Search for European Projects

26 European Projects Found

Searched on 125080 European Projects

 FINISHED 
The productivity of the serial production model is compromised by the need to perform changes in the production equipment that cannot support multiple operations in dynamic environments. Low cost labour is no longer an option for EU manufacturers due to the fast rise of wages and the increasing costs of energy and logistics. Manual tasks cannot be fully automated with a good ratio of cost vs robus ...
Read Project

 8

 FINISHED 

Scalable automation for flexible production systems (ScalABLE4.0)

Start date: Jan 1, 2017, End date: Jun 30, 2020,

The main objective of the ScalABLE 4.0 project is the development and demonstration of an open scalable production system framework (OSPS) that can be used efficiently and effectively to visualize, virtualize, construct, control, maintain and optimize production lines. The OSPS aims to provides this through a) a tight integration of the enterprise information systems with transformable automation ...
Read Project

 8

 FINISHED 
The recent trends of mass customization of products and lean approaches impacts production by a drastic reduction of production lot sizes. However, traditional automation and robotics fail to be competitive in such a context since all individual product variant would require a complete automation project. In addition, keeping up with the introduction of robots outside of the traditional sectors re ...
Read Project

 9

 FINISHED 

AUTOmated driving Progressed by Internet Of Things (AUTOPILOT)

Start date: Jan 1, 2017, End date: Dec 31, 2019,

"Automated driving is expected to increase safety, provide more comfort and create many new business opportunities for mobility services. The market size is expected to grow gradually reaching 50% of the market in 2035. The IoT is about enabling connections between objects or "things"; it’s about connecting anything, anytime, anyplace, using any service over any network. There is little doubt that ...
Read Project

 43

 FINISHED 

High energy lithium sulphur cells and batteries (HELIS)

Start date: Jun 1, 2015, End date: May 31, 2019,

Lithium sulphur batteries (LSB) are viable candidate for commercialisation among all post Li-ion battery technologies due to their high theoretical energy density and cost effectiveness. Despites many efforts, there are remaining issues that need to be solved and this will provide final direction of LSB technological development. Some of technological aspects, like development of host matrices, in ...
Read Project

 16

 FINISHED 
The aim of the project “Euro-Sequences” is to establish a multidisciplinary training network on the emerging topic of sequence-controlled polymers. It has been shown during the last 5 years that such polymers open up unprecedented options for the future of manmade materials. Indeed, similarly to biopolymers such as DNA and proteins, synthetic sequence-controlled polymers contain precisely engineer ...
Read Project

 9

 FINISHED 

Efficient Urban LIght VEhicles (EU-LIVE)

Start date: Jun 1, 2015, End date: May 31, 2018,

"EU-LIVE will provide a comprehensive European solution for the next generation of electrified, cost- and energy-efficient light urban vehicles to cope with the challenges of future personal urban mobility, based on both user needs and acceptance.EU-LIVE will establish the "EU-LIVE modular platform", a systematic approach for efficiently designing, developing and building a wide range of L-categor ...
Read Project

 13

 FINISHED 

LIssage de COrdons Robotisé Novateur Expert (LICORNE)

Start date: Nov 1, 2015, End date: Oct 31, 2017,

The project aims to provide and commercialize a self-adjusting bead forming process able to control the quality of the sealing material in car manufacturing industry. LICORNE (LIssage de COrdons Robotisé Novateur Expert) is an innovative automatic vacuum forming solution able to control and adjust itself in front of the variability. The robotized forming operations are repeatable and 100% certifie ...
Read Project

 5

 FINISHED 
AdaptIVe will enhance the performance and improve the acceptance of automated driving of cars and trucks. The project develops new and integrated automated functions to improve traffic safety by minimizing the effects of human errors and to enhance traffic efficiency by smoother flows and reduced congestion.The approach is based on a shared control concept, assuring proper collaboration between th ...
Read Project

 32

 FINISHED 
Part handling during the assembly stages in the automotive industry is the only task with automation levels below 30% due to the variability of the production and to the diversity of suppliers and parts. The full automation of such task will not only have a huge impact in the automotive industry but will also act as a cornerstone in the development of advanced mobile robotic manipulators capable o ...
Read Project

 7

 FINISHED 

Ultra Conductive Copper-Carbon Nanotube Wire (UltraWire)

Start date: Oct 1, 2013, End date: Sep 30, 2016,

The most common traditional materials used in electrical energy distribution systems are copper and copper alloys. Modern applications show an increasing demand for better heat and electric current carrying capacity at the level beyond copper base materials. Nanocarbon materials, such as carbon nanotubes and graphene have attracted attention due to their high electrical, thermal conductivity and e ...
Read Project

 14

 FINISHED 
Automotive industry is looking for reducing energy consumption by using lightweight structures instead of some metal parts. This fact is causing the introduction of plastic sections. But, as metals cannot be excluded as fundamental material in many applications; many products are made of multi-components where several types of materials are introduced. Up to date, the stable joining of plastics an ...
Read Project

 8

 FINISHED 

Best Training for Green and Silent Mobility (GRESIMO) (GRESIMO)

