Reconstruction Planning of Baja-Bezdan Canal (RPBBC)

Start date: Aug 31, 2010, End date: Feb 28, 2012,

The target area of this particular project is the Baja-Bezdán canal. The Baja-Bezdán canal starts at Baja with an outlet from the Sugovica and 44 kilometres to south connects to the Duna-Tisza canal. Its length is 33 km on the Hungarian territory and passes the administrative regions of 7 settlements. On the Serbian side it crosses further 3 settlements and also nature reserves on both sides. Aim ...
Read Project

 2

 FINISHED 
In our project we will develop the modeling background of Tisza River. It ensures to choose the right activities in between the dikes. Main inputs of the model are the characteristic data of the cross-section, and discharge and water level values. On the Hungarian side the instruments used to measure the necessary input values of the model will be developed. A boat will be bought with hydrometrica ...
Read Project

 3

 FINISHED 
The general objective of the project was to develop an action plan, the implementationof which improves environmental potential as well as ensures its sustainabilitythrough financial contributions from the stakeholders. Good environmentalpotential ensures the preservation of the natural values of the watershed and theirsustainability and it also contributes to developing the region’s economic pote ...
Read Project

 7

 FINISHED 
The proposals formulated in the project aim to increase flood protection security along the common Danube section of Hungarian-Serbian interest. Modernization of the water level and water output measuring station at Baja cannot be postponed any longer. Later on the modernized Baja station can serve as a reference for the establishment of other main stations along the Danube section concerned (appr ...
Read Project

 2

 FINISHED 
In order to reduce damage by flood and to create equal capabilities for protection, it has become reasonable to prepare and implement dike reinforcement works along the section between the state border and Homorúd. Design works had to be launched from the state border, in the first phase in the section between 0+000-2+100 tkm within the territory of Bács-Kiskun County. Floods represent a frequent ...
Read Project

 2

 FINISHED 
The project aimed at the planning of optimal river control interventions oncritical sections of the Danube. Dangerous bottom sections in terms of floodsand ice movement have been identified on the section of mutual interest of theDanube and optimal interventions have been determinded by way of hydrodynamicmodelling. This modelling aimed at the description of morphologic processes on thebottom as w ...