Search for European Projects

Over 40 European Projects Found

Searched on 125080 European Projects

 FINISHED 
inteGRIDy aims to integrate cutting-edge technologies, solutions and mechanisms in a scalable Cross-Functional Platform connecting energy networks with diverse stakeholders, facilitating optimal and dynamic operation of the Distribution Grid (DG), fostering the stability and coordination of distributed energy resources and enabling collaborative storage schemes within an increasing share of renewa ...
Read Project

 31

 FINISHED 

Sharing Cities (SHAR-LLM)

Start date: Jan 1, 2016, End date: Dec 31, 2020,

Sharing Cities has four key objectives. 1) To achieve scale in the European smart cities market by proving that properly designed smart city solutions, based around common needs, can be integrated in complex urban environments. This will be done in a way that exhibits their true potential and allows for the significant scale-up and consequent increase in social, economic and environmental value. ...
Read Project

 36

 FINISHED 
From aeronautics to oil&gas, complex metal parts embrace major challenges across their lifecycles from the green field intensive manufacturing to the numerous maintenance and repairing operations worldwide distributed. The synergic combination of additive and subtractive processes could overcome individual shortcomings, going beyond the simple succession of steps. 'Plug and produce' modular approa ...
Read Project

 20

 FINISHED 

Dependability Engineering Innovation for CPS - DEIS (DEIS)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

Cyber-Physical-Systems harbor the potential for vast economic and societal impact in all major application domains, however in case of failure this may lead to catastrophic results for industry and society. Thus, ensuring the dependability of such systems is the key to unlocking their full potential and enabling European industries to develop confidently business models that will nurture their soc ...
Read Project

 10

 FINISHED 
Despite the proclaimed benefits (i.e. scalability, reliability, cost-effectiveness) of Future Internet (FI) technologies (i.e. edge & cloud computing, IoT/CPS) for factory automation, their adoption from manufacturers remains low for various reasons, including technology issues (e.g., poor situation awareness, limited deployments, no standards-based reference implementations) and the lack of a smo ...
Read Project

 12

 FINISHED 
"Advanced Manufacturing has been highlighted by the EU as one of the key enablers to support and promotion of business research and innovation in key enabling technologies. Therefore, a number of objectives, aligned with pursuing the large scale targets, have been set for advanced manufacturing through four pillars: technology, economic, social and environment. Thus, HINDCON project aims to adapt ...
Read Project

 12

 FINISHED 
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods will enable validation with reasonable efforts. The resulting validation framework will ensure Europeans Industry competiti ...
Read Project

 76

 FINISHED 

Demand Response in Block of Buildings (DR-BOB)

Start date: Mar 1, 2016, End date: Feb 28, 2019,

The aim of the DR-BOB project is to demonstrate the economic and environmental benefits of demand response in blocks of buildings for the different key actors required to bring it to market. To achieve its aim the DR-BOB project will:• Integrate existing technologies to form the DR-BOB Demand Response Energy Management solution for blocks-of-buildings with a potential ROI of 5 years or less. • De ...
Read Project

 10

 FINISHED 
The objective of the proposed CSA is to support and complement R&I activities in Smart Systems Integration (SSI) by structuring industrial cooperation and facilitating end-user adoption for the next generations of miniaturised smart objects and systems.Previous CSAs have revealed the immense breadth of SSI in its technology demands, its application sectors, its business ramifications, its provider ...
Read Project

 18

 FINISHED 
TagItSmart sets out to redefine the way we think of everyday mass-market objects not normally considered as part of an IoT ecosystem. These new smarter objects will dynamically change their status in response to a variety of factors and be seamlessly tracked during their lifecycle. This will change the way users-to-things interactions are viewed.Combining the power of functional inks with the perv ...
Read Project

 15

 FINISHED 
The share of renewable energy is growing rapidly driven by the objective to reduce greenhouse gas emissions. The amount of electric power which can be supplied to the grid depends on the time of the day and weather conditions. A conventional fleet of thermal power plants is required to compensate for these fluctuations before large scale energy storage technologies will be mature and economically ...
Read Project

 23

 FINISHED 

Action Plan for the future of Mobility in Europe (MOBILITY4EU)

Start date: Jan 1, 2016, End date: Dec 31, 2018,

Global socio-economic and environmental megatrends are urging for a paradigm shift in mobility and transport that involves disruptive technologies and multimodal solutions. The individual transport sectors face diverse technical and non-technical requirements and rather individual, sometimes contradicting challenges. An action plan for the coherent implementation of innovative transport and mobili ...
Read Project

 20

 FINISHED 
The project SmartNet aims at providing architectures for optimized interaction between TSOs and DSOs in managing the exchange of information for monitoring and for the acquisition of ancillary services (reserve and balancing, voltage regulation, congestion management) both at national level and in a cross-border context. Local needs for ancillary services in distribution systems are supposed to co ...
Read Project

