Search for European Projects

28 European Projects Found

Searched on 125080 European Projects

 FINISHED 
"The goal of the project is to study, design and analyze on a risk-based approach a security system relying on multiple technologies for the protection of space control ground stations (SCGSs) against physical and cyber attacks and for intelligent reconfiguration of the ground station network in the case that one or more nodes fail.The SCOUT system is composed of three subsystems:1) A distributed ...
Read Project

 9

 FINISHED 
ACTPHAST is a unique "one-stop-shop" European access centre for photonics innovation solutions and technology support (Access CenTre for PHotonics innovAtion Solutions and Technology support). ACTPHAST will support and accelerate the innovation capacity of European SMEs by providing them with direct access to the expertise and state-of-the-art facilities of Europe's leading photonics research cent ...
Read Project

 29

 FINISHED 
Our goal is to develop technology for fast optical communication using revolutionary concepts that challenge the mainstream approaches for photonics integration and packaging. The primary application is optical communication inside high performance computing systems, such as supercomputers and datacenters, but the technologies will also find use in many other applications.Power-efficient InP VCSEL ...
Read Project

 8

 FINISHED 

Integrated Reconfigurable silicon photonic based optical Switch (IRIS)

Start date: Jan 1, 2014, End date: Dec 31, 2016,

IRIS aims at fabricating a highly integrated, scalable, transparent and high capacity WDM Photonic Switch used as an Transponder Aggregator (TPA),a novel function which will be added to existing ROADM nodes without disrupting their architecture while adding attributes such as colourless, directionless and contentionless. For Metro networks, this switch will provide flexibility, energy efficiency, ...
Read Project

 8

 FINISHED 

Federation for FIRE (Fed4FIRE)

Start date: Oct 1, 2012, End date: Sep 30, 2016,

A federation of experimentation facilities will significantly accelerate Future Internet research. Fed4FIRE will deliver open and easily accessible facilities to the FIRE experimentation communities, which focus on fixed and wireless infrastructures, services and applications, and combinations thereof. The project will develop a demand-driven common federation framework, based on an open architect ...
Read Project

 43

 FINISHED 

Graphene-Based Revolutions in ICT And Beyond (GRAPHENE)

Start date: Oct 1, 2013, End date: Mar 31, 2016,

This Flagship aims to take graphene and related layered materials from a state of raw potential to a point where they can revolutionize multiple industries – from flexible, wearable and transparent electronics, to new energy applications and novel functional composites.Our main scientific and technological objectives in the different tiers of the value chain are to develop material technologies fo ...
Read Project

 154

 FINISHED 

Community Networks Testbed for the Future Internet (CONFINE)

Start date: Oct 1, 2011, End date: Sep 30, 2015,

Community networks are an emerging and successful model for the Future Internet across Europe and far beyond. The CONFINE project complements existing FIRE infrastructure by establishing a new facility built on the federation of existing community IP networks constituted by more than 20,000 nodes and 20,000 Km of links. These community networks incorporate a large and wide variety of commodity ...
Read Project

 24

 FINISHED 
It is the purpose of EuConNeCts, a Supporting Action, to organise the following 2 editions, 2014 and 2015, of the EC sponsored conference in the area of communication networks and systems. The conference will be named EuCNC - European Conference on Networks and Communications. EuCNC will serve as a technical and scientific conference for researchers, namely European ones, to show their work in t ...
Read Project

 5

 FINISHED 

Cognitive Radio Experimentation World (CREW)

Start date: Oct 1, 2010, End date: Sep 30, 2015,

The main target of CREW is to establish an open federated test platform, which facilitates experimentally-driven research on advanced spectrum sensing, cognitive radio and cognitive networking strategies in view of horizontal and vertical spectrum sharing in licensed and unlicensed bands.The CREW platform incorporates 5 individual wireless testbeds (heterogeneous ISM @ iMinds-Gent, heterogeneous l ...
Read Project

