Virtualisation of the testing environment (VITE)

Start date: Nov 1, 2016, End date: Oct 31, 2018,

The VITE proposal is addressed to the call S2R-OC-IP2-02-2015-IT virtualization of testing environment. The main objective of VITE proposal is to reduce on-site tests for signalling systems leading to reducing overall testing costs. To achieve this main objective the work is organized in two main streams:First, to propose a testing framework by carefully analysing user’s needs and current situatio ...
Read Project

 11

 FINISHED 

Innovative Intelligent Rail (IN2RAIL)

Start date: May 1, 2015, End date: Apr 30, 2018,

IN2RAIL is to set the foundations for a resilient, consistent, cost-efficient, high capacity European network by delivering important building blocks that unlock the innovation potential that exists in SHIFT2RAIL: innovative technologies will be explored and resulting concepts embedded in a systems framework where infrastructure, information management, maintenance techniques, energy, and engineer ...
Read Project

 56

 FINISHED 

ERTMS on SATELLITE – Enabling Application Validation (ERSAT EAV)

Start date: Feb 1, 2015, End date: Jan 31, 2017,

The main ERSAT EAV objective is to verify the suitability of EGNSS (including EGNOS and Galileo early services) for safety railway application, in particular in regional lines scenario, for which a safe localization of the trains, based on satellite technologies, will be defined and developed, leading the way for the harmonization with the European ERTMS standard, by implementing the solution on ...
Read Project

 14

 FINISHED 
"The aim of this project is a step-change in railway capacity by reducing delays and improving traffic fluidity. This will be achieved by a partnership between railway industry experts, system integrators, small dynamic knowledge led companies and academic researchers.There are 4 levels of work:L1: High level principles, definitions and requirements to direct researchL2: Methods and algorithms der ...
Read Project

 19

 FINISHED 
Facing the problem of enhancing the railway security with a systematic top-down approach (i.e. to search for an all-inclusive solution valid for all the conceivable threat scenarios) is judged by PROTECTRAIL members too ambitious even if it could generate potential economies of scale and effort rationalisation. The proposed PROTECTRAIL approach is therefore to split the problem of making the railw ...
Read Project

 31

 FINISHED 
TIGER Project developed under the 7FP addresses the issues of promoting sustainable logistics introducing innovative railway services connecting the sea ports of the European Union with the Hinterland. This is done with particular attention to the flows generated to/from the Far East and South East Asia, involving all European major Ports, suffering from traffic congestion. In particular, two Nort ...
Read Project

 19

 FINISHED 
The recent EU Commission paper on the establishment of a “Primary European Rail Freight Network” is the confirmation that Europe wants to develop a long term freight sustainable mobility.Infrastructure investments are costly and take long time to come to fruition. Hence force the need to adopt a realistic mid term strategy for developing the use of freight trains to bridge the gap up to when the ...
Read Project

 23

 FINISHED 

ERRAC Road Map

Start date: Jun 1, 2009, End date: Jul 31, 2012,

ERRAC- ROADMAP covers research related to all types of freight and passenger rail services as well as their interaction with other modes within the transport system (High Speed and conventional rail over long, medium and short distances, as well as urban rail and co-modal services), the implementation of such research, and to support the various activities of the European Rail Research Advisory Co ...
Read Project

 21

 FINISHED 

INtegrated European Signalling System (INESS)

Start date: Oct 1, 2008, End date: Mar 31, 2012,

"Due to the seamless guidance by rails, the railway system requires a dedicated signalling sub-system, whereby a major part of the functionality must be ensured and controlled on the infrastructure side. From a European perspective, the traditional signalling is one of the most conservative parts of the railway system strongly bound to the national traditions by all involved parties.Since 1990 the ...
Read Project