project

 25

 FINISHED 
The overall objective of STREAMS is to develop the necessary Silicon Photonics Transceiver and Routing technologies towards a new, power efficient, WDM-based, Tb/s, optical on-board interconnection paradigm that enables multiple high bandwidth, point-to-point direct links on the board level, as a step forward to the realization of exa-scale computing systems. Through the migration of successful WD ...
Read Project

 10

 FINISHED 
Understanding properties of nanoparticles (and in general of nano-functionalized materials) and how they behave in living systems is a relatively new area of scientific study. The scientific community has not yet been able to derive harmful properties of nanomaterials from the properties of the bulk material. So a precautionary approach is required when handling and using these materials in circum ...
Read Project

 15

 FINISHED 

Action Plan for the future of Mobility in Europe (MOBILITY4EU)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Global socio-economic and environmental megatrends are urging for a paradigm shift in mobility and transport that involves disruptive technologies and multimodal solutions. The individual transport sectors face diverse technical and non-technical requirements and rather individual, sometimes contradicting challenges. An action plan for the coherent implementation of innovative transport and mobili ...
Read Project

 20

 FINISHED 
OPERA project aims at supporting these ambitious challenges with technological innovation on three main aspects: • Design next generation Low Power (LP) and Ultra-Low Power (ULP) systems, • improve energy efficiency in computing by means of heterogeneous architectures, • and provide smart and energy efficient solution for the interaction between embedded smart systems and remote small form-factor ...
Read Project

 11

 FINISHED 

High density scalable optically interconnected Tb/s Board (Teraboard)

Start date: Dec 1, 2015, End date: Nov 30, 2018,

Optical communications are becoming always more relevant because of the continuous growth of the requiested bandwidth. In the last decade we assisted a continuous growing of transport and metro netwotks, presently the bottleneck is in the processing of the huge amount of data constituted by the growing number of users, the capacity of the content that is exchanged and the convergence of Telecom an ...
Read Project

 10

 FINISHED 
...-Centers around a strong vision: mass commercialization of Si-photonics-based transceivers is possible starting in 2019 by enhancing the existing photonic integration platform of one of the partners, STMicroelectronics.COSMICC will develop optical transceivers that will be packaged on-board. Combining CMOS electronics and Si-photonics with innovative-high-throughput fiber-attachment techniques, th ...
Read Project

 11

 FINISHED 

FOREnsic evidence gathering autonomous seNSOR (FORENSOR)

Start date: Sep 1, 2015, End date: Aug 31, 2018,

Covert evidence gathering has not seen major changes in decades. Law enforcement Agencies (LEAs) are still using conventional, manpower based techniques to gather forensic evidence. Concealed surveillance devices can provide irrefutable evidences, but current video surveillance systems are usually bulky and complicated, are often used as simple video recorders, and require complex, expensive infra ...
Read Project

 11

 FINISHED 

Next Station: Improving Professional Skills in Galicia

Start date: Jul 4, 2016, End date: Jul 3, 2018,

General Management of Education, Vocational Training and Educational Innovation in Council of Culture and Education in Galicia is in Santiago de Compostela and manages 205 schools with Vocational Training and 1204 schools in Galicia.Educational adviser and international program coordinator promotes and coordinates european projects with 19 Vocational Training schools with their international coor ...
Read Project

 38

 FINISHED 

Preparing R2 extension to 300mm for BCD Smart Power (R2POWER300)

Start date: Jul 1, 2015, End date: Jun 30, 2018,

R2POWER300 is committed to challenge the following Objectives: • Development and manufacturing of a multi-KET Pilot Line (i.e. Nanoelectronics, Nanotechnology, Advanced Manufacturing) • Energy Efficiency and CO2 Reduction megatrends.The project aims to achieve the following Goals:1. Set the stage for the future extension to 300mm of the R2 Fab facility located in Agrate Brianza (Italy) - i.e. l ...
Read Project

 10

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47

 FINISHED 
Heat management is a paramount challenge in many cutting edge technologies, including new GaN electronic technology, turbine thermal coatings, resistive memories, or thermoelectrics. Further progress requires the help of accurate modeling tools that can predict the performance of new complex materials integrated in these increasingly demanding novel devices. However, there is currently no general ...
Read Project

