Search for European Projects

34 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Total Airport Management (PJ04 TAM)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

"Why ? : Airport Operations Management in SESAR1 promoted enhanced situational awareness via the Airport Operations Plan (AOP) whilst reinforcing the collaborative decision making process through the Airport Operations Centre (APOC). Validation activities stressed the need to further develop the Performance Monitoring and Management services promoting the evolution from a reactive (“firefighting” ...
Read Project

 30

 FINISHED 

Integrated Surface Management (PJ03a SUMO)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport Operations. The future European ATM system relies on full integration of airports as nodes into the network. In this context, PJ.03 ...
Read Project

 37

 FINISHED 

Increased Runway and Airport Throughput (PJ02 EARTH)

Start date: Dec 1, 2016, End date: Dec 31, 2019,

EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and environmental constraints impede building new runways, secondary airports are hindered by technical, infrastructure and meteorologic ...
Read Project

 35

 FINISHED 

Enhanced Air and Ground Safety Nets (PJ11 CAPITO)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Safety is at the core of ATC. However, safety is interrelated with efficiency. Air and Ground Safety Nets have been developed to increase the achieved level of safety. Necessarily, Ground and Air Safety Nets have to evolve to keep up with the challenges originating from ever increasing traffic density and complexity.ATM evolutions necessary to safely handle increasing traffic demand or to improve ...
Read Project

 14

 FINISHED 

Initial Trajectory Information Sharing (PJ31 DIGITS)

Start date: Sep 1, 2016, End date: Dec 31, 2019,

"DIGITS will contribute to reinforce the “Enabling Aviation infrastructure” key feature of SESAR 2020 by demonstrating the ATM benefits that can be realized through the use of downlinked 4D trajectory data in ground systems.The project proposes, in a close to operational environment and in fully representative operational conditions, a set of tightly coordinated development and demonstration actio ...
Read Project

 18

 FINISHED 
Single European Sky – the vision is clearly described in the ATM Masterplan. Reaching the goals for the European Airspace is only possible with focused technical developments on European level.The air traffic controller is the main player in the traffic management at tactical level. This project aims at providing the air traffic controller with more automated tools, thus freeing capacity for situa ...
Read Project

 30

 FINISHED 
PJ.16 project aims to reduce development and operating costs of Air Navigation Service Providers (ANSP). These savings will ultimately benefit airlines and their customers. It achieves this by delivering the ATM Master Plan goals (defined by the European Air Traffic Management (ATM) community) for a more efficient deployment of human resources, a progressive increase in automation support, the im ...
Read Project

 28

 FINISHED 

Content Integration (PJ19 CI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

SESAR 2020 Programme aims to modernise and harmonise the European ATM System from operational and technological perspective. It will develop and validate different ATM solutions that will contribute to achieving its high level performance objectives. In this complex context, it is crucial to have a transversal activity that generates a consolidated big picture of the future European ATM System – t ...
Read Project

 28

 FINISHED 
The PJ 14 CNS aims to specify and develop the future Technologies coming from the Communication, Navigation and Surveillance domains in order to support and manage the Operational Services, like the 4D Trajectory Management, in the future ATM System.Performance requirements for CNS systems are becoming increasingly complex and demanding and need to be considered as part of an integrated and holist ...
Read Project

 30

 FINISHED 

SWIM Technical Infrastructure (PJ17 SWIM-TI)

Start date: Nov 1, 2016, End date: Dec 31, 2019,

Single European Sky – the vision is clearly described in the European ATM Master Plan. Reaching the goals for the European Airspace is only possible with focused and extensive technical developments on European level. One of the major challenges is making sure every actor in ATM has the right information at the right time and in a consistent manner, as ATM information is the key to many concepts d ...
Read Project

 29

 FINISHED 

Integrated Airport Operations (PJ28 IAO)

Start date: Dec 1, 2016, End date: Nov 30, 2019,

"This project PJ28 which is part of the SESAR 2020 Multi annual Program (S2020 MAWP) for the period 2016-2019, will demonstrate the benefits that specific promising SESAR solutions will bring in a large and two mid-size airports, where traffic congestion daily takes place during the peak season and where new SESAR solutions are expected to assist controllers in their duty. PJ28 proposal addresses ...
Read Project

 15

 FINISHED 

Remote Tower for Multiple Airports (PJ05 Remote Tower)

Start date: Nov 1, 2016, End date: Nov 30, 2019,

"Cost-effectiveness, clearly described in the topic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA addressed by “PJ05 Remote Tower” project. It proposes the development of a remotely provided aerodrome air traffic service by a "multiple" and/or "center" setting. Those settings help to combine ATS services from various aerodromes in a centralized control roo ...
Read Project