 22

 FINISHED 
NEED FOR INNOVATION: The critical mass of Energy-efficient Buildings (EeB) in Europe by 2020 will be achieved through sustainable industrialisation of high-performance architectural, structural and building-service components. However, realising the targeted performance in design is hampered by critical shortcomings during on-site construction and refurbishment that cause a lower built-quality and ...
Read Project

 14

 FINISHED 
PERFoRM - Production harmonizEd Reconfiguration of Flexible Robots and Machinery aims to the conceptual transformation of existing Production Systems towards plug&produce production systems in order to achieve a flexible manufacturing environments based on rapid and seamless reconfiguration of machinery and robots as response to operational or business events.These objectives require research acti ...
Read Project

 18

 FINISHED 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Read Project

 39

 FINISHED 
MAYA aims at developing simulation methodologies and multidisciplinary tools for the design, engineering and management of CPS-based (Cyber Physical Systems) Factories, in order to strategically support production-related activities during all the phases of the factory life-cycle, from the integrated design of the product-process- production system, through the optimization of the running factory, ...
Read Project

 11

 FINISHED 
... approach suitable both at small and large scale. Rapid transfer from lab-scale to testing at demonstration sites will be eased by the presence of industrial partners and end-users, as Bilfinger, Siemens, SXS, and Neo Group.
Read Project

 15

 FINISHED 

Young Styrians GO Europe!

Start date: Jun 1, 2016, End date: May 31, 2018,

...ice Unit for the European Union- The regional Government of Styria with the Department for European Affairs and External Relations.- LOGO youth management.- A pool of Styrian enterprises e.g. Siemens AG Österreich.And here are the 14 upper-level secondary technical and vocational schools from Styria which participate as project partners of “Styrian Schools GO Europe!”:- Bad Gleichenberg Tourism Sc ...
Read Project

 25

 FINISHED 
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation systems.3Ccar’s impact is maximizing pragmatic strategy: Use semiconductor technology innovations to manage functionality & complexity inc ...
Read Project

 47

 FINISHED 
Innovation in the automotive industry is of pivotal importance for European´s prosperity. OSEM-EV will provide solutions for better autonomy and predictable range to address today´s car buyers concern about electro mobility. Just increasing the battery capacity is not a viable option because the expectation is to have a familiar level of comfort and safe, eco and human oriented mobility at afforda ...
Read Project

 13

 FINISHED 
The vision of PaaSword is to maximize and fortify the trust of individual, professional and corporate customers to Cloud -enabled services and applications, to safeguard both corporate and personal sensitive data stored on Cloud infrastructures and Cloud-based storage services, and to accelerate the adoption of Cloud computing technologies and paradigm shift from the European industry. Thus, PaaSw ...
Read Project

 10

 FINISHED 

Ubiquitous iNteroperable Care for Ageing People (UNCAP)

Start date: Jan 1, 2015, End date: Dec 31, 2017,

The lack of ICT platforms based on open standards is regarded as one of the most significant market barriers to the creation of new care & assistance paradigms with global interconnection and interworking. UNCAP delivers an interoperable platform based on open industrial standards that leverages on existing technologies for biosensing, indoor/outdoor localisation and home-automation. The result is ...
Read Project

 23

 FINISHED 

European Roadmap for Cyber-Physical Systems in Manufacturing (sCorPiuS)

Start date: Feb 1, 2015, End date: Jan 31, 2017,

The worldwide economic downturn forces the Western companies to cut costs and enhances the performances of their processes in order to maintain the European leadership and excellence in manufacturing. Effectively, European businesses cannot compete anymore on workforce costs with Eastern countries: as a result the manufacturers have to leverage on more sustainable and efficient production systems. ...
Read Project

 6

 FINISHED 

New Bus ReFuelling for European Hydrogen Bus Depots (NewBusFuel)

Start date: Jun 1, 2015, End date: Dec 31, 2016,

The overall aim of NewBusFuel is to resolve a significant knowledge gap around the technologies and engineering solutions required for the refuelling of a large number of buses at a single bus depot. Bus depot scale refuelling imposes significant new challenges which have not yet been tackled by the hydrogen refuelling sector:• Scale – throughputs in excess of 2,000kg/day (compared to 100kg/day fo ...
Read Project

 27

 FINISHED 

Full Aero-thermal Combustor-Turbine interactiOn Research (FACTOR)

Start date: Dec 1, 2010, End date: Nov 30, 2016,

To achieve lower Specific Fuel Consumption (SFC) and CO2/NOx emissions, modern turbomachineries operate at high velocities and high temperature conditions. The lack of confidence in the prediction of combustor-turbine interactions leads to apply extra safety margins on components design. Therefore, the understanding of combustor-turbine flow field interactions is mandatory to preserve High Pressur ...
Read Project

 24

 FINISHED 

Mobility Of VET Forward Automotive Sector Traineeships

Start date: Nov 1, 2014, End date: Oct 31, 2016,

The project is a proposal from an italian mobility Consortium, which involves partners (VET secondary level schools, VET tertiary level organisations, enterprises) caming from Emilia Romagna region and which unsigned a network agreement to build the VET Hub named "POLO TECNICO-PROFESSIONALE PER LA FILIERA MECCANICA FORNOVO DI TARO (PR)", that is a permanent system of sharing resources to organize ...
Read Project

