Search for European Projects

6 European Projects Found

Searched on 125080 European Projects

 FINISHED 

Graphene-based disruptive technologies (GrapheneCore1)

Start date: Apr 1, 2016, End date: Mar 31, 2018,

This project is the second in the series of EC-financed parts of the Graphene Flagship. The Graphene Flagship is a 10 year research and innovation endeavour with a total project cost of 1,000,000,000 euros, funded jointly by the European Commission and member states and associated countries. The first part of the Flagship was a 30-month Collaborative Project, Coordination and Support Action (CP-CS ...
Read Project

 158

 FINISHED 
"The key objective of the M4CO2 project is to develop and prototype Mixed Matrix Membranes based on highly engineered Metal organic frameworks and polymers (M4) that outperform current technology for CO2 Capture (CO2) in pre- and post-combustion, meeting the energy and cost reduction targets of the European SET plan.By applying the innovative concept of M4 by a consortium of world key players, con ...
Read Project

 17

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 
This project deals with a central problem of filtration systems and in particular of membranes: biofilms and bio-fouling. By its very nature, the surface of a filter is an open structure in which microorganisms can readily settle. Nutrients available in the in-feed enable these to grow. As a result biofilms develop leading to an overall reduction of filtration efficiency of 30-50%, unstable proces ...
Read Project

 7

 FINISHED 
... purification system was used in the tests. This included an innovative control system based on neural nets, which compared two different technologies (Inge’s membrane technology and Polymem’s hollow-fibre membrane technology). Outcomes were anticipated not only to help improve the environmental credentials of Europe’s textile sector but also offer transferability to leather and pulp sector ...
Read Project

 9

 FINISHED 

CO2 Enhanced Separation and Recovery (CESAR)

Start date: Feb 1, 2008, End date: May 31, 2011,

"CESAR aims for a breakthrough in the development of low-cost post-combustion CO2 capture technology to provide economically feasible solutions for both new power plants and retrofit of existing power plants which are responsible for the majority of all anthropogenic CO2 emissions (worldwide, approx. 5,000 power plants emit around 11 GtCO2/year). CESAR focuses on post-combustion as it is the only ...
Read Project

 22