 31

 FINISHED 

Advanced Airspace Management (PJ08 AAM)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

According to EUROCONTROL’s 2013 Challenges of Growth Report, Air traffic in the ECAC region is forecast to increase by 50% between 2012-2035 (most-likely scenario).Air traffic diversity is expected to become even more complex with the emergence of Remotely Piloted aircraft Systems (RPAS) and the multi-task nature of military aerial missions. The extension of free route operations will also imply m ...
Read Project

 20

 FINISHED 

Advanced DCB (PJ09 DCB)

Start date: Nov 1, 2016, End date: Oct 31, 2019,

The S2020 project “PJ09 Advanced DCB” evolves the existing DCB process to a powerful distributed network management function which takes full advantage from the SESAR Layered Collaborative Planning, Trajectory Management principles and SWIM Technology to improve the effectiveness of ATM resource planning and the network performance of the ATM system in Europe. Solution 1 develops shared situation ...
Read Project

 30

 FINISHED 
Critical Real-Time Embedded Systems (CRTES) such as railway, aerospace, automotive and energy generation systems face a disruptive challenge caused by the massive irruption of mixed-criticality systems based on multicore processors. At the same time low-power is an intensifying demand in many market segments, a competitive advantage for CRTES that have to operate with limited energy (e.g., batter ...
Read Project

 9

 FINISHED 
In search for a more competitive, multiple types of aircrafts, IMA based, avionics platform solution, the European aerospace industry has recently initiated the IMA2G paradigm thanks to the EC funded SCARLETT project.This latter successfully validated a first underlying set of IMA2G concepts (Separate Core Processing resources from I/O resources, introduce resource segments typology of electronics ...
Read Project

 39

 FINISHED 
The SUNNY project aims to contribute to EUROSUR by defining a new tool for collecting real-time information in operational scenarios.SUNNY represents a step beyond existing research projects due to the following main features:•A two-tier intelligent heterogeneous UAV sensor network will be considered in order to provide both large field and focused surveillance capabilities, where the first-tier ...
Read Project

 20

 FINISHED 
...012-RTD-1 against the activity area AAT.2012.4.4-1 “Integrated approach and demonstration to lean manufacturing of metal, composite and hybrid aircraft / engine structures” by a Consortium led by Saab AB.
Read Project

 33

 FINISHED 
The All-Electric Aircraft is a major target for the next generation of aircraft to lower consumption of non-propulsive power and thus fuel burn. To eliminate hydraulic circuits, pumps and reservoirs, Electro Mechanical Actuators (EMA) are mandatory but now need to meet cost, reliability and weight requirements from the airframers.ACTUATION2015 aims to develop and validate a common set of standard ...
Read Project

 56

 FINISHED 

Smart Intelligent Aircraft Structures (SARISTU)

Start date: Sep 1, 2011, End date: Aug 31, 2015,

The project proposal concerns the challenges posed by the physical integration of smart intelligentstructural concepts. It addresses aircraft weight and operational cost reductions as well as animprovement in the flight profile specific aerodynamic performance.This concerns material concepts enabling a conformal, controlled distortion of aerodynamicallyimportant surfaces, material concepts enablin ...
Read Project

 68

 FINISHED 
PERSEUS contributes to Europe’s efforts to monitor illegal migration and combat related crime and goods smuggling by proposing a large scale demonstration of a EU Maritime surveillance System of Systems, on the basis of existing national systems and platforms, enhancing them with innovative capabilities and moving beyond EUROSUR’s 2013 expectations, addressing key challenges: supporting the netwo ...
Read Project

 35

 FINISHED 
"The goal of BRIDGE is to increase safety of citizens by developing technical and organisational solutions that significantly improve crisis and emergency management. The key to this is to ensure interoperability, harmonization and cooperation among stakeholders on the technical and organisational level.Therefor BRIDGE delivers:- Resilient ad-hoc network infrastructures, focussing on the requireme ...
Read Project

 15

 FINISHED 

RECEPTivity and amplitude-based transition prediction (RECEPT)

Start date: Feb 1, 2011, End date: Apr 30, 2015,

...nsists of 12 organisations from 4 different member states (Sweden, Italy, France Germany) and one of International Cooperation Partner Countries, Russia. It contains 3 aircraft manufacturers (Airbus, SAAB, Piaggio), 5 research organisations (CIRA, DLR, FOI, ITAM, ONERA) and 4 universities (Kungliga Teknika Högskolan, Università di Genova, Università di Salerno, Universität Stuttgart). Participatio ...
Read Project

 12

 FINISHED 

All Condition Operations and Innovative Cockpit Infrastructure (ALICIA)