 13

 FINISHED 
One of the strategic objectives of the industrial initiative of the SET Plan on wind energy is to reduce cost of energy by improving reliability of wind turbines and their components and optimizing operation and maintenance (O&M) strategies. Increasing reliability and optimizing O&M have a direct impact on the availability of wind turbines and thus reduce cost and increase energy output. This stra ...
Read Project

 13

 FINISHED 
DOLFIN addresses the demand/response and energy stabilisation scenario of the Smart Grid by optimising the energy consumption of Data Centres (DC), accompanied, if necessary, with a respective negotiation and readjustment of the DC's Service Level Agreements (SLAs). To achieve this, DOLFIN adopts an innovative energy closed control loop that targets to deliver the following advancements:• Create a ...
Read Project

 10

 FINISHED 
Modern societies are eagerly looking for the integration of mobility and their urban living area to enable reliable and safe transportation, better efficiency and cost, comfort and low emissions for the environment. The trends are obvious, however, providing a hybrid/electrical car is only one part of the full picture. The "standard" customer is still very reluctant to buy a full electrical vehicl ...
Read Project

 17

 FINISHED 

REliable, Resilient and secUre IoT for sMart city applications (RERUM)

Start date: Sep 1, 2013, End date: Aug 31, 2016,

RERUM will develop, evaluate, and trial an architectural framework for dependable, reliable, and secure networks of heterogeneous smart objects supporting innovative Smart City applications. The framework will be based on the concept of "security and privacy by design", addressing the most critical factors for the success of Smart City applications.The technical approach aims to enable tighter int ...
Read Project

 12

 FINISHED 
An increasing number of cities have started to introduce new ICT enabled services. However, the uptake of smart city applications is hindered by various issues, such as the difficulty of integrating heterogeneous data sources and the challenge of extracting up-to-date information in real-time from large-scale dynamic data. Today the challenges are often addressed by application specific solutions ...
Read Project

 10

 FINISHED 
In a world of multi-stakeholder information and assets provision on top of millions of real-time interacting and communicating things, COSMOS aims at enhancing the sustainability of smart city applications by allowing IoT based systems to reach their full potential. COSMOS will enable things to evolve and act in a more autonomous way, becoming more reliable and smarter. Things will be able to lear ...
Read Project

 10

 FINISHED 

Critical System Engineering Acceleration (CRYSTAL)

Start date: May 1, 2013, End date: Jul 31, 2016,

CRYSTAL aims at fostering Europe’s leading edge position in embedded systems engineering in particular regarding quality and cost effectiveness of safety-critical embedded systems and architecture platforms.Its overall goal is to enable sustainable paths to speed up the maturation, integration, and cross-sectoral reusability of technological and methodological bricks of the factories for safety-cr ...
Read Project

 70

 FINISHED 
"Ultra Light Vehicles (ULV) intrinsically have a better efficiency due to their improved transport capability per vehicle mass. Additionally improved driving dynamics performance can more easily be achieved because of the reduced mass.However, the design of ULV sharing the same road with heavier cars represents a complex technical challenge for achieving acceptable safety levels. Furthermore, at p ...
Read Project

 11

 FINISHED 

Engineering Apps for advanced Manufacturing Engineering (APPS4AME)

Start date: Dec 1, 2012, End date: Nov 30, 2015,

Manufacturing is being shaped by the paradigm shift from mass production to on demand dictated, personalised, customer-driven and knowledge-based proactive production. Thus, shorter product life cycles, an increased number of product varieties, high performance processes and flexible production systems result in an increased complexity in the product design, process development, factory and produc ...
Read Project

 14

 FINISHED 
There is an increasing pressure on European SMEs to deliver high quality, often customised products using cost effective manufacturing processes and systems while competing in the global market. One of the key production processes in high labour cost areas such as Europe is assembly of final products in sectors such as automotive, aerospace, pharmaceutical and medical industries. They all require ...
Read Project

 10

 FINISHED 
Traffic demand is increasing dramatically, year on year, with typical growth figures of up to 60% for Internet based traffic. Such traffic increase is impacting on both network costs and power consumption. Moreover, traffic is not only increasing but becoming much more dynamic, both in time and direction. For these reasons, transport network evolution from current DWDM systems towards elastic opti ...
Read Project

 16

 FINISHED 
The development of sustainable products is a basic requirement for European industries to grow in highly competitive environments. Innovation is the key challenge and must be supported with the highest priority. Such considerations fully apply to automotive industries, which are forced to develop products of increasing quality in shorter and shorter timeframes to come up with competitive pressure ...
Read Project

 4

 FINISHED 
Current Cloud's offer is becoming day by day wider providing a vibrant technical environment, where SMEs can create innovative solutions and evolve their services. Cloud promises cheap and flexible services to end-users at a much larger scale than before. However, Cloud business models and technologies are still in their initial hype and characterized by critical early stage issues, which pose spe ...
Read Project

 12