Search for European Projects

6 European Projects Found

Searched on 125080 European Projects

 FINISHED 
Building integrated photovoltaics (BIPV) is a promising area while it is still considered as a novelty dedicated only to exclusive construction. However, BIPV potential is much greater and many more solutions could be developed and BIPV could become a broadly accepted technology if the main barriers, hindering the market deployment are overcome.SMART-FLeX consortium aims to address the identified ...
Read Project

 8

 FINISHED 

Demonstration of high EFFiciency Stirling HEAT pump (EFFIHEAT-DEMO)

Start date: Apr 1, 2014, End date: Mar 31, 2016,

The need of innovative solutions for buildings heating and air-conditioning systems is driven by economical and environmental concerns, which are strongly supported by EU Directives. Buildings account for 40% of total energy consumption in the European Union . The sector is expanding, which is bound to increase its energy consumption. Therefore, reduction of energy consumption and the use of energ ...
Read Project

 7

 FINISHED 
The overall objective of SOLARROK is to deepen the transnational cooperation between leading European research-driven clusters in the Photovoltaic (PV) sector. To gain a competitive position and to foster industrial innovation, EU research infrastructures require more and more resources: multidisciplinary competencies, investments for technical equipments, skilled human resources, and strong links ...
Read Project

 16

 FINISHED 
The achievement of the goals of the European energy and climate change policy necessitates the development and deployment of a diverse portfolio of low carbon energy technologies. In 2010, photovoltaic (PV) technology was the leading renewable energy technology in terms of capacity growth in Europe. But for reaching the main sectorial target: “up to 15% of the EU electricity will be generated by s ...
Read Project

 8

 FINISHED 

Development of high EFFiciency Stirling HEAT pump (EFFiHEAT)

Start date: Oct 1, 2011, End date: Sep 30, 2013,

Buildings account for 40% of total energy consumption in the European Union and the sector is expanding. Therefore, reduction of its energy consumption (by 20% by 2020) and the use of energy from renewable sources constitute important measures needed to reduce EU energy dependency and greenhouse gas emissions. A significant number of buildings must become energy positive integrating renewable ener ...
Read Project

 8

 FINISHED 
"In order to control the calving interval, and therefore to optimise milk production and maximise offspring in dairy cattle, artificial insemination (AI) is widely used. Currently, the conception rate of AI varies from 30% to 70%, the most critical aspect of successful conception being the timing of the insemination. Highest conception rates are achieved when the insemination is done 8 to 12 hours ...
Read Project

 10