 FINISHED 

Massive InteGRATion of power Electronic devices (MIGRATE)

Start date: Jan 1, 2016, End date: Dec 31, 2019,

By 2020, several areas of the HVAC pan-European transmission system will be operated with extremely high penetrations of Power Electronics(PE)-interfaced generators, thus becoming the only generating units for some periods of the day or of the year – due to renewable (wind, solar) electricity. This will result in i) growing dynamic stability issues for the power system (possibly a new major barrie ...
Read Project

 24

 FINISHED 
"A group of eight Transmission System Operators with a generator company, manufacturers and research organisations, propose 5 demonstration projects to remove, in 4 years, several barriers which prevent large-scale penetration of renewable electricity production in the European transmission network. The full scale demonstrations led by industry aim at proving the benefits of novel technologies cou ...
Read Project

 39

 FINISHED 
A group of 6 Transmission System Operators (Belgium, Denmark, France, Germany The Netherlands and Spain) with 2 generator companies, 5 manufacturers and research organisations, propose 6 demonstration projects to remove, in 3 years, several barriers which prevent the electric system from welcoming more wind electricity, and wind electricity from contributing more to the electric system. The full s ...
Read Project

 29

 FINISHED 
...opriate non disclosure agreements, in order to address first the market behaviour of fully rational players, and next the impact of non optimal behaviours, using agent modelling. Results will be compared (possibly ranked) before being packaged and presented to the TSO community and regulatory authorities for analysis of the platform potential and trustworthiness of the simulation results. This dem ...
Read Project

 15

 FINISHED 

Pan European Grid Advanced Simulation and state Estimation (PEGASE)

Start date: Jul 1, 2008, End date: Jun 30, 2012,

...rvative security margins and improving the identification of real risks. Operating with higher power flows and closer to real available transfer capacities determined more transparently from the shared real-time model will enhance the cross-border electricity market. Eventually, the first European dispatcher training simulator will be at arm length for use in a European training center allowing th ...
Read Project

 25

 FINISHED 

Mobile Energy Resources in Grids of Electricity (MERGE)

Start date: Jan 1, 2010, End date: Dec 31, 2011,

...consists of methods and programs of modeling, analysis, and optimization of electric networks into which electric vehicles and their charging infrastructure is integrated. The MERGE concept is inspired from consideration of DER deployment but differs in that we consider now the resources to be mobile in terms of their connection to the grid. Analogies will be derived and adapted to the case of mob ...
Read Project

 16

 FINISHED 
...nd, the large-scale integration of wind power causes several difficulties in the management of a power system. Often, a high level of reserves is allocated to account for wind power variability, thus reducing the benefits from the use of wind energy.Today it is widely recognized by end-users such as Transmission System Operators, utilities a.o. that forecasts of the power output of wind farms up t ...
Read Project

 22

 FINISHED 
Social pressures, linked to protection of natural resources and environment, hinder the expansion of electricity grids and the installation of conventional electrical generation units in isolated power systems. Those systems can be defined as systems not interconnected with other neighbouring systems by tine lines and restricted to use their own resources for maintaining synchronous operation.Comp ...
Read Project

 7