 17

 FINISHED 
This proposal details activities that will ensure the continued enhancement and ongoing operation of the leading-edge GÉANT network, supporting a range of network and added-value services, targeted at users across the GÉANT service area.In the area of multi-domain network service operation, GN3plus plans to deliver fast, efficient provisioning of advanced services, develop operational support acro ...
Read Project

 72

 FINISHED 

REVerse engineering of audio-VIsual coNtent Data (REWIND)

Start date: May 1, 2011, End date: Apr 30, 2014,

With the rapid proliferation of inexpensive acquisition and storage devices multimedia objects can be easily created, stored, transmitted, modified and tampered with by anyone. During its lifetime, a digital object might go through several processing stages, including multiple analog-to-digital (A/D) and digital-to-analog (D/A) conversions, coding and decoding, transmission, editing (either aimed ...
Read Project

 8

 FINISHED 
The project focus on studying innovative solutions enabling high-accuracy detection, identification, and location of objects/persons equipped with small ultra-low power tags using a network of intelligent self-configuring radio devices. Network functionalities will be enhanced to include the detection and tracking of moving objects/persons without tags eventually present in the same area.To achiev ...
Read Project

 9

 FINISHED 

PRE-industrial Photonic-based Radar dEsign (PREPARE)

Start date: Jan 1, 2013, End date: Dec 31, 2013,

The aim of PREPaRE is the design and the IPR selling of a radically new pre-industrial photonics-based radar for industrial exploitation. It steps from the ERC project PHODIR which aim was to demonstrate the feasibility and advanced properties of the photonics-based radar. PREPaRE will focus on a specific application, the integrated traffic control (air-side and land-side) in airports, where the a ...
Read Project

 1

 FINISHED 

PHOtonic-based full DIgital Radar (PHODIR)

Start date: Dec 1, 2009, End date: Nov 30, 2013,

"PHODIR project aims to study, design and realize a full digital transceiver radar demonstrator based on photonic technology both for signal generation and for RF received signal processing. Hybrid technologies merging second generation optical systems and conventional radar architecture could be the answer to issues deriving from electronic devices poor performances such high SFDR (Spurious Free ...
Read Project

 1

 FINISHED 

SmartSantander

Start date: Sep 1, 2010, End date: Nov 30, 2013,

SmartSantander proposes a unique in the world city-scale experimental research facility in support of typical applications and services for a smart city. Tangible results are expected to greatly influence definition and specification of Future Internet architecture design from viewpoints of Internet of Things and Internet of Services.This unique experimental facility will be sufficiently large, op ...
Read Project

 24

 FINISHED 

Sensor for 3D Vision (3DV)

Start date: Jun 1, 2012, End date: Oct 31, 2013,

"A low-cost sensor able to perceive 3D information would be a breakthrough for a number of applications. Automotive applications would benefit from a low-cost obstacle detector to increase road safety; agricultural vehicles would be able to sense the environment and perform precise (and even autonomous) maneuvers improving their effectiveness; efficient sensing would be a key also to future buildi ...
Read Project

 1

 FINISHED 

Open intelligent systems for Future Autonomous Vehicles (OFAV)

Start date: Dec 1, 2008, End date: Oct 31, 2013,

The objective of this proposal is the development of an open architecture for future autonomous vehicles to become a standard platform shared by car makers in the design of next generation intelligent vehicles. It is based on 360 degrees sensorial suite which includes perceptual and decision making modules, with the ultimate goal of providing the vehicle with autonomous driving capabilities and/or ...
Read Project

 1

 FINISHED 

Medical Imaging Using Bio-inspired and Soft Computing (MIBISOC)

Start date: Oct 1, 2009, End date: Sep 30, 2013,

"Medical imaging (MI) is at the heart of many of today’s improved diagnostic and treatment technologies. Computer-based solutions are vastly more capable of both quantitative measurement of the medical condition and the pre-processing tasks of filtering, sharpening, and focusing image detail. Bio-inspired and Soft Computing (BC, SC) techniques have been successfully applied in each of the fundamen ...
Read Project