Start date: Sep 1, 2009, End date: Aug 31, 2014,

"ALICIA addresses the ACARE objective of increasing time efficiency within the future air transport system. The aim will be to develop a new and scalable cockpit application which can extend operations of aircraft in degraded conditions – “All Conditions Operations”. A key objective will be to deliver an extensible application that can be applied to many aircraft types. This will necessarily enta ...
Read Project

 42

 FINISHED 

AEROdynamic Surfaces by advanced MUltifunctional COatings (AEROMUCO)

Start date: Jan 1, 2011, End date: Apr 30, 2014,

"The main objective of the AEROMUCO project is to develop and evaluate a number of alternative – and highly innovative – active and passive multi-functional surface protection systems for future generation of aircraft, leading to a significant improvement in fuel efficiency and a reduction in CO2 and NOx emissions. Two technological routes to achieve this goal will be explored:• The reduction of t ...
Read Project

 12

 FINISHED 
...programme in this field is available in Europe while well trained researchers and engineers are scarce. The MC IMPULSE consortium unites highly complementary partners from industry (including Thales, Saab and 2 SME’s) universities and a research institute, guaranteeing an interdisciplinary research and training programme. Within MC IMPULSE 13 early stage researchers and two experienced researchers ...
Read Project

 8

 FINISHED 

Integrated Mobile Security Kit (IMSK)

Start date: Mar 1, 2009, End date: Feb 28, 2013,

"The Integrated Mobile Security Kit (IMSK) project will combine technologies for area surveillance; checkpoint control; CBRNE detection and support for VIP protection into a mobile system for rapid deployment at venues and sites (hotels, sport/festival arenas, etc) which temporarily need enhanced security. The IMSK accepts input from a wide range of sensor modules, either legacy systems or new dev ...
Read Project

 29

 FINISHED 
The MEMS-4-MMIC proposal aims at the integration of RF-MEMS switches onto Monolithic Microwave Integrated Circuits (MMIC) creating highly integrated multifunctional building blocks for high-value applications. RF-MEMS will be an essential building block of next-generation smart systems that are characterised by cost-effective and compact designs, high performance, flexibility and configurability.M ...
Read Project

 8

 FINISHED 
"The IMG4 project CRESCENDO addresses the Vision 2020 objectives for the aeronautical industry by contributing significantly to the fulfilment of three specific targets of the aeronautical industry’s Strategic Research Agenda. CRESCENDO will develop the foundations for the Behavioural Digital Aircraft (BDA), taking experience and results from VIVACE, and integrating these into a federative system ...
Read Project

 59

 FINISHED 

Cost Efficient Advanced Leading Edge Structure 2 (COALESCE2)

Start date: Apr 1, 2009, End date: May 31, 2012,

"The objective is to develop new integrated technology and design concepts for fixed leading edge structure to achieve greater than 30% reduction in recurring manufacturing and assembly cost compared to to-day’s highly fabricated structure. The Project will explore material and processing technology options for both metallic and composite structural solutions that will result in preferred concepts ...
Read Project

 9

 FINISHED 

Aerodynamic loads estimation at extremes of the flight envelope (ALEF)

Start date: May 1, 2009, End date: Apr 30, 2012,

"ALEF's objective is to enable the European aeronautical industry to create complete aerodynamic models of their aircraft based on numerical simulation approaches within the respective development processes. I.e. ALEF will kick-off a paradigm shift from greater confidence in experimentally measured loads data to greater confidence in computational results. Beyond the scope of ALEF this paradigm sh ...
Read Project

 20

 FINISHED 
The EULER project proposal gathers major players in Europe in the field of wireless systems communication integration and software defined radio (SDR), is supported by a strong group of end-users, and aims to define and actually demonstrate how the benefits of SDR can be leveraged in order to drastically enhance interoperability and fast deployment in case of crisis needed to be jointly resolved. ...
Read Project

 19

 FINISHED 

SCAlable & ReconfigurabLe Electronics plaTforms and Tools (SCARLETT)

Start date: May 1, 2008, End date: Apr 30, 2012,

"The first generation of Integrated Modular Avionics (IMA1G) has been researched via European funded research projects; PAMELA, NEVADA and VICTORIA. This technology supported a revolutionary step away from federated architectures and their classical bespoke electronics to a modular architecture with common resources. IMA1G was introduced to the market on the A380, A400M and B787 aircraft. IMA1G re ...
Read Project

 39

 FINISHED 

Localisation of Threat Substances in Urban Society (LOTUS)

Start date: Jan 1, 2009, End date: Dec 31, 2011,

...cally sent to an operations centre display unit where data is collected and evaluated for further action. The LOTUS consortium consists of three research institutes (FOI, TNO, AIT), two industries (SAAB, Bruker), three SMEs (Portendo, Ramem,Bruhn NewTech), the University of Barcelona, and a group of End Users."
Read Project

 10