Search for European Projects

13 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The Modern2020 project aims at providing the means for developing and implementing an effective and efficient repository operational monitoring programme, taking into account the requirements of specific national programmes. The work allows advanced national radioactive waste disposal programmes to design monitoring systems suitable for deployment when repositories start operating in the next deca ...
Read Project

 28

 FINISHED 
The multidisciplinary project will address key technical issues that must be tackled to support the implementation of planned geological disposal projects for higher-level radioactive wastes across the EU. Our current understanding of the impact of microbial metabolism on the safety of geological repositories remains tenuous, even though microorganisms may have controlling influences on wasteform ...
Read Project

 15

 FINISHED 

Full Scale Demonstration of Plugs and Seals (DOPAS)

Start date: Sep 1, 2012, End date: Aug 31, 2016,

DOPAS aims to improve the adequacy and consistency regarding industrial feasibility of plugs and seals, the measurement of their characteristics, the control of their behavior over time in repository conditions and also their hydraulic performance acceptable with respect to the safety objectives.This DOPAS project addresses the design basis, reference designs and strategies to demonstrate the comp ...
Read Project

 17

 FINISHED 
"In line with the Lisbon strategy and 2020 perspective “Petrus” initiative coordinates since 2005 universities, WMOs, training organisations and research institutes efforts to develop cooperative approach to education and training (E&T) in the geological disposal with the purpose of expanding this cooperation under PETRUS3.PETRUS3 project aims at continuation of the European Cooperation in this ar ...
Read Project

 20

 FINISHED 
Recent safety assessments nuclear waste repositories have shown that the formation and stability of colloids may have a direct impact on the overall performance of the repository.The main aim of the BELBaR project is increase the knowledge of the processes that controls clay colloid stability, generation and ability to transport radionuclides. The overall purpose of the project will be to suggest ...
Read Project

 18

 FINISHED 
The Implementing Geological Disposal of Radioactive Waste – Technology Platform (IGD-TP) was established in 2009.This project through a Secretariat, aims at further deepening integration and coordination of the activities of the IGD-TP participants. This project includes activities involving all committed participants (80) and beyond all interested entities through Exchange Forums.The proposed Wor ...
Read Project

 4

 FINISHED 

Large Underground Concept Experiments (LUCOEX)

Start date: Jan 1, 2011, End date: Aug 31, 2015,

...y analyses, and ultimately to increased confidence in the safety case ...”Waste implementers (WMOs) being deeply involved in experiments in underground laboratories (SKB, Andra, Nagra and Posiva) address these objectives by implementing a joint collaboration regarding large underground concept experiments “LUCOEX”, which meets the FP7 work programme theme of Fission-2010 1.1.1. The included exper ...
Read Project

 4

 FINISHED 

Reducing Uncertainty in Performance Prediction (REDUPP)

Start date: Apr 1, 2011, End date: Mar 31, 2014,

"At the core of the safety case for long-term geologic disposal for spent nuclear fuel lie the issues regarding spent fuel dissolution. We have today significant knowledge regarding dissolution of uranium oxide in the laboratory. However, uncertainties remain regarding spent fuel dissolution under realistic conditions. Two main questions stand out as necessary to address: First, the synthetic grou ...
Read Project

 6

 FINISHED 
The MoDeRn project aims at providing a reference framework for the development and possible implementation of monitoring activities and associated stakeholder engagement during relevant phases of the radioactive waste disposal process, i.e. during site characterisation, construction, operation and staged closure, as well as a post-closure institutional control phase. Monitoring provides operators ...
Read Project

 18

 FINISHED 

Fate of Repository Gases (FORGE)

Start date: Feb 1, 2009, End date: Sep 30, 2013,

"The multiple barrier concept is the cornerstone of all proposed schemes for underground disposal of radioactive wastes. The concept invokes a series of barriers, both engineered and natural, between the waste and the surface. Achieving this concept is the primary objective of all disposal programmes, from site appraisal and characterisation to repository design and construction. However, the perf ...
Read Project

 25

 FINISHED 

REDOX PHENOMENA CONTROLLING SYSTEMS (RECOSY)

Start date: Apr 1, 2008, End date: Mar 31, 2012,

Main objectives of ReCosy are the sound understanding of redox phenomena controlling the long-term release/retention of radionuclides in nuclear waste disposal and providing tools to apply the results to Performance Assessment/Safety Case. Although redox is not a new geochemical problem, different questions are still not resolved and thus raised by implementers and scientists. From a top-down appr ...
Read Project

 32

 FINISHED 
The aim of this proposal is to enable present and future professionals on radioactive waste management in Europe, whatever their initial disciplinary background, to follow a training programme on geological disposal which would be widely recognized across Europe. This ambitious aim will only be achieved over a close collaboration between all stakeholders and through an effective and flexible use o ...
Read Project

 16

 FINISHED 
"European Council outlined in its Decision 2006/976/EURATOM a need for ""Implementation-oriented R&D activities on all remaining key aspects of deep geological disposal"". Waste implementers (WMOs) in Europe initiated a technology platform Implementing Geological Disposal of Radioactive Waste (IGD-TP) to foster, to promote and to accelerate the implementation of geological disposal. The mission o ...
Read Project

 4