Search for European Projects

9 European Projects Found

Searched on 125080 European Projects

 FINISHED 

3D Advanced Metrology and materials for advanced devices (3DAM)

Start date: Apr 1, 2016, End date: Mar 31, 2019,

The objective of the 3DAM project is to develop a new generation of metrology and characterization tools and methodologies enabling the development of the next semiconductor technology nodes. As nano-electronics technology is moving beyond the boundaries of (strained) silicon in planar or finFETs, new 3D device architectures and new materials bring major metrology and characterization challenges w ...
Read Project

 18

 FINISHED 

Seven Nanometer Technology (SeNaTe)

Start date: Apr 1, 2015, End date: Mar 31, 2018,

The SeNaTe project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 12nm and 10nm technology nodes. The main objective is the demonstration of the 7nm IC technology integration in line with the industry needs and the ITRS roadmap on real devices in the Advanced Patterning Center at imec using innovative devi ...
Read Project

 41

 FINISHED 
"The European photovoltaics PV market still represents the predominant share of worldwide installations and electricity generated from PV is becoming increasingly competitive, with an average levelized cost of energy (LCOE) estimated to be between 0.10–0.16 €/kWh in 2011 . This constant reduction of LCOE means that the European industry can only regain its competitiveness with (i) a concomitant re ...
Read Project

 16

 FINISHED 

European 450mm Equipment Demo Line (E450EDL)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The aim of the E450EDL project is to continue the engagement of the European semiconductor equipment and materials industry in the 450mm wafer size transition that started with the ENIAC JU EEMI450 initiative and proceeded with subsequent projects funded with public money, amongst others NGC450, SOI450, EEM450PR. The demo line resulting from this project will be such that it will enable first crit ...
Read Project

 44

 FINISHED 
This project will exploit the potential of chalcogenide based thin film photovoltaic technologies for the development and scale-up of new processes based on nanostructured materials for the production of high efficiency and low cost photovoltaic devices and modules compatible with mass production requirements. Cu(In,Ga)(S,Se)2 (CIGS) chalcogenide based devices have the highest efficiency of all th ...
Read Project

 14

 FINISHED 

Advanced TEchnology MOdelling for eXtra-functionality devices (ATEMOX)

Start date: Jul 1, 2010, End date: Nov 30, 2013,

Description Extends the capabilities of TCAD to the modelling of leakage currents and technologies for low-leakage ultra-shallow junctions.Within previous European projects process simulation has been brought to a state which allows in industrial environments a sufficiently accurate simulation of doping profiles in advanced CMOS technolog ...
Read Project

 14

 FINISHED 

Semiconductor Equipment Assessment Leveraging Innovation (SEAL)

Start date: Jun 1, 2010, End date: Sep 30, 2013,

Description Seal is an EC-funded project covering semiconductor equipment assessment to strengthen the European semiconductor equipment industry. SEAL is an integrated project consisting of 17 equipment assessment sub-projects in the area of semiconductor manufacturing equipment. The assessment th ...
Read Project

 39

 FINISHED 

Silicon sUbstrates from an inteGrated Automated pRocess (SUGAR)

Start date: Oct 1, 2010, End date: Sep 30, 2013,

"Since the silicon wafer still accounts for a substantial part of the cost of solar modules, reducing the silicon consumption per watt peak is one of the most effective ways of reducing the overall cost of PV systems. In this project we propose a methodology to produce a high-efficiency solar module with a very limited amount of Si. The methodology is based on two technologies: the first one for t ...
Read Project

 11

 FINISHED 

European 450mm Equipment & Materials Initiative (EEMI 450)

Start date: Apr 1, 2010, End date: Mar 1, 2013,

Large-scale semiconductor fabrication is now standardised on 300mm diameter wafers. However, as demand grows and node dimensions diminish, major chipmakers are considering offsetting the growing costs of miniaturisation by increasing wafer size to 450mm to cut cost per produced die. A prerequisite is the availability of the required quality wafers and equipment able to handle larger wafers. The EN ...
Read Project

 27