Search for European Projects

25 European Projects Found

Searched on 125080 European Projects

 FINISHED 
certMILS develops a security certification methodology for Cyber-physical systems (CPS). CPS are characterised by safety-critical nature, complexity, connectivity, and open technology. A common downside to CPS complexity and openness is a large attack surface and a high degree of dynamism that may lead to complex failures and irreparable physical damage. The legitimate fear of security or function ...
Read Project

 9

 FINISHED 

SmArt BI-directional multi eNergy gAteway (SABINA)

Start date: Nov 1, 2016, End date: Oct 31, 2020,

Flexibility needs to be added to Europe’s power system to accommodate an increasing share of variable power generation from renewable sources. Indeed, service quality issues start to arise on the grid when this share in electricity consumption reaches 10%. To meet the EU’s targets for reduction of greenhouse gas emissions this share should rise to 30% by 2030 and up to 50% by 2050. The cost of thi ...
Read Project

 10

 FINISHED 
... platform for smart energy management at building and district-level. The THERMOSS technologies have been picked out from the catalogs of prominent European industrial players, Bosch, Veolia, Exergy, Schneider Electric taking into account business profitability, energy efficiency and potential for large-scale deployment. They will be tuned, combined and sized as part of the project thanks to dedic ...
Read Project

 13

 FINISHED 
Five DSOs (CEZ distribuce, ERDF, EON, Enexis, Avacon) associated with power system manufacturers, electricity retailers and power system experts, propose a set of six demonstrations for 12 to 24 months. Within three years, they aim at validating the enabling role of DSOs in calling for flexibility sources according to local, time-varying merit orders. Demonstrations are designed to run 18 separat ...
Read Project

 20

 FINISHED 
An inspiration for INVADE are the world-wide agreements on minimisation of human caused effects to climate change and energy efficiency targets set at the European Union with ambitious goals for reduction of greenhouse gas emission and for increase of renewable energy share. To enable a higher share of renewable energy sources to the smart grid and gain a traction in the market place a few critica ...
Read Project

 12

 FINISHED 

Massive InteGRATion of power Electronic devices (MIGRATE)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

...ation. European TSOs from Estonia, Finland, France, Germany, Iceland, Ireland, Italy, Netherlands, Slovenia, Spain and UK have joined to address such challenges with manufacturers (Alstom, Enercon, Schneider Electric) and universities/research centres. They propose innovative solutions to progressively adjust the HVAC system operations. Firstly, a replicable methodology is developed for appraising ...
Read Project

 24

 FINISHED 

GrowSmarter

Start date: Jan 1, 2015, End date: Dec 31, 2019,

GrowSmarter aims to:• Improve the quality of life for European citizens by better mobility, housing and the quality of urban infrastructure while improving the citizens economy by lower energy costs and creating as much as 1500 new jobs (on the demonstration level).• Reduce the environmental impact by lower energy needs by 60 % and increased use of renewable energy thus reducing GHG emissions eve ...
Read Project

 41

 FINISHED 
Pentagon is a 3-years research and innovation project that will investigate the potential of wider deployment of energy conversion technologies and strategies at district-level, with the aim to foster flexibility in the low-voltage and medium-voltage grid. The rationale that underlies Pentagon approach is that multi-vector smart districts can be the key enablers of future smart grids, provided the ...
Read Project

 10

 FINISHED 
Embedded systems have significantly increased in technical complexity towards open, interconnected systems. This has exacerbated the problem of ensuring dependability in the presence of human, environmental and technological risks. The rise of complex Cyber-Physical Systems (CPS) has led to many initiatives to promote reuse and automation of labor-intensive activities. Two large-scale projects are ...
Read Project

 32

 FINISHED 
The project will deploy and demonstrate local storage technologies which have reached TRL 5-6 in a real electrical grid, and will develop ICT tools to exploit the synergies between them, the smart grid and the citizens. The demonstration in this real environment will be driven by five use cases covering low voltage and medium voltage scenarios and a wide range of applications and functionalities. ...
Read Project

 14

 FINISHED 
SMEs play a key role in European economies; they constitute the largest business block and provide the bulk of employment. They generate most of the innovative ideas for ICT and CPS-enabled IoT products, two areas which represent an inflection point for innovators and industry in Europe. EuroCPS is an ambitious project that aims to arm Europe with a network of design centres that will boost and i ...
Read Project

 15

 FINISHED 

Framework for Innovation Competencies Development and Assessment

Start date: Jan 1, 2015, End date: Dec 31, 2017,

EU’s Innovation Union Initiative underlines the importance of innovations in all sectors of the economy. For creating new innovations we need individuals that are capable to participate in diverse everyday innovation processes. One main problem is that universities don’t have proper tools to measure the development of the students’ innovation competencies during their studies. Therefore, we don’t ...
Read Project