Start date: Oct 1, 2011, End date: Sep 30, 2015,

"Engineering for future mobility must be inspired by ecology and economy to enable green and silent vehicles. Current university based education is focusing on classical fields like mechanical engineering on one side with some aspects of Noise, Vibration & Harshness (NVH) and Light Weight Design (LWD) or like electrical engineering covering aspects of “Electrification” & “Hybridisation” on the oth ...
Read Project

 9

 FINISHED 

Security and Safety Modelling (SESAMO)

Start date: May 1, 2012, End date: Jun 30, 2015,

"The SESAMO project addresses the root causes of problems arising with convergence of safety and security in embedded systems at architectural level, where subtle and poorly understood interactions between functional safety and security mechanisms impede system definition, development, certification, and accreditation procedures and standards. Intense market innovation is being held back by this r ...
Read Project

 21

 FINISHED 
"Recent studies suggest that vehicles, driven in electric mode, either hybrid or pure electric vehicles, are considerably quiet and, thus, that they constitute a safety hazard for pedestrians and bicyclists in traffic. It is claimed that such vehicles are not acoustically perceived due to the power unit being exchanged from a combustion engine to electric motors; something that essentially cuts aw ...
Read Project

 13

 FINISHED 
Description Optimal energy consumption and recovery for electric vehiclesA central goal of OpEneR is the investigation of an innovative and highly efficient overall energy manager that uses information from underlying subsystems to generate optimal driving and operation strategies. The strategies will vary from time optimised up to range ...
Read Project

 6

 FINISHED 
According to the World Health Organisation Global status report on road safety 2009, pedestrians account for more than 19% of road fatalities in the EU-27. It is well known that most accidents with pedestrians are caused by the driver being in alert or misinterpretation of the situation. For that reason advanced forward looking integration safety systems have a high potential to improve safety for ...
Read Project

 13

 FINISHED 
The objective of the DRIVE C2X Integrated Project is to carry out comprehensive assessment of cooperative systems through Field Operational Tests in various places in Europe in order to verify their benefits and to pave the way for market implementation. This general objective is split into four major technical objectives:\n•Create a harmonised Europe-wide testing environment for cooperative syste ...
Read Project

 36

 FINISHED 
Hydrogen-based energy conversion devices, especially proton exchange membrane fuel cells (PEMFC), are known to be sensitive to hydrogen fuel impurities. In this context, adequate specification of hydrogen quality, as well as means of checking H2 fuel compliance, are crucial to warrant reliability of these devices. Besides, a technical and economical compromise between performance loss and purifica ...
Read Project

 15

 FINISHED 

High Energy Lithium-Ion Storage Solutions (HELIOS)

Start date: Nov 1, 2009, End date: Oct 31, 2013,

"The reluctance of OEM worldwide to extend electric drive applications to the private customers depends partly from considerations on customer acceptance (limited range in the case of EV, long charging time after depletion of the battery, cost), but also from the increased reliability and life span that private customers are entitled to expect.The first goal of HELIOS project is to evaluate electr ...
Read Project

 22

 FINISHED 
"The objective of POLLUX is to develop a distributed real time embedded systems platform for next generation electric vehicles, by using a component and programming-based design methodology. Reference designs and embedded systems architectures for high efficiency innovative mechatronics systems will be addressed with regard to requirements on composability, networking, security, robustness, diagno ...
Read Project

 37

 FINISHED 

Reduced Certification Costs for Trusted Multi-core Platforms (RECOMP)

Start date: Apr 1, 2010, End date: Mar 31, 2013,

"The proposed RECOMP (Reduced certification cost for trusted multi-core platforms) research project will establish methods, tools and platforms for enabling cost-efficient certification and re-certification of safety-critical systems and mixed-criticality systems, i.e. systems containing safety-critical and non-safety-critical components.RECOMP recognizes the fact that the increasing processing po ...
Read Project

 40

 FINISHED 
"ASSESS mobilises the European research community and car industry to develop a relevant set of test and assessment methods applicable to a wide range of integrated vehicle safety systems. Methods will be developed for driver behavioural aspects, pre crash sensing performance and crash performance under conditions influenced by pre crash driver and vehicle actions. The gained know-how will be impl ...
Read Project

 16

 FINISHED 

Frontal Impact and Compatibility Assessment Research (FIMCAR)

Start date: Oct 1, 2009, End date: Sep 30, 2012,

"For the real life assessment of vehicle’s safety in frontal collision the compatibility (described by the self protection level and the structural interaction) between the opponents is crucial. Although compatibility has been analysed worldwide for years, no final assessment approach was defined. Taking into account the EEVC WG15 and the FP5 VC-COMPAT project activities, two test approaches are t ...
Read Project

 19

 FINISHED 

Digital Humans for Ergonomic design of products (DHErgo)

Start date: Sep 1, 2008, End date: Nov 30, 2011,

Ergonomic evaluation of a product requires building up a physical mock-up or a prototype, having a group of experts or a representative sample of users to test it and to give their discomfort feeling. This is an expensive and time-consuming process. Digital Mock-Ups together with Digital Human Models, are more and more used in the early phase of product design for reducing the product development ...
Read Project

 11

 FINISHED 
AFT-IFTIM, an association for the development of training in the transport sector, is coordinating the NOVALOG project with a view to providing a full range of information on the conditions and methods for promoting vocational training opportunities in the rapidly growing logistics sector, which employs 12% of the active population. Managed by five research centres, the partnership also includes t ...
Read Project

 11