 7

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 

HARDWARE ENABLED CRYPTO AND RANDOMNESS (HECTOR)

Start date: Mar 1, 2015, End date: Feb 28, 2018,

A single flipped bit or a weak random number generator can cause secure systems to fail. The main objective of this proposal is to close the gap between the mathematical heaven of cryptographic algorithms and their efficient, secure and robust hardware implementations. It requires integrating secure cryptographic primitives such as random number generators (RNGs) and physically uncloneable funct ...
Read Project

 9

 FINISHED 
One of the main problems the CPS designers face is “the lack of simulation tools and models for system design and analysis”. This is mainly because the majority of the existing simulation tools for complex CPS handle efficiently only parts of a system while they mainly focus on the performance. Moreover, they require extreme amounts of processing resources and computation time to accurately simula ...
Read Project

 8

 FINISHED 
SMEs play a key role in European economies; they constitute the largest business block and provide the bulk of employment. They generate most of the innovative ideas for ICT and CPS-enabled IoT products, two areas which represent an inflection point for innovators and industry in Europe. EuroCPS is an ambitious project that aims to arm Europe with a network of design centres that will boost and i ...
Read Project

 15

 FINISHED 

Small cEllS coordinAtion for Multi-tenancy and Edge services (SESAME)

Start date: Jul 1, 2015, End date: Dec 31, 2017,

SESAME targets innovations around three central elements in 5G: the placement of network intelligence and applications in the network edge through Network Functions Virtualisation (NFV) and Edge Cloud Computing; the substantial evolution of the Small Cell concept, already mainstream in 4G but expected to deliver its full potential in the challenging high dense 5G scenarios; and the consolidation o ...
Read Project

 21

 FINISHED 

Trusted Apps for open CPS (TAPPS)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

Open and smart cyber-physical systems (CPS) are considered to be the next revolution in ICT with enormous economic potential enabling novel business models for integrated services and products. In many areas of CPS devices, there is a strong trend towards open systems, which can be extended during operation instantly adding functionalities on demand. The main goal of the TAPPS (Trusted Apps for op ...
Read Project

 9

 FINISHED 
The primary objective of FOSTER ITS is to design and develop the first secured GNSS module available on the market for ITS application.The FOSTER ITS products will be Galileo, EGNOS, GPS and GLONASS enabled and will offer greater resilience against the increasing range of GNSS threats by:• Detecting signal attack attempts (spoofing, meaconing and jamming);• Providing indicators to users about conf ...
Read Project

 4

 FINISHED 
The introduction of the electricity market, the widespread diffusion of distributed generation from renewable and non-programmable energy sources and the need for storage are quickly changing the problems that Transmission and Distribution system operators have to face in their activity and are requiring a “smarter” grid. A first step in this direction is the development and installation of a flex ...
Read Project

 12

 FINISHED 
Recent drama in civil aviation leading to losses of several aircrafts (AF447, MH370, etc…) have shown first an incapacity of quickly dispatching rescue means for potential survivals, and second, a surprising incapacity of determining the position of the aircrafts wreck, generating major researches expenses.This situation led to the creation of a joint RTCA/Eurocae working area in SC229/WG98 group; ...
Read Project

 7

 FINISHED 

Organic Bioelectronics (ORGBIO)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

Organic Bioelectonics is a new discipline which holds promise to shape, direct, and change future medical treatments in a revolutionary manner over the next decades. At the moment Europe has a unique leading position in this area, being almost all the world-leading groups in this field located in Europe and constituting the core of this international training network. However, realizing the promis ...
Read Project

 15

 FINISHED 
Micro-Optical MEMS, micro-mirrors and pico-projectors.Lab4MEMS II will feature the Pilot Line for innovative technologies on advanced Micro-Opto-Electro-Mechanical Systems (MOEMS). This is not just a special class of MEMS systems in fact, but it deals with MEMS merged with Micro-optics, which involves sensing or manipulating optical signals on a very small size scale, using integrated mechanical, ...
Read Project