 14

 FINISHED 
Unlike the control and observability put in service in HV/MV, LV networks are still being substantially managed as usual: no visibility of power and voltage or grid components status, poor knowledge of connectivity, manual operation of switches or few tools for worker support. The LV grid characteristics (radial topology, exposition to local disturbances, local accumulation of distributed generati ...
Read Project

 20

 FINISHED 
Today, Building Energy Performance Simulation (BEPS) analysis tends to show a large discrepancy with real energy performance. Most cases are due to gross mistakes rather than fundamental inadequacy of available technology and methods. The reasons are manifold. Highly simplified calculation methods are used far beyond their domain of validity. Assumed boundary conditions such as occupant behaviour ...
Read Project

 18

 FINISHED 

Arrowhead (ARROWHEAD)

Start date: Mar 1, 2013, End date: Feb 28, 2017,

"Our society is facing both energy and competitiveness challenges. These challenges are tightly linked and require new dynamic interactions between energy producers and energy consumers, between machines, between systems, between people and systems, etc. Cooperative automation is the key for these dynamic interactions and is enabled by the technology developed around the Internet of Things and Ser ...
Read Project

 87

 FINISHED 
The DREAM project will lay the foundations for a novel heterarchical management approach of complex electrical power grids, providing new mechanisms for consumer involvement in economical and ecological electricity use as well as stable and cost effective integration of distributed renewable resources.Applying the principles of autonomous agent-based systems to the control and management of the el ...
Read Project

 15

 FINISHED 

Ideal Grid for All (IDE4L)

Start date: Sep 1, 2013, End date: Oct 31, 2016,

The IDE4L project will define, develop and demonstrate the entire system of distribution network automation, IT systems and applications for active network management. Active distribution networks will utilize distributed energy resources (DERs) for network management including both real time operation and long-term network planning viewpoints. DERs consist of aggregated distributed generation, de ...
Read Project

 13

 FINISHED 
To solve the energy dilemma, research effort was concentrated on stand-alone buildings weakly tight to their immediate environment. Specifically in each building only key sub-systems were considered individually. Such individual systems were made more effective by becoming pervasive into any building area (the reign of “boxes” and “controllers”). Importing parameters from other sub-systems allowed ...
Read Project

 18

 FINISHED 
Description Packaging and thermal management in an efficient and cost effective way for SiC and GaN-based power devicesFor industrial motor-drive, UPS and solar inverters applications and aerospace or telecom radio frequency applications, new emerging power semiconductor technologies, respectively SiC and GaN, have demonstrated their high ...
Read Project

 15

 FINISHED 
Hospitals are known to be large energy consumers and in most European countries the high proportion of ageing building stocks makes hospitals amongst the least energy efficient public buildings. Nowadays there is a growing urgency to achieve real energy savings from existing building stocks and to build more sustainable new hospitals.The GREEN@Hospital project aims at integrating the latest ICT so ...
Read Project

 11

 FINISHED 
The SOLUTION project mobilises public / private resources to build showcases of energy self sufficient communities in Austria, Croatia, Finland and Switzerland (together with the associated Slovenian community) with a strong potential for replication throughout Europe. SOLUTION is designed to respond to the needs of an effective take-off of the European SET-plan by demonstrating novel applications ...
Read Project

 19

 FINISHED 
The European Sport and Recreation Building Stock accounts for approximately 1,5 Million buildings or 8% of the overall building stock. These facilities are unique by their physical nature, their energy consumption profiles, the usage patterns of people inside, ownership, and comfort requirements. SPORTE2 aims to manage and optimize the triple dimensions of energy flows (generation, grid exchange, ...
Read Project

 10

 FINISHED 
Background Energy consumption in EU buildings is increasing and Directive 2002/91/EC aims to develop an energy efficiency certification for all buildings. This European Energy Performance of Buildings Directive (EPBD) sets minimum energy requirements that were to be included in French national legislation by the end of 2010 and implemented by the end of 2 ...
Read Project

 5

 FINISHED 
ICT 4 E2B Forum is aimed at bringing together all relevant stakeholders involved in ICT systems and solutions for Energy Efficiency in Buildings, at identifying and reviewing the needs in terms of research and systems integration as well as at accelerating implementation and take-up.ICT 4 E2B Forum intends to promote, through community building activities, a better understanding, a closer dialogue ...
Read Project

 7

 FINISHED 
More than 40% of the total energy consumed in the EU is used to cover the needs for heating, cooling and electricity of buildings. As the major part of this energy is produced from combustion of oil and natural gas, both the EU and the EU Building Sector are highly depended on imported fossil fuels. Moreover, the Sector is also a major contributor to Green-House Gas (GHG) emissions. To address iss ...
Read Project

 19