Search for European Projects

16 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The vision of EU-ToxRisk is to drive a paradigm shift in toxicology towards an animal-free, mechanism-based integrated approach to chemical safety assessment. The project will unite all relevant disciplines and stakeholders to establish: i) pragmatic, solid read-across procedures incorporating mechanistic and toxicokinetic knowledge; and ii) ab initio hazard and risk assessment strategies of chemi ...
Read Project

 43

 FINISHED 
PROTECT aims to introduce to the market One step antimicrobial finish processes for polymeric materials used in i) specialty textiles for public areas and hospitals, ii) water treatment membranes, and iii) implantable medical devices. Compared to main existing manufacturing routes, the proposed one-step coating technologies are simple, fast, and reproducible. For this, PROTECT uses as a starting p ...
Read Project

 23

 FINISHED 

Coordinated energy-related PPIs actions for cities (CEPPI) (CEPPI 2)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

CEPPI aims to build capacity in cities on how to achieve more sustainable energy solutions through a pro-innovation procurement approach (PPI) & to demonstrate this by selectively intervening in scheduled public tenders. The interventions will involve 5 cities with different economic & political situations & provide the case-based evidence for replication by others.The scale of energy demand in ...
Read Project

 9

 FINISHED 

Solar Heat Integration Network (SHINE)

Start date: Oct 1, 2013, End date: Sep 30, 2017,

Large solar heating systems are decisive to cover a major part of European low temperature heat demand by solar energy and therewith to meet European policy aims. However, today only a negligible share of solar heating systems installed in Europe are large units due to manifold technical and socio-economic obstacles. The challenge of solar thermal technology and the overall objective of the propos ...
Read Project

 11

 FINISHED 
GloNet aims at designing, developing, and deploying an agile virtual enterprise environment for networks of SMEs involved in highly customized and service-enhanced products through end-to-end collaboration with customers and local suppliers (co-creation). GloNet implements the glocal enterprise notion with value creation from global networked operations and invol¬ving global supply chain managemen ...
Read Project

 8

 FINISHED 
"In order for the EC to achieve ambitious renewable energy targets there is a strong need to accelerate market penetration of Renewable Energy Systems (RES) in both industrial and domestic sectors. The domestic sector is of major significance, as it will reduce reliance on large centralized energy plants. There are several domestic options including solar thermal, solar electric, heat pump and bio ...
Read Project

 14

 FINISHED 
Today, fibre-reinforced composites (CRP/GRP) can be found in high tech applications like in aerospace and energy industry. The production of these materials is expensive and the quality control is often manually conducted. As the processes of quality control and even the way how to analyse and characterize damage and defects within fibre-reinforced composites are not standardized yet, parts consi ...
Read Project

 7

 FINISHED 

Oxide Materials Towards a Matured Post-silicon Electronics Era (Orama)

Start date: Oct 1, 2010, End date: Sep 30, 2014,

Orama is on the development of new high performance multifunctional oxide based electronic materials, processable at low temperatures, including flexible substrates that have the potential to catapult the electronics industry into a new era of growth. Orama will develop, analyze and utilize these new materials and techniques to investigate into device concepts highlighting the potential of oxides ...
Read Project

 18

 FINISHED 
"The DEM-CHILD project focusses on the main cause for childhood dementia in Europe, the neuronal ceroid lipofuscinoses (NCLs). The NCLs are neurodegenerative diseases characterized by dementia, blindness, epilepsy and physical decline leading to an early death of the patients. Since no cure is currently available, these disorders represent a serious social, medical, and economic challenge.To date, ...
Read Project

 13

 FINISHED 
"About 400 solar cooling pilots have now been installed, tested, living and analyzed throughout Europe. Yet, none of them combines in a single integrated system the solar thermal tri-generation: sanitary water heating, space heating and space cooling. The on-going HighCombi project will result in a first tentative of such a concept. However, the partners of the COOLSUN project have already identif ...
Read Project

 12

 FINISHED 

Sound Design of Reed Organ Pipes with Innovative Tools (REEDDESIGN)

Start date: Nov 1, 2011, End date: Oct 31, 2013,

"The main objectives are to solve practical problems of the dimensioning and voicing of reed organ pipes, to develop innovative methods, tools and software for helping the voicing adjustments and sound design work of organ builder SMEs, to develop new pipe types with sound character of Asian musical instruments. As 8 SMEs from 7 countries participate in the project who have a very large interest o ...
Read Project

 11

 FINISHED 
"The rapidly expanding knowledge of NMDs genetic diagnosis, pathogenesis and therapeutic possibilities has provided new targets for disease characterisation, early diagnosis, drug discovery and development as well as has raised many questions about how to translate this knowledge into clinical practice as (initial) clinical trials typically run for such a short time that clinical improvement can h ...
Read Project

 15

 FINISHED 
Clear-up presents a holistic approach to the reducing operational energy use in buildings. By development and novel use of nano-materials it aims to increase energy performance in heating, ventilation, air conditioning (HVAC) and lighting systems, and to improve indoor air quality using catalytic purification. Clear-up’s solutions are designed for retro-fitting existing buildings and of course for ...
Read Project

 23

 FINISHED 
"The SM-BIO-POWER project aims to stimulate, promote and support the participation of high-tech, research intensive SMEs operating in the medical technology and biomedical engineering sectors of the health field for long term research interest and increased participation in the context of FP7 European Research activities. The proposed project is largely based on the outcomes and the experience ga ...
Read Project

 11

 FINISHED 
"The main objective is to solve practical problems concerning the voicing of labial organ pipes, and to develop innovative methods and tools for helping the voicing adjustments and sound design work of organ builder SMEs. The project is based on the precognitions of the successfully completed “DEMORGPIPE” CRAFT project (G1ST-CT-2002-50267), which has resulted in a scientific explanation of the sca ...
Read Project

 13

 FINISHED 
The Strategic Objective of the USEandDIFFUSE project is to enhance dissemination and exploitation of research results and facilitate the exchange of good practices. The project will focus mostly on RTD projects involving SMEs implemented under the Framework Programmes, and within key industrial sectors (ICT, Energy, Health, Environment and Agro-Food). Based on past experiences and reviews of best ...
Read Project

 9