 8

 FINISHED 
Wireless networks importance for the Future Internet is raising at a fast pace as mobile devices increasingly become its entry point. However, today's wireless networks are unable to rapidly adapt to evolving contexts and service needs due to their rigid architectural design.We believe that the wireless Internet's inability to keep up with innovation directly stems from its reliance on the traditi ...
Read Project

 12

 FINISHED 
The Internet is not run by a single organization; indeed, this is a key characteristic of the Internet architecture, and a key reason behind its success as a platform for innovation in communications. Instead, the management, safety, and trustworthiness of each domain of the network are the responsibility of that domain; cooperation among these domains is largely done on a personal, and somewhat i ...
Read Project

 13

 FINISHED 
The White Paper on EU Transport Policy for 2010 states a key objective: 50% reduction of casualties due to road accidents by the end of 2010. Improvements on road safety are achievable increasing the EU market penetration of eSafety systems, currently limited by performance and cost of sensor technologies.According to ICT-2009.6.1, 2WIDE_SENSE addresses research challenges in the area of "Intellig ...
Read Project

 7

 FINISHED 

Integrating Research in Interactive Storytelling (IRIS)

Start date: Jan 1, 2009, End date: Dec 31, 2011,

Description Virtual Centre of ExcellenceInteractive Storytelling is a major endeavour to develop new media which could offer a radically new user experience, with a potential to revolutionise digital entertainment. European research in Interactive Storytelling has played a leading role in the development of the field, and this creates a u ...
Read Project

 11

 FINISHED 
NEWCOM++ is the acronym of a proposed Network of Excellence in Wireless COMmunications, submitted to Call 1 of the VII Framework Programme under the Objective ICT-2007.1.1: The Network of the Future, mainly in its target direction "Ubiquitous network infrastructure and architectures". The current proposal draws inspiration, shape/form, and substantive direction from its successful predecessor, t ...
Read Project

 35

 FINISHED 
VAALID project aims at creating new tools and methods that facilitate and streamline the process of creation, design, construction and deployment of technological solutions in the context of AAL assuring that they are accessible and usable for senior citizens. The main objective of the project is to develop a 3D-Immersive Simulation Platform for computer aided design and validation of User-Interac ...
Read Project

 9

 FINISHED 
The OPTIMIX project will focus on studying innovative solutions enabling enhanced video streaming in an IP based wireless heterogeneous system, based on cross layer adaptation of the whole transmission chain.To achieve this goal, it is proposed to develop a scheme including all elements of major importance in a point to multi point video streaming chain, in particular video coding, networking mo ...
Read Project

 9

 FINISHED 

Deployment of Remote Instrumentation Infrastructure (DORII)

Start date: Feb 1, 2008, End date: Jul 31, 2010,

The DORII project aims to deploy e-Infrastructure for new scientific communities, where on the one hand the ICT technology is still not present at the appropriate level, but on the other hand it is demanded to empower its daily work. We deal with a group of scientific users, and this is a reference for DORII, with experimental equipment and instrumentation that are not integrated or integrated onl ...
Read Project

 13

 FINISHED 

Genetic Message Oriented Secure Middleware (GEMOM)

Start date: Jan 1, 2008, End date: Jun 30, 2010,

The core scientific focus of GEMOM is the significant and measurable increase in end-to-end intelligence and resilience of complex, distributed information systems. GEMOM's definition of intelligence and resilience include:- Insensitivity or significant reduction in sensitivity to individual and sometimes multiple faults in the system. Fault is defined as any deterioration of the functional profil ...
Read Project

 10

 FINISHED 

Privacy-aware Secure Monitoring (PRISM)

Start date: Mar 1, 2008, End date: May 31, 2010,

Passive network monitoring is required for the operation and maintenance of communication networks as well as to detect frauds and attacks. Typically, raw packet-level traffic traces are collected using suitable traffic probe devices and fed to monitoring applications (IDSs, antivirus, etc..) for analysis, with potential risks for the legitimate privacy rights of the customers. This projects aims ...
Read Project

 8