 21

 FINISHED 

Photonic Libraries And Technology for Manufacturing (PLAT4M)

Start date: Oct 1, 2012, End date: Mar 31, 2017,

Description "PLAT4M will make silicon photonics ready for transition to industry"Silicon is now a mature integration platform that has brought CMOS microelectronics to mass-market application. The PLAT4M vision is that silicon photonics will lead to a similar revolution in the photonics sector.Over the past years silicon photonics has see ...
Read Project

 18

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 

Green Computing Node for European micro-servers (EUROSERVER)

Start date: Sep 1, 2013, End date: Jan 31, 2017,

Description New 3D server architecture for better energy-efficient Data CentresData Centres (DCs) are a key resource for innovation and leadership of industry in Europe. They drive the Information Society through hosted cloud applications. To sustain the ever-increasing demand of storing and processing data, DCs need to improve their capa ...
Read Project

 14

 FINISHED 
Providing broadband wireless communications to a majority of European citizens is a major objective of the EC at the horizon of 2020. With a current annual growth rate in the range of 70%, the mobile data traffic of smartphones, tablets, machine-to-machine and other portable devices dramatically challenges the 4G wireless cellular network currently under deployment. To sustain this growth, high da ...
Read Project

 15

 FINISHED 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

...res). IRIS is strongly oriented toward industrialization as it is led by a major European telecom equipment manufacturer (Ericsson) and participated by a major European Silicon manufacturing company (STMicroelectronics), already committed to the industrialization of Silicon Photonics.
Read Project

 8

 FINISHED 
Description OraMod project: Helping clinicians predict oral cavity cancer reoccurrenceGenomic markers and computer models can predict the reoccurance of oral cavity cancer. But these innovative diagnostic technologies are currently stuck in labs and are not being used by clinicians in hospitals. The EU-funded project OraMod, led by the Un ...
Read Project

 9

 FINISHED 

ACTive Implant for Optoacoustic Natural sound enhancement (ACTION)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The ACTION project builds on the recent discovery that relatively low levels of pulsed infrared laser light are capable of triggering activity in hair cells of the partially hearing (hearing impaired) cochlea and vestibule. So far the excessively large volume of optical fibre systems and external light sources used for animal studies prevented the practical use of this discovery for long term anim ...
Read Project

 7

 FINISHED 
Description CONTREX (Design of embedded mixed-criticality CONTRol systems under consideration of EXtra-functional properties)Abstract – Up to now mission & safety critical services of Systems of Systems (SoS) have been running on dedicated and often custom designed Hardware/Software platforms. In the near future such systems will be accessib ...
Read Project

 15

 FINISHED 

Advanced Gratting for Thin Films Solar Cell (AGATHA)

Start date: Sep 1, 2010, End date: Aug 31, 2016,

"The minority carrier diffusion lengths are small in polycrystalline or amorphous materials used in thin film solar cells, requiring thin layers to maximize charge collection. This is contradictory for the requirement to maximize solar energy absorption. The optical design consisting in increasing solar cell’s light-trapping capability is of prime importance. In order to provide total internal ref ...
Read Project

 6

 FINISHED 

People Centric easy to implement e-mobility (FREE-MOBY)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

The FREE-MOBY project is focused to the implementation of easy to deploy micro fully electrical vehicles (450-650kg and speeds up to 90+ km/h)) and city EVs (650-1000kg).By an extra cost of only 15% solar installations in roof houses can be integrated with robust battery packs that can smooth peak powers up to 30%. Solar parking and integrated photovoltaic-battery installations are becoming more a ...
Read Project

 14

 FINISHED 
ClouT's overall concept is leveraging the Cloud Computing as an enabler to bridge the Internet of Things with Internet of People via Internet of Services, to establish an efficient communication and collaboration platform exploiting all possible information sources to make the cities smarter and to help them facing the emerging challenges such as efficient energy management, economic growth and de ...
Read Project

 6

 FINISHED 
Description A flexible architecture compatible with current infrastructures and low cost components based on silicon photonics: the keys for mass Fiber-To-The-Home ultra-broadband deployment FABULOUS will design, develop and characterize new Silicon Photonics components for application in next-gen ...
Read